METER ZL6 Data logger User Guide

June 6, 2024
METER

METER ZL6 Data logger

METER ZL6 Data logger

Preparation

Inspect and verify ZL6 components are intact. Installation will require a mounting post.
Install the enclosed batteries and press the TEST button. The status lights will eventually settle to a short, single green blink every 5 s, signaling it is ready for use.
Read the full ZL6 User Manual at metergroup.com/zl6-support. All products have a 30-day satisfaction guarantee.
NOTE: The ZL6 case is water resistant, not waterproof. See the ZL6 User Manual for tips to use the logger in extremely wet environments.

Data Access with ZENTRA Cloud

ZENTRA Cloud is a cloud-based web application to download, view, and share ZL6 data as well as change logger configurations. Visit zentracloud.com to access all ZL6 data online. A free trial of ZENTRA Cloud is available for new users.

Configuration

Test sensor function and ZL6 communications prior to field installation.
Using a Computer
Use the ZENTRA Utility Installer link on the ZL6 webpage (metergroup.com/zl6-support) to download ZENTRA Utility.
Connect the micro-USB cable to computer and logger.
Open the ZENTRA Utility application, select the appropriate COM port, and select Connect.
Using a Smartphone or Tablet
Open the mobile app store and search for ZENTRA Utility Mobile or scan the QR code to open the METER ZENTRA Apps website.
On the ZL6, push the TEST button to activate the Bluetooth module.
On the smartphone, select the device in Devices Found.

For answers to common questions, visit metergroup.com/environment/faqs/zl6

Installation

  1. Select Location
    Choose a location and orientation to give the solar panel the maximum amount of sunlight. Consider vegetation cover throughout the season, distance from power lines, livestock, metallic objects, etc.Installation

  2. Check Cellular Signal
    Use the Cellular Test feature of ZENTRA Utility or ZENTRA Utility Mobile to check the quality of the cellular signal at the chosen location.
    If the test fails, move to an alternative location (sometimes moving only a few meters is sufficient).Installation 02

  3. Fasten Logger to Mounting Post
    Use included zip ties to attach the ZL6 to a mounting post.
    Ensure the logger is installed in an upright position to reduce the possibility of water entering the ZL6 enclosure.Installation
03

  4. Install Sensors
    Install sensors according to the user manuals. Plug the sensor connectors into the ZL6 sensor ports. Secure cables to mounting post with some cable slack.
    Configure measurement interval and sensor settings using ZENTRA Utility or ZENTRA Utility Mobile. Review sensor instantaneous measurements to verify the installed sensors are working.Installation 04

SUPPORT

Have a question or problem? Our support team can help.
We manufacture, test, calibrate, and repair every instrument in house. Our scientists and technicians use the instruments every day in our product testing lab. No matter what your question is, we have someone who can help you answer it.

NORTH AMERICA
Email: support.environment@metergroup.com
Phone: +1.509.332.5600

EUROPE
Email: support.europe@metergroup.com
Phone: +49 89 12 66 52 0

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

METER User Manuals

Related Manuals