TANNOY Plaster Ring Installation Guide
- June 7, 2024
- TANNOY
Table of Contents
Mechanical Installation Instructions for Optional Tannoy Plaster Ring
An optional plaster (mud) ring bracket is available from TANNOY. This bracket
is designed to be pre-installed into newly constructed, non-suspended
ceilings.
-
Nail or screw the plaster ring to the joists.
-
Lay the speaker wiring to where the speaker will be fitted and complete the plastering work on the ceiling.
-
Cut out the hole in the ceiling using a circular saw or pad saw.
-
Wire the speaker as described in the product’s documentation.
-
Slide the speaker assembly through the hole and turn the screws to extend the mounting wings. Tighten the screws until a firm grip is achieved. If using a power driver, TANNOY recommends a torque setting of 1.5 Nm.
Do Not Overtighten!
Refer to the speaker’s documentation for specific mounting instructions for that model. -
Connect a Secondary Support Line to the safety tab. Some construction codes require the use of this secondary support point, which should connect to a separate secure support point using a suitable support line. Consult construction codes in your region.
-
Insert the grille by pushing it onto the speaker.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>