D-Link DES-1009MP 9-port 10/100 PoE Switch Installation Guide

June 6, 2024
D-Link

Quick Installation Guide
DES-1009MP

D-Link DES-1009MP 9-port 10 100 PoE Switch

Before You Begin

This Quick Installation Guide gives you step-by-step instructions for setting up your DES-1009MP 9-port 10/100 PoE Switch. The model you have purchased may appear slightly different from the one shown in the illustrations.

Package Contents

This DES-1009MP package should include the following items:

  • 1 x DES-1009MP
  • 1 x Power adaptor
  • 1 x Quick Installation Guide

If any of the above items are damaged or missing, please contact your local D-Link reseller.

Hardware Overview

LED Indicators

D-Link DES-1009MP 9-port 10 100 PoE Switch - LED
Indicators

| LED| Status| Description

---|---|---|---
1| Power| Solid green| The switch is powered on.
Off| The switch is turned off.
2| Link/AmSpeed(LeftLed)| Solid green| There is an active link negotiated on this port.
Blinking green| There is traffic at the port.
Off| There is no active link on this port.
3| PoE(RightLed)| Solid green| The port is providing power to the connected PoE-powered device.
Blinking green| This indicates a PoE-powered device is connected to this PoE port, but the switch has insufficient remaining power budget to power the device.
Off| There is no PoE-powered device connected to this port.

Table 1: LED overview

Front Panel Connectors

D-Link DES-1009MP 9-port 10 100 PoE Switch - Front Panel
Connectors

# Interface Description
1 Ports 1 -8 10/100 Mbps PoE-capable ports, used for connecting Ethernet

devices and PoE-powered devices.
2| Ports 9| 10/100/1000 Mbps Ethernet port for uplink connections to NVR, storage, or core switch.

Table 2: Front connector description

Rear Panel Connectors

D-Link DES-1009MP 9-port 10 100 PoE Switch - Rear Panel
Connectors

# Connector Description
I DC Power Input Input jack for the power adapter.
2 SWITCH GND The screw is used to secure a grounding wire to connect the

switch to the ground.

Table 3: Rear connector description

Hardware Installation

Installation Precautions

For safe switch installation and operation, it is recommended to:

  • Visually inspect the DC power jack and make sure that it is fully secured to the power adapter.
  • Make sure that there is proper heat dissipation and adequate ventilation around the switch.
  • Install the switch in a site free from strong electromagnetic sources, vibration, dust, and direct sunlight.
  • Not place heavy objects on the switch.
Grounding the Switch

The following steps explain the procedure for connecting the switch to a protective ground:

  1. Verify that the system is powered off.
  2. Remove the ground screw and place the #8 terminal lug ring at one end of the ground cable on top of the ground screw opening.
  3. Insert the ground screw back into the ground screw opening.
  4. Using a screwdriver, tighten the ground screw to secure the ground cable to the switch.
  5. Attach the terminal lug ring at the other end of the grounding cable to an appropriate grounding source.
  6. Verify that the connections from the ground connector on the switch to the grounding source are securely attached.
Powering On the Switch

After connecting the switch to the network using a compatible category 5/6/7 UTP network cable, simply connect the switch to a power outlet to power the device.

http://www.dlink.com/support

TECHNICAL SUPPORT dlink.com/support

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals