KAIDENG WVC-295 WVC Series Communication type Intelligence Micro Grid-connected Inverter User Manual
- June 6, 2024
- KaiDeng
Table of Contents
Microinverter
WVC- 295
Use Manual
Green Energy Ex Smart Inverter _per t
WVC series communication type intelligence
Micro grid-connected inverter
- Maximum power point tracking
- Reverse power transmission
- I / 0, fully isolated
- No installation, no maintenance
- Adaptive voltage/frequency
- Internal high precision meter
- App monitoring system
- Forward full-bridge topology
System diagram
Model:
System diagram
Maximum input power
Output voltage mode
PV Open circuit voltage
Operating voltage range
Starting voltage range
short-circuit current
Maximum working current| WVC-295:
300Watt
120/230V Auto switch
30-60VOC
22-60V
22-60V
13.6A
11.5A
---|---
Output parameters:
Output peak power
Rated output power
Output current
AC voltage range
AC frequency range
Power factor
Number of branches
connection| @120V:
300Watt
295Watt
2.45A
80-160VAC
48-51Hz/58-61Hz >95%
15PCS(Single)| @230V:
300Watt
295Watt
1.28A
180-280VAC
48-51Hz/58-
1Hz >95%
30PCS
Single)
Output efficiency:
Static MPPT efficiency
Max output efficiency
Loss of power at night
Total current harmonics| @120V:
99.5%
95%
<0.5W
<5%| @230V:
99.5%
95%
<0.5W
<5%
Appearance and technical features:
Temperature range
Size(L×W×H
Net amount
Waterproof grade
Heat dissipation mode
Communication mode
Power transmission
mode
Communication mode
Electromagnetic
Detection
Power Grid standard
Power grid detection
Certificate| -40°C to +65°C
213mm×167mm×32mm
0.69kg
Ip67 NEMA3R
Self-cooling
433MHz/WiFi
Reverse transmission,Load priority
433MHz/WiFi
EN50549-1,EN 50549-2,NBR 16149:2013,UL1741
IEC/EN 62109-1,IEC/EN 62109-2,IEC 62116,IEEE 1547
EN61000-6-1:2007 EN6100-6-3:2007+A1:2011+AC:2012
CE,ETL,INMETRO,Patented technology
Packing weight:
Specifications:| Each(Packing)| Box(16PCS)
Weight:
| 1KG| 15.5KG
Size:| 245×202×60mm| 430×400×270mm
System diagram
Description of the connector and cable core of the microinverter
Note: You can purchase a professionally customized AC bus with a T-type
connector.
Use this AC bus as the AC bus for each branch. Connect it hand in hand to form
a modular micro-inverter branch wiring system.
LED indicator function of micro-inverter
- Red light is on—The micro-inverter is powered on, the red light is on, and the equipment is ready to work;
- Red light flashes—-The micro-inverter is fully prepared and enters the delayed startup state;
- Flashing green MPPTMaximum PowerPoint search status;
- Greenlight is on— —MPPTMaximum PowerPoint locked state;
- The green light turns red—-
a.island protection;
b. Frequency protection;
c. AC over/under-voltage protection;
d. DC voltage over and under-voltage protection;
e. fault; f. software shutdown;
Normal working indicator flashing process:
Connect the micro-inverter to the AC and DC terminals, and then turn on the
power — the red light will be on for 3 seconds — the red light will flash for
30 seconds — the green light will flash quickly (MPPT maxim urn PowerPoint
search)— The green light is on, (MPPT lock).
Accessories of micro-inverter
Preparation before installation:
- Please install Kayden micro inverter series products as shown in the following figure.
- Please note that only qualified personnel can install and/or replace Kaideng micro-inverters.
- Before installing or using Kaideng Micro Inverter, please read all instructions and technical instructions and the warning mark system and photovoltaic array on Kay Microinverter.
- When installing the inverter handshake cable, please plan that your AC branch circuit cannot exceed the current limit, so that the maximum number of micro-inverters in each branch can be reasonably allocated.
Inverter model| Number of branches
---|---
WVC-295| 30PCS
WVC-300| 30PCS
WVC-350| 25PCS
WVC-600| 15PCS
WVC-700| 12PCS
WVC-1000| 10PCS
WVC-1200| 8PCS
WVC-1400| 6PCS
WVC-1600| 5PCS
WVC-2000| 5PCS
WVC-2400| 3PCS
WVC-2800| 3PCS
*Each region may be different. Please refer to local requirements to define the number of micro-inverters per branch in your area.
- Implement all national electrical codes (NEC), ANSI / NFPA 70 in accordance with all local electrical codes and all relevant regulations.
- Please do not try to repair the Kaideng micro-inverter. It does not contain user-serviceable parts. If it fails, please contact Kaideng customer service to obtain the ID number and start the replacement process. Tampering or opening the Kaideng microinverter will invalidate the warranty.
- Please make sure that the installation operation is performed before the AC power is disconnected, and do not install the K -aiding micro-inverter with power on.
- After the installation of the power station is completed, please install a ground wire on the photovoltaic support, install and use lightning protection, and/or surge suppress -ion equipment protection system in the AC junction box. It is very important to have a switch device that automatically protects against lightning strikes and surges.
- In addition to Kaideng Energy’s WVC series micro-inverters, you must also purchase photovoltaic brackets / AC boxes / electrical cables and other related materials. The current of each channel of the WVC series micro-inverters at the branch of the installed circuit cannot exceed 40 Amp, if the rated current is exceeded, it may lead to an unsafe factor.
- Check if you still have the following related equipment: AC junction box, tools: screwdriver, wire cutter, voltmeter, torque wrench, socket and wrench for installing hardware, etc.
WVC-295 microinverter installation drawing
Inverter installation steps
Step1: Install the inverter on the bracket of the photovoltaic panel with the screws provided with the machine, as shown in the fo -the following figure:
Step2: Connect the positive and negative poles of the DC connection MC4 plug on the photovoltaic board to the DC input terminal of the inverter, as shown below:
Step3: Open the waterproof cover of the AC output connector of the inverter and connect the AC cable to the AC waterproof plug. The connection method is as shown in the plug connection diagram:
Step 4: Connect the AC output cable to the AC main cable;
Step 5: Repeat steps 1 to 3, install and connect all inverters;
Step 6: Connect the AC main cable to the utility grid to start your green
energy journey.
Note: Before installing WVC series microinverter products, please read
this manual and pay attention to the installation details.
This manual contains important instructions that should be followed when
installing and maintaining reduced the risk of electric shock and ensure safe
installation and ope
-ration of Kaideng MicroInverters, Always follow the following safety symbols present in this document to indicate hazardous conditions and important safety Instructions.
Wiring Diagram WVC-295 Triple Phase
Distribution network preparation tool:
When installing the KDM monitoring system, it is necessary to configure the KDM
monitoring system in advance. Please use the two-dimensional scanning function
to download and install the MxEasyLink network distribution tool. ( IOS SYSTEM
Download Password: Mxchip ).
http://d.firim.top/rlpm?utm_source=fir&utm_medium=qr
https://www.pgyer.com/o1pH?sign=&auSign=
Monitoring system distribution network instructions:
Press the reset button (A-1), release the button (A-2) when the indicator
light flashes quickly, and operate in the MxEasyLink interface of the mobile
phone. (Please explain the parameters below for Android and IOS) When the
network configuration is completed, the Ready and Link lights of the collector
will become a constant light display (A-3).
Android client configuration:
Connect the wireless network of your mobile phone to your home wireless signal
source and open the
MxEasyLink client B-1, fill in the wireless SSID and password in the software.
When the collector is in the (A-2) state, click the send command button B-2,
The system will automatically configure the network until the data string is
received, and the network configuration is successful (B-3).
IOS Client configuration:
Open the MxEasyLink client, click “+” in the upper right corner C-1 to create
network configuration settings and fill in the SSID and password, and select
the mode as “EasyLink AWS”. When the collector flashes quickly as shown in
Figure(A-2), click the “Start EasyLink AWS Mode” button is like C-2. When the
distribution network receives the module data and returns C-3. Click “Confirm”
to complete the network configuration.
KDM Monitoring System
Ready to work:
Install the “KDM Monitoring System” tool on your Android Phone
Download: http://jzi6.cn/mitp6q(You can scan the QR to Download)
Note: This application only supports Android. If you have an iPhone,
please operate in your browser and log in to the website:
kdm.kaidengdg.com
Create account:
Open KDM software D-1, first use KDM monitoring system, please click Register
D-2, register KDM account and save D-3
ADD Station:
After logging account, click “Add Station” Like Figure E-1, fill in the
Information, and fill in the 8-digit code on the back of the Modem into the
corresponding items. For example, E-2. For the electrical box option, please
select “None”, and fill in “1” “Figure E-3
ADD Inverter:
When the creation of the power station is completed, the page will
automatically jump to the interface for adding an inverter (make sure the
inverter has been installed correctly), fill in the 8-digit ID on the inverter
and click Add such as F1, after the addition is completed You can return to
query the working status of the inverter F-2 and view the basic operating
status of the power station F-3.
*** The Wi-Fi modem changes its working mode (press and hold the reset
button until the following display appears):
TCP/IP mode: Release the Ready indicator from “off→on-off”;
Internet of Things mode:** Release the Ready indicator from “off→on”;
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>