KAIDENG WVC-1200 Micro Inverter User Manual
- June 10, 2024
- KaiDeng
Table of Contents
KAIDENG WVC-1200 Micro Inverter User Manual
IoT Monitoring Platform
Smart mobile “core” life
- CO-2 induced environmental analysis
- Daily and total energy generation in kWh
- Actual DC input voltage, current and power
- Actual AC output voltage, current and power
- Inverter temperature • Historical (daily, weekly, monthly) power curve
- Power losses due to weather induced effects
- Optional limitation of power output
- Online switch for the inverter start stop
Communication mode
Model
Recommend use panels Output voltage mode PV Open circuit voltage Operating
voltage range Starting voltage range short-circuit current Maximum working
current| WVC-1200
4375Watt
120/230V
30-54VOC
22-60V
22-60V
414A
4*12A
---|---
Output parameters
Output peak power
Rated output power
Output current
AC voltage range
AC frequency range
Power factor
Number of branch connections| @120V
1200Watt
1150Watt
10A
80-160VAC
48-51Hz/58-61Hz
95%
3PCS ( Single )| @230V
1200Watt
1150Watt
5.22A
180-280VAC
48-51Hz/58-61Hz
95%
6PCS ( Single )
Output efficiency
Static MPPT efficiency Max output efficiency Loss of power at night Total current harmonics| @120V
99.5%
95%
<0.5W
<5%| @230V
99.5%
95%
<0.5W
<5%
Appearance and technical featuresTemperature range
Size ( LxWxH )
Net amount
Waterproof grade
Heat dissipation mode
Communication mode
Power transmission mode monitoring system
Electromagnetic Detection
Power Grid standard
Power grid detection
Certificate| -40°C to +65°C
370mmx300mmx41.6mm
3.0 kg
Ip65 NEMA3R
Self-cooling
433MHz
Reverse transmission,Load priority
APP
EN61000-6-1:2007 EN6100-6-3:2007+A1:2011+AC:2012
EN50549-1, EN 50549-2, NBR 16149:2013, UL1741 IEC/EN 62109-1,
IEC/EN 62109-2, IEC 62116, IEEE 1547 ”
CE , Patented technology
Packing weight
Specifications
weight
Size| Each ( Packing )
4.0 KG
430x375x140mm| Box ( 4PCS )
16.5 KG
430x405x380mm
---|---|---
Detailed
System Diagram
Description of the connector and cable core of the micro inverter
Note: You can purchase a professionally customized AC bus with a T-type
connector. Use this AC bus as the AC bus for each branch. Connect it hand in
hand to form a modular micro-inverter branch wiring system.
LED indicator function of micro inverter
- Red light keeps on ……….. The equipment enters the preparatory working state;
- Red light flashes …………. The device enters the delayed start-up state;
- Blue light flashes quickly …………… MPPT maximum power point search status;
- Blue light keeps on ……………. MPPT maximum power point locked state;
- Blue light turns to red light for a long time—a) Island protection; b)Frequency protection; c)Fault; d) Software shutdown; e) AC voltage over-voltage protection; f)DC voltage over-voltage protection;
Normal working indicator flashing process
Connect the micro-inverter correctly to the AC and DC terminals and then power
on: The red light keeps on for 3 seconds the red light flashes for 30 seconds
the blue light flashes quickly (MPPT maximum power point search) —> the blue
light keeps on, (MPPT lock).
DOWNLOAD Cloud Intelligence APP
Please use the QR code to scan and install the ‘Cloud Intelligence’ client
application,System version: Android 5.0, IOS 9 and above
https://g.aliplus.com/ilop/d.html?locale=all&pk=a1Lb0zQZdEx
note
a) Connect the two communication antennas on the collector (Modem) as
required; b) Place the collector in an appropriate location to ensure that the
will signal source can be received normally and Form a good communication
distance with the inverter; c) The connected Wi-Fi network needs to be in 2.4G
communication mode; d) Please reset the collector for the first use;
Reset
Press and hold the reset button for more than 5 seconds, and Reday will go out
and light up again after 5 seconds. Release the button at this time, and the
device will complete the reset.
Add device
Open the intelligent monitoring software “Cloud Intelligence” APP to log in
Account, click the “+” icon in the upper right corner to start adding. *If a
device has been created under the current account,(You can click on the device
icon below to enter the details page for query or operation)
Entry equipment
When the smart APP changes to the QR code scanning state, scan the QR code
label at the bottom of the Modem. At this time, the APP will automatically
collect the body code of the Modem,and automatically jump to the Wi-Fi
connection page, and enter the current Wi-Fi Click Next after the password;
Distribution network
Connect the Modem to the power supply as required, and quickly press the
“Reset” button. When the “Reday” indicator turns from a long on state to a
fast flashing state, the Modem will enter the network distribution state;
Initialization
After completing the network configuration of the modem, return to the phone
initialization device operation page,check the “I have completed the above
operations” below and click the “start connection” button, then the page will
jump to the signal search page and the Link on the modem The indicator light
will become a fast flashing state. When a WiFi signal is found,the indicator
light will flash slowly until the network configuration is completed, and the
indicator light will return to a steady state. The page jumps to the
completion page, please click “Finish”
Add inverter
When the initialization is completed, please click the “Settings” menu in the
upper right corner, find the inverter list item on the setting page, click the
“Edit” button, and fill in the 8-digit code on the inverter to complete the
inverter Add to.
Remarks
- When multiple inverters need to be added, theIn the English state, %’ comma separated and ended. Such as: 60001234, 6000E312,
- Each Modem can monitor 60 inverters at the same time;3. A total of 2 lists, each list can be filled with 30 inverter codes;
[](https://manuals.plus/wp-content/uploads/2023/05/KAIDENG-WVC-1200
-Micro-Inverter-User-Manual_15.png) Features
Smart APP can realize real-time data transmission with the cooperation of Alibaba Cloud loTThrough graphs and graphi. c displays in time, users can understand the operation of the power station. The user can monitor the operation and adjust the output power function of the system.
INTELLIGENT lot MONITORING MODEM
Number of data collectors per Modem Built-in Win loT data terminal Can be used on any smart device (Android/JOS)
- CO-2 induced environmental analysis
- Daily and total energy generation in kWh
- Actual DC input voltage, current and power
- Actual AC output voltage, current and power
- Inverter temperature
- Historical (daily, weekly, monthly) power curve
- Power losses due to weather induced effects
- Optional limitation of power output
- Online switch for the inverter start stop
Read More About This Manual & Download PDF
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>