PELCO SRXV-PCF Pendant Ceiling Flange and Extension Instruction Manual

June 6, 2024
PELCO

PELCO SRXV-PCF Pendant Ceiling Flange and Extension

PELCO-SRXV-PCF-Pendan- Ceiling-Flange-and-
Extension

OVERVIEW

SRXV-PCF Dimensions

PELCO-SRXV-PCF-Pendan- Ceiling-Flange-and-Extension-
fig-1

SRXV-PP Dimensions

PELCO-SRXV-PCF-Pendan- Ceiling-Flange-and-Extension-
fig-2 Pendant Pipe Installation

Below is a sample procedure using a Pendant pipe:

  1. Determine a hard surface ceiling location, and use the four mounting holes on the pendant head to mark the positions where holes will be drilled to secure the pendant head.
    Note that screws are user-supplied and they should be 11mm long at least.

  2. Drill holes in the ceiling for securing the pendant head. Secure the pendant head by hammering anchors into the ceiling and then fastening screws through it.

  3. Route power lines and other cables through the side bushing and/or conduits (user-supplied), and through the pendant pipe.

  4. Secure the pendant pipe to the pendant head by rotating it clockwise until it is tightly fastened.PELCO-SRXV-PCF-Pendan- Ceiling-Flange-and-Extension-fig-4

  5. Secure the connection using the included hex wrench.

  6. Attach the mounting adapter to the pendant pipe by rotating it clockwise until it is tightly fastened.

  7. Secure the connection using the included hex wrench.

  8. Refer to the camera and other accessory manuals to complete the installation and set-up.

Pelco, Inc.
625 W. Alluvial, Fresno, California 93711
United States USA & Canada
Tel (800)289-9100 Fax 800-289-9150
International Tel +1 559-292-1981
Fax +1 559-348-1120
www.pelco.com

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals