SENKO MGT-N Docking Station User Manual
- June 6, 2024
- SENKO
Table of Contents
MGT Docking Station
Version II
User’s Manual
www.senkocanada.com
sales@senkocanada.com
WARNING
Any unauthorized attempt to repair or modify the product, or any other
cause of damage beyond the range of the intended use including damage by fire,
lightning, or another hazard, voids the liability of the manufacturer.
Do not use if the device appears to be damaged.
Use the device in a clean environment, which has no hazardous gases.
Do not use the expired gas cylinders.
Ensure to use the certified gas cylinders.
Ensure that the gas types and the concentrations match with manuals and
devices.
Severe vibration or shock to the device may cause a sudden reading
change and cause the device to malfunction.
Do not leave or use the device at a watery place or at where there is
any liquid.
**** Do not use a device that has been failed the test.
Read the operation manual before use
✓ Before the operation, read the manual carefully and follow all the
instructions.
✓ IR link communication works only when it is placed at bay 1 on the docking
station.
✓ The device only operates when the power LED turns green.
✓ Before upgrading firmware, connect the plug to avoid any data loss and
malfunction by unexpected power off. And the file names are fixed as below.
– Docking F/W File Name: DK_FW.bin,
– MGT F/W Name: MGT_FW.bin
Overview
Description
A Bump test and calibration are the key features to ensure the safety of devices and users. MGT docking station version II provides bump testing, event management, and calibration from a simple-to-use multi-unit station and gives fleet or safety managers the ability to update configurations on large fleets. It also maintains all the important event logs that demonstrate users are working within company requirements.
Instructions and Parts
No | Description |
---|---|
a | Bay LEDs |
b | Bay 1 |
c | Handle |
d | Thumbscrews |
e | Power LED |
f | Bump Test button |
g | Calibration button |
h | Bay 2, 3, 4 |
i | Pressure gauge |
j | Cylinder 58L/116L |
k | Cylinder Straps |
l | Gas regulator |
m | Cylinder compartment |
n | Exhaust port |
o | Fresh air Inlet |
p | LAN port |
q | Charging port |
r | USB port |
Key Features
✓ Zero and Span Calibration, Bump Test Function
✓ The rechargeable internal battery lasts up to 1000 bump tests on a single
charge
✓ Indicate the current status of the operation by the Power LED and Unit LED
color
✓ Configure settings and automatic update firmware of up to four MGT devices
✓ Gas Ventilation system to remove a remained gas
✓ Computer not required for normal operation
✓ Save the log events after calibration and bump test
✓ Enable users to adjust the setting points of the Docking station and MGT via
IR Link or USB
Specifications
Size | 52.5 x 43.7 x 21.3cm (20.66” x 17.20” x 8.40”) |
---|---|
Weight (Without cylinder) | 11.0kg |
Temperature | 41 to +104˚F (5 to +40˚C) |
Warranty | Full 2 years |
Battery Type | Rechargeable Lithium-Ion |
Battery Life | Up to 1,000 Bump Tests |
LEDs | 6 Blue LEDs for each bay, 3-color LED for power, Switch Back Light |
LED (Orange, Green)
Memory| USB 8GB Standard
Log Capacity| Approximately Up-to 5 million tests (8GB, removable USB
memory)
Tests Performed| Bump Test and Calibration
Information Stored| Bump/Calibration Logs, Individual Monitor Event
Logs, Firmware, and Unit Configurations
Gases Available| LEL (CH4), CO, H2S, and O2
Compatibility| Works with SP-MGT(N, P)
Calibration Gas| Compatible with 58L & 116L cylinders
Interface| Ethernet RJ-45(TCP/IP), 10Mb/s
Charging Adaptor| DC12.0V, 3A/h
Set up and Operation
Power turns on/off
The MGT Docking Station version II operates using only 2 (two) buttons for
calibration and Bump Test.
To turn on the power, follow the below:
✓ Press and hold either the Calibration or Bump Test button for 2 seconds.
✓ The Power LED turns on to orange and blinks during the warming up and after
a while turns to green when it is ready. When the unit has a low battery, the
LED turns red.
To turn off the power, follow the below:
✓ Press and hold both Calibration or Bump Test buttons simultaneously for 2
seconds.
Note: If the unit is inactive for 300 seconds, it will automatically off
(save power mode)
The button/unit only works when the power LED turns green
Bay LEDs and meanings
Bay LED|
Description
---|---
Stand by
Injecting fresh air
Testing
Purging remaining gas
Save a log data
Test Passed
Test Failed
Power LED| Green: Power On
Red: Low Battery
Each Bay has six blue LEDs (see Figure 1) which indicates the process status. Each of them will turn on by order from left to right while testing. After testing is finished, make sure all six bays are turned on otherwise, 3rd bay LED will be shown if the test is failed.
Charging battery
The unit`s Power LED turns red when the battery is very low as shown above. However, it comes with a DC adapter with 5plugs which can be used to charge the unit using a 110V power supply. A full charge will take approximately 3 hours and will last for approximately 1000 bump tests.
Note: Refer to Figure 1 for charging location.
Exhaust Port & Fresh Air Inlet
There are two small ports on the left side of the charging port (see Figure 1). The Fresh air inlet port will draw clean air in during an active test. The incoming air automatically counts as fresh air (O2, 20.9%vol). The Exhaust Port is the inverse of the Fresh air inlet port. During an active test, the used test gas will exit the unit through the exhaust port. Optionally, tubing can be attached to the exhaust port using the included twist connector to direct the used test gas to a suitable location.
Installation of Gas Cylinder
The gas Cylinder which fits Docking Station II must have the C10 fitting on it. The size of 58L and 116L are both suitable in-cylinder compartments. Before installing the cylinder for testing MGT, ensure that the Calibration concentration of gases is the same as MGT.
To install a cylinder, follow the below:
✓ Remove thumbscrews and lift the handle up.
✓ Install the cylinder to the gas regulator.
✓ Fasten the cylinder straps and close the cylinder compartment.
✓ Check the pressure gauge on the front panel.
✓ Re-install thumbscrews.
✓ After installing a gas cylinder, ensure the USB is attached.
Testing
Bump test and calibration are the key features to ensure the safety of devices and users. The MGT Docking Station version II provides bump testing, event management, and calibration from a simple-to-use multi-unit station.
Calibration
Calibration is the comparison of measurement values delivered by a device under test with those of a calibration standard of known accuracy. It is very important to calibrate a device periodically for better performance of the device and sensor accuracy, especially, when it is safety equipment.
To perform a calibration, follow the below:
✓ Insert the monitor(s) into the bay facing down.
✓ Slightly press down on the monitor until it locks into place.
✓ Press the calibration button for 2 seconds to execute the Calibration test.
✓ During the 90seconds, bay LEDs begin to light as the test progress.
✓ When the test is finished, all (six) blue Bay LEDs illumination indicates if
the MGT has passed the test (see Figure 3).
✓ Otherwise, the third blue Bay LED illumination indicates if the MGT has
failed the test (see Figure 3).
Note: Do not use the monitors that failed the calibration test.
To remove the MGT monitors from the bay, pull to the left side bay locking
mechanism (lower-left side of each bay).
Bump Test
A bump test is the process that checks and verifies the performance of the
monitors and ensures that sensors are correctly responding to the target gas.
To perform a Bump Test, follow the below:
✓ Insert the monitor(s) into the bay facing down.
✓ Slightly press down on the monitor until it locks into place.
✓ Press the Bump Test button for 2 seconds to execute the Bump test.
✓ During the 20~30seconds, bay LEDs begin to light as the test progress.
✓ When the test is finished, all (six) blue Bay LEDs illumination indicates if
the MGT has passed the test (see Figure 3).
✓ Otherwise, the third blue Bay LED illumination indicates if the MGT has
failed the test (see Figure 3).
Trouble Shooting
Bay Light does not turn on/test not performed
✓ Clean Monitor IR window.
✓ IR interference (bright lights/sunlight).
✓ Monitor in gas alarm state.
All tests fail
✓ Gas cylinder empty – check pressure gauge if it indicates at least
100psi/10bar.
✓ Gas Expired – check the gas expiration date located on the cylinder.
✓ Wrong gas concentration(s) – gas cylinder and MGT concentrations are not the
same.
✓ Wrong gas type – check gas type.
Test results are not stored
✓ USB not attached or full storage.
Uploaded Settings are not saved
✓ The “Write” button has not clicked.
✓ The connection has been lost.
MGT Docking Station II Manager Software
The purpose of MGT Docking Station II Manager Software is to customize and
configure the Stations settings and MGT devices
internal configurations. The
software can adjust and make changes to the Docking Station and the MGT units
using SENKO IR Link and/or partly USB Disk.
Software Installation
✓ After downloading the file, navigate to the saved location.
✓ Double click for running an installer.
✓ Click “Read More” and “Run Away” if you receive a warning message.
✓ The Docking Manager Setup window will open. Click “Next”.
✓ The “Select Installation Folder” comes up.
✓ To install to a different folder, click “Browse” or enter the link.
✓ To install in the default folder, click “Next”
✓ The Installation will be ready to begin.
✓ Click “Install”.
✓ Click “Yes” if you get a warning message.
✓ The Docking Station Setup Wizard is complete.
✓ Click the “Finish” button to exit the Setup Wizard.
Connecting to the MGT Docking Station II
When the Docking Manager software opened, the fields are grayed out and before
it can be used, the IR Link must be connected to the Docking Station II.
There are 2 ways of connection to the Docking Station II: IR Link and USB
Disk.
Note: The IR Link connection works only when it is placed into Bay 1.The
USB drive must be installed to store the test results.
Do not open the software if IR Link is not plugged into the PC.
Connecting with SENKO IR Link
SENKO IR Link is a device that conveniently configures and communicates with
MGT Docking Station II using the IR communication in Bay Unit 1.
To connect the IR Link, follow the below:
✓ Plug the IR link into a USB port on a PC.
✓ Power on (green LED) the Docking Station II.
✓ Place the IR Link facing up into the Bay Unit 1 (see Figure 4).
✓ Double click and open the installed software.
✓ Click the “OPEN” button at the top right corner of the software interface.
✓ The IR Link starts to flash rapidly.
✓ After a few seconds, the “Read complete” message will be displayed, and the
current settings of Docking Station II will be shown on the interface.
Note: If the “Send timeOut” message displays, the IR Link has failed to communicate with Docking Station II. In this case, make sure the IR Link screen is aimed at the IR screen of Bay Unit 1 and check Power of Docking Station II is on.
Connecting with USB
To connect the IR Link, follow the below:
✓ Open the Cylinder compartment.
✓ Find the USB port (see Figure 1) and remove the USB Disk.
✓ Plug the USB into to PC.
✓ Double click and open the installed software.
✓ Select the “USB Disk” in the upper middle-left corner.
✓ Select the location of the USB Disk and click the “OK” button.
Using Software
Overview of Software
When IR Link is connected to the Docking Station II, Figure 5 will be displayed. But if it is connected using a USB Disk, the “Logs” tab will not indicate.
7.1.1 Docking Station Tab
✓ Serial Number – Serial number of Docking Station II (cannot be changed).
✓ Version – The current firmware version.
✓ Auto Power-Off – The time when the unit automatically goes to Save Power
Mode. Min/max time can be set 1 ~ 3,600 seconds.
✓ Maximum Bump Time – The maximum and minimum time spent for the Bump Test
process. If the unit cannot respond correctly before time expires, the process
will stop and the result will be failure. Can be adjusted min/max of 20 ~ 120
seconds.
✓ Location – The location where the test has been done. It is beneficial
when downloading the data logs. Can add 12alphanumeric characters.
✓ Gas Expiration Date – Informs the date of expiration of gas in the
installed cylinder. Must be updated after installing a new one.
✓ Gas Bottle Lot # – Displays lot number of installed cylinders. Must be
updated after installing a new cylinder.
✓ Info Read/Write – By pressing the “Read” it displays the current setting
of the Docking Station II and will discard any unsaved changes in the Tab.
✓ Calibrate – If the box is not selected, the calibration process will not
proceed by pressing the Calibration button. However, it will still update the
firmware and configuration of MGT.
✓ Bump Test – If the box is not selected, the Bump test process will not
proceed by pressing the Bump Test button. However, it will still update the
firmware and configuration of MGT.
✓ Bump Result Decision – The dropdown list is selectable for “Beep”,
“Concentration”, or “Beep + Concentration”. The “Beep” option will run the
bump test until the alarm condition is met and the audible alarm is detected.
The “Concentration” option will run the bump test until the test gas
concentration is verified. If the units are in Stealth Mode, the Concentration
option will be required for a successful bump test. The “Beep + Concentration”
option will run the bump test until the audible alarm is detected and the test
gas concentration is verified.
✓ Browse & Write – To upgrade the latest firmware of Docking Station II,
click “Browse”, navigate to the firmware location and click “Open”. Click
“Write” to begin the upgrading process.
Note: Without clicking the “Write” button, configured and customized settings will not be applied and neither be saved.
7.1.2 MGT Tab
✓ Calibration Interval (Days) – The calibration reminder informs every
fixed day (can adjust 0 (n/a) ~ 365).
✓ Bump Interval (Days) – The Bump test reminder informs every fixed day
(can adjust 0 (n/a) ~ 365).
✓ Low Alarm & High Alarm – The 1st and 2nd alarm setpoints for each gas.
✓ STEL Alarm & TWA Alarm – Short Term Exposure Limit and Time Weighted
Average level of concentration of each gas.
✓ User ID – The User ID can be used to add a usage message.
✓ TWA Method – Calculates TWA by either OSHA or ACGIH.
✓ TWA Intr – Determines a period for calculating TWA (default 8 hours).
✓ STEL Intr – Determines a period for calculating STEL (default 15
minutes).
✓ 100% LEL – The reading percentage of CH4 (can adjust 1% ~ 50%).
✓ Safe Display – “SAFE ZONE” will be displayed on MGT unless gas value
exceeds 1st & 2nd alarm set points.
✓ Dock Lock – Calibration cannot be performed without using IR Link or
Docking Station II.
✓ Maintenance Notification – When Calibration and Bump Test due date
comes, LED will flash.
✓ Latching Alarms – If selected and alarm occurs, the alarm will not stop
until resetting the unit (push button). If not selected and an alarm occurs,
the alarm will stop once the present gas concentration goes below the alarm
set points.
✓ Auto Zero – The device automatically performs Zero calibration each time
whenever turning on the MGT. If this option is selected, MGT must turn on at
the Safe Zone where there is no gas.
✓ LEL by Volume CH4 – Adjust the maximum range of %LEL by %vol based on
100%LEL.
✓ OFF Lock – Off Lock does not allow a user to turn off the device and
keeps operating normally. By selecting the box and pushing the MGT button for
3 seconds, the “OFF LOCK” message will display for 1 second and turn to
“measuring mode”.
✓ Gas Concentration – This allows a user to enter/amend the correct
concentration of the installed gas cylinder on Docking Station II. It is
necessary to adjust for all tests.
✓ MGT Option Info Read/Write – By pressing the “Read” it displays the
current setting of the MGT and will discard any unsaved changes in the Tab. By
clicking the “Write”, all configured and customized settings will be saved.
✓ Browse & Write – To upgrade the latest firmware of MGT, click
“Browse”, navigate to the firmware location and click “Open”. Click “Write” to
begin the upgrading process.
7.1.3 Logs Tab
All logs will be stored on the USB Disk (logs are not available if USB is not
plugged) and can be downloaded via SENKO IR Link using Docking Manager
software. The log files will be created for each device by their Serial
numbers and will be in “.csv” format.
Note: A USB drive must be installed to store the test results (logs).
By connecting USB Disk, the “Logs” tab is not available on the software
interface.
But logs are still available to download from the “Events” file in the USB
Disk.
Click the “Refresh” button to view and download the latest logs.
After clicking the “Refresh” button, all logs will be available to view (see Figure 8).
To download the logs, follow the below:
✓ Plug the IR Link into a USB port on the PC and place it into Bay Unit 1.
✓ Double click and open the installed software.
✓ Click the “OPEN” button at the top right corner of the software interface.
✓ Click the “Logs” Tab and Click the “Refresh” button.
✓ Select the needed log by indicating MGT`s serial number.
✓ Click the “Local Save” button and a Browse window will open.
✓ Select a location to save a file.
✓ Click the “OK” button to begin the downloading process.
✓ When downloading is finished, the “Log data save success” message will come
up.
7.1.4 Certification Tab
A calibration certificate can be issued based on the latest calibration data.
The latest calibration data will be stored on the USB Disk and can be printed
using Docking Manager software. The certified name will be created for each
device by their Serial numbers and will be in “.csv” format.
Note: A USB drive must be installed to store the test results.
By connecting USB Disk, the “Certification” Tab is not available on the
software interface.
Click the “Refresh” button to view and print the calibration certificate.
(only can print latest calibration data)
After clicking the “Refresh” button, all data will be available to view (see
Figure 9).
To print the latest calibration certificate, follow the below:
✓ Plug the IR Link into a USB port on the PC and place it into Bay Unit 1.
✓ Double click and open the installed software.
✓ Click the “OPEN” button at the top right corner of the software interface.
✓ Click the “Certification” tab and Click the “Refresh” button.
✓ Select the needed device by indicating the device serial number in the Certi
File Name section.
✓ Click the “Load” button and information will be shown automatically on the
right side.
✓ Select address section between Senko, Senko Canada, Senko EU, No address.
✓ Write the authorized person’s name in the “Calibrated by” & “Approved by”
✓ Click the “Print” button to print the calibration certificate.
✓ When printing is finished, a “success” message will come up.
Limited Warranty
SENKO warrants this product to be free of defects in workmanship and materials
under normal use and service for two years from the date of purchase from the
manufacturer or from the product’s authorized reseller.
The manufacturer is not liable (under this warranty) if its testing and
examination disclose that the alleged defect in the product does not exist or
was caused by the purchaser’s (or any third party’s) misuse, neglect, or
improper installation, testing, or calibrations. Any unauthorized attempt to
repair or modify the product, or any other cause of damage beyond the range of
the intended use, including damage by fire, lightning, water damage, or other
hazard, voids the liability of the manufacturer.
In the event that a product should fail to perform up to manufacturer
specifications during the applicable warranty period, please contact the
product’s authorized reseller or SENKO service center at 82-31-492-0445 to
repair/return information.
SENKO Canada Ltd.
Address: Calgary, Alberta, Canada
Tel: 587-322-1616
Email: ben@senkocanada.com
Web: www.senkocanada.com
73, Oesammi-ro 15 beon-gil, Osan-si, Gyeonggi-do, 18111, South Korea
Tel : 82-31-492-0445
Fax : 82-31-492-0446
Email : sales@senko.co.kr
Web : www.senko.co.kr
References
-
[ Senko Canada Products - Senko Canada](http://www.senkocanada.com "Senko Canada Products
- Senko Canada")
-
[ Senko Canada Products - Senko Canada](http://www.senkocanada.com/ "Senko Canada Products
- Senko Canada")
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>