Symbol Definition
Safety Warning – Ignoring the warning signs in this manual may cause minor or moderate injuries.
The danger of high voltage, avoid electric shock
The product must not be disposed of as ordinary waste, but must be recycled by special methods
CE mark
Avoid humidity
Recyclable
This side shall be upside, do not tilt
Stacking limit, up to 4 layers can be stacked
Fragile items, handle with care
Installation Instructions and Warnings
The SCB3000 is designed and tested in strict accordance with relevant safety regulations. However, as electrical and electronic equipment, the following safety instructions must be observed during installation and maintenance, and improper operation will cause serious injury and property damage to the operator and a third party.
- The SCB3000 must be installed and maintained by professionals in accordance with local standards and regulations.
- When installing and maintaining the SCB3000, power must be disconnected from the SCB3000 to prevent electric shock.
- During operation, do not touch any live parts of the SCB3000, such as its internal components and cables, to avoid electric shock.
- Before replacing any components within the SCB3000, power must be disconnected from the SCB3000 and the newly replaced components must be ensured to meet the requirements for use of the SCB3000, and GOODWE will not be liable for any personal harm or warranty claims arising from non-compliance with this instruction.
- When the SCB3000 is in operation, do not plug in or remove any cable.
- The SCB3000 has an internal lightning protection module installed, inside which the PE is connected to the ground when installing SCB3000.
- Ensure that the AC input voltage and current are matched with the voltage and current ratings of SCB3000, otherwise, the components could be damaged or not functioning properly, and GOODWE will not be liable for any responsibilities or warranty claims arising from this mismatch.
Product Introduction
3.1 Product Overview
The SCB3000 is used in photovoltaic power generation systems to integrate data
collectors, allowing for port aggregation, data acquisition, and storage, as
well as centralized monitoring and maintenance of inverters, environment
monitors, and instrumentations in photovoltaic power generation systems.
SCB3000 model description: SCB3000 includes the SCB3000P00 and SCB3000P01. The
SCB3000 is the name of the series of photovoltaic communication boxes; P means
that the local communication mode is PLC2.0; 00 means that the cloud
communication method supports LAN; 01 means that the cloud communication
method supports LAN and optical fibre. In this manual, the SCB3000P00 and
SCB3000P01 models are both referred to as the SCB3000.
Flexible networking:
Communication with inverters is supported via PLC or RS485.
Communication with the services is available via Ethernet, fiber optics,
etc.
Note: When the SCB3000 uses PLC communication, it can only communicate with
inverters supporting PLC2.0. Currently, inverters equipped with PLC2.0
functions include the HT and SMT series. For details, please contact the
Goodwe after-sales service center.
3.2 Appearance Introduction
After opening the package, check the product to confirm whether it is
consistent with the specifications of the SCB3000 you purchased. The appearance
of the SCB3000 is shown in Figures 3.2-1.
No. | Label | Description |
---|---|---|
1 | L1/L2/L3/PE | Three-phase AC and protective ground wiring port (with a |
waterproof cap)
2| LAN/ANTENNA| Ethernet/Antenna port (with a waterproof cap)
3| COM1| RS485-1 port (with a waterproof cap)
4| COM2| RS485-2 port (with a waterproof cap)
5| COM3| RS485-3 port (with a waterproof cap)
6| COM4| RS485-4 port (with a waterproof cap)
7| FXL1/FXL2| Fiber Optic Wiring port (with a waterproof cap)
8| L/N| AC Power Supply port (with a waterproof cap)
3.3 Packaging information
Equipment Installation
4.1 Installation Instructions
- The SCB3000 is installed in places where there is no significant shaking, shock or vibration, and not subject to rain or snow.
- The installation height shall be parallel to the line of sight for easy operation and maintenance.
- The installation location of the SCB3000 should be free of explosive media containing gases and dust sufficient to corrode metals and damage insulation.
- The parameter labels and warning signs must be clearly visible after the SCB3000 is installed.
- The installation location of the SCB3000 shall avoid sunlight, rain, and snow.
4.2 Installation Location
The following factors must be considered when choosing the installation
location:
- The installation method and location must be suitable for the weight and size of the SCB3000.
- Install on a solid surface.
- The installation location must be sufficiently ventilated.
- The SCB3000 can be horizontally placed or vertically installed.
- The vertical installation or tilt-back can not exceed 15 degrees, and must not be tilted sideways, and the wiring area should be facing down, as shown in Figure 4.2-1.
- To ensure good heat dissipation and easy disassembly, the minimum clearance around the SCB3000 must not be less than the following values, as shown in Figure 4.2-2.
4.3 Installation Method
Vertical Installation:
-
Drill holes in the wall with a diameter of 8mm and a depth of 45mm. The spacing of the holes is shown in Figure 4.3-1.
-
Use the expansion screws in the accessory pack to fix the back plate on the wall, as shown in Figure 4.3-2.
-
Install the enclosure as shown in Figures 4.3-3.
Horizontal Placement:
- The SCB3000 can be placed horizontally, as shown in Figures 4.3-4.
- The SCB3000 needs to be placed indoors at a location where it can be fixed, as shown in Figures 4.3-5.
4.4 Port Description
The internal ports of SCB3000 are described as follows:
No. | Port | Port Description |
---|---|---|
1 | POWER | DC Power Input (occupied) |
2 | NET | Ethernet (occupied for fiber optic version) |
3 | DI | DRED (for Australia) or RCR (for Germany) function |
4 | NC | Reserved |
5 | COM1 | RS485 port for communications with the inverter |
6 | COM2 | RS485 port for communications with the inverter |
7 | COM3 | RS485 port for communications with the inverter |
8 | COM4 | For connections to third-party equipment such as environment monitors |
9 | TP1, TP2 | Ethernet (for fiber optic version only) |
10 | TP3 | Ethernet (occupied, for fiber optic version only) |
11 | FXL1, FXL2 | Fiber Optical Port (for fiber optic version only) |
Note: Item numbers 9, 10, and 11 in the above list are fiber optic module ports, and will only be used when the fiber optic version is selected. These 3 ports will not exist if there is no fiber optic version. Ports 5, 6, and 7 are RS485 ports, and will not be used when the SCB3000 is communicating with inverters through the PLC.
4.5 Wiring Instructions
4.5.1 Description of SCB3000 Power Supply Cable
The single-phase power supply cable is connected to the internal single-phase
switches L and N of the SCB3000.
Input phase voltage range: AC100V~AC240V; AC frequency: 50Hz/60Hz Input wire
and crimping:
Code | Description | Value |
---|---|---|
A | Wire outer diameter | No greater than 25mm |
B | The cross-sectional area of copper conductors | Recommend for use: 2.5~4mm² |
C | Wire length | Approximately 45mm |
D | Copper bare wire length | Approximately 12mm |
Note: Before connecting the AC power line, make sure that the switch upstream of SCB3000 is open
4.5.2 PLC Wiring Instructions
(a) Protective Earth Wiring:
The protective ground wire is connected to the PE of the base plate of inside
the SCB3000 enclosure.
(b) Remove the three-phase AC power line cover panel.
(c) Connect the three-phase AC power line
Note: Before connecting the AC power line, make sure that the switch
upstream of SCB3000 is open. Three-phase input line voltage range:
AC342V~AC800V; AC frequency: 50Hz/60Hz. The three-phase AC power line is
connected to the transformer bus, and then to the circuit breakers L1, L2 and
L3 in the SCB3000 via port (1).
(d) Install the three-phase AC power line cover panel.
AC Input wire specifications and crimping:
Code | Description | Value |
---|---|---|
A | Wire outer diameter | No greater than 25mm |
B | Cross-sect. area of copper conductors | Recommend for use: 2.5~4mm² |
C | Wire length | Approximately 130mm (approximately 50mm for PE wire) |
D | Copper bare wire length | 6~8Mm (5~6mm for PE wire) |
4.5.3 Description of RS485 communication wiring
COM1, COM2, and COM3 are RS485 ports for communications with the inverter that
can be left unused if communications with inverter PLC can meet the
requirements, users can choose to connect COM1, COM2, or COM3 for
communications with the inverter as needed. If using the SCB3000 to connect
with an environment monitor, the connection can be made to the COM4 port via
the RS485 cable.
Note:
- COM1, COM2, and COM3 are used only for communications with the inverter, while COM4 is only connected to third-party equipment such as environment monitors, and must not be connected incorrectly.
- For RS485 communication wiring, please use standard RS485 communication twisted pair.
- The maximum number of inverters connected to each of COM1, COM2, and COM3 is 20 units, with a total of 60 units allowed for the 3 ports.
- In the ports COM1, COM2, COM3, and COM4, A correspond to the differential signal +, and B corresponds to the differential signal.
Wire specifications and installation: for RS485 communication cables, shielded twisted pair cables with a conductor cross-sectional area of 1mm² are recommended for use.
4.5.4 Description of LAN communication wiring
The SCB3000 can be connected to routers, computers, switches, and other
equipment through the network cable; The network cable is connected to the
internal NET port of the SCB3000; if you select the fiber optic version of this
device, the network cable can be connected to the TP1 or TP2 port (the NET
port has been connected to the TP3 port for the fiber optic version of this
device). Cat 5e is recommended for use as the network cable. After wiring,
please use the fire clay included to block it to ensure its fireproof
performance.
4.5.5 Description of fiber optic communication wiring
The SCB3000 fiber optic version can be connected to fiber optic terminals
through optical cables for data transmission.
The optical cables are connected to the FXL1 and FXL2 ports inside the
SCB3000.
Note: Both ends of the same fiber optic must be connected to the TX and RX
ports, otherwise the fiber optic connection will not be made correctly.
4.5.6 Wiring instructions for other ports
The DI port of SCB3000 is compatible with both RCR (for Germany) and DRED (for
Australia) functions. The port definitions in different functions are as
follows:
| REF1| 1| 2| 3| 4| REF2
---|---|---|---|---|---|---
RCR| +5V| D_IN1| D_IN2| D_IN3| D_IN4| +5V
DRED| region| DRM1/5| DRM2/6| DRM3/7| DRM4/8| Com/DRM0
If the user does not need to use this function, the port does not need to be wired.
4.6 Networking Diagrams
One of the SCB3000s needs to be set as the master (root node), with the others as the slaves (slave nodes).
System Operations
5.1 Indicator Description
Port | Status | Status Description |
---|---|---|
POWER | Blue Light On | The power supply is OK |
Blue Light Off | The power supply is Off | |
RUN | Blue Light flashing (on for 1 second, off for I second) | The SCB3000 is |
not operating properly
Blue Light On or Off continuously| The SCB3000 is operating properly
SERVER| Blue Light On continuously| The SCB3000 is connected to the external
network server correctly.
Blue Light flashing (on for 1 second, off for 1 second| The SCB3000 is
connected to the router correctly, but not connected to the external network
server.
Blue Light Off| No network connection for SCB3000
PC| Blue Light On| The SCB3000 is connected to a computer and ProMate software
Blue Light Off| The SCB3000 is not connected to a computer and ProMate
software
COM 1| Blue Light On| The actual number of inverters acquired by SC83000 is
equal to the number of acquired inverters set for the port
Blue Light flashing (on braised,off brl second)| The actual number of
inverters acquired by SCB3000 is less than the number of acquired inverters
set for the port
Bilk Lightflashing ton br I second,off br3seconis)| The number of inverters
acquired by SCB3000 is not set for the port
Blue Light Off| The SCB3000 has not acquired any data from the inverter
COM 2| Blue Light On| The actual number of inverters acquired by SCB3000 is
equal to the number of acquired inverters set for the port
Blue Light flashing ton for a second,off for a second)| The actual number of
inverters acquired by SCB3000 is less than the number of acquired inverters
set for the port
Blue Lightflashing ion brl second,ohr3seconis)| The number of inverters
acquired by SCB3000 is not set for the port
Blue Light Off| The SCB3000 has acquired data from the inverter
COM3| Blue Light On| The actual number of inverters acquired by SCB3000 is
equal to the number of acquired inverters set for the port
Blue Light flashing (on second, off brl second)| The actual number of
inverters acquired by SCB3000 is less than the number of acquired inverters
set for the port
Blue Lightflashing ion brl second,ohr3 seconds)| The number of inverters
acquired by SCB3000 is not set for the port
Blue Light Off| The SCB3000 has not acquired any data from the inverter
COM4| Blue Light On| Other equipment (such as external environment monitors)
communication is good.
Blue Light Off| No other equipment, such as external environment monitors
5.2 Master Computer Operations & Parameter Configurations
Promate is a software released by us for the configuration of the SCB3000
functions, it enables the modification of the network IP address of the
SCB3000, the configuration of
the number of port-connected inverters, time settings, RCR and DRED features
configuration, field debugging, and more.
5.2.1 Connecting to the Master Computer Software
If the user wants to configure the SCB3000 using ProMate software, the master
computer needs to be connected in either dynamic IP (DHCP) or static IP
according to the way the network is connected.
-
SCB3000 dynamic IP address connection: SCB3000 is set to dynamic IP mode by default, and the network connection is simply made by connecting the SCB3000 NET port to the router LAN port with the network cable, which is plug and play. To configure, the SCB3000, connect your computer to the router with a network cable and launch the ProMate software in which you can click “Scan” to complete the connection successfully. When the configuration is complete, disconnect the computer from the router.
Note: If the SCB3000 is set to static IP mode, you need to switch to dynamic IP mode before you can configure it using a dynamic IP connection. Press and hold the “RELOAD” button for about 4 seconds, this will make the LED signal indicators flash from right to left, indicating a completed reset and restart, after which the SCB3000 will be switched to static IP mode. -
SCB3000 static IP address connection:
Note: SCB3000 is set to dynamic IP mode by default, you need to switch the SCB3000 to static IP mode first by pressing and holding the “RELOAD” button for about 10 seconds, this will make the LED signal indicators of the SCB3000 flash from right to left, indicating a completed reset and restart, after which the SCB3000 will be switched to static IP mode (the default IP address is 192.168.1.200). The user needs to set the computer to static IP mode and configure the computer’s IP address and the SCB3000’s IP address in the same network segment. The steps are as follows (using Windows 7 OS as an example). Users can find the methods on the Internet that can be used to modify the IP addresses of computers running different operating systems.
(a) Use a network cable to connect the “NET” of the SCB3000 to the Computer’s Ethernet port.
(b) Right-click “Network” and select “Properties”.
(c) Click “Change adapter settings”. (d) In the local connection popup dialog box, right-click “Local connection” and click “Properties”.
The following popup dialog box is displayed:
(e) Double-click “Internet Protocol Version 4 (TCP/IPv4)” to show the
“Internet Protocol Version 4 (TCP/IPv4)” popup dialog box, and set up the
dialog box according to the requirements below. The default IP address of the
SCB3000 is 192.168.1.200. To keep the computer and SCB3000 in the same network
segment, the “IP address” and “Default Gateway” should be set at 192.168.1.XXX
segment (1≤XXX≤250且XXX≠200).
For example, The IP address can be set to 192.168.1.100 and the default
gateway 192.168.1.254.
Click the “Connect” button in ProMate, when it shows that the connection is successful, ProMate is connected to the SCB3000 successfully.
Note: If there is only one Box-type substation on the customer site, and the data is uploaded to GOODWE servers, there is no need to configure the box number and address through ProMate, simply connect ProMate, click to get the inverter list to see if the inverter is all online. If there are multiple box Box-type substations onsite, refer to 5.2.2 for setup.
5.2.2 Parameter Configurations (for PLC communication with the inverter)
When the connection to ProMate is successful, parameter configurations can be
made on the SCB3000 and the inverter to which it is connected.
(a) Choose Protocol Click the “Ezlogger Pro” button and select the protocol in
the following popup. Custom is used for parameter configuration and Modbus
protocol for normal communication.
The machine is set to “Custom” in the factory by default, and the following
protocol shown in grey is the one that is currently used. After switching
protocols, ProMate waits
about 1 minute to proceed.
Note: Select the GOODWE custom protocol first to configure the BOX No and inverter address, then switch to the Modbus protocol for communications after all parameters have been configured.
(b) Settings of Device Count and Box No Enter numbers for both “Device Count”
and “Box No”.
For “Device Count”, enter the number of inverters actually connected to the
current SCB3000. The “Box No” is used to identify the Box-type substations
onsite. (For example, if there are multiple SCB3000s in use onsite, they must
correspond to different box numbers) As shown below: the number of inverters
connected to the SCB3000 on-site is 3, so the “Device Count” of 3 is
entered.
Note: The Device Count and Box No are required, the devices will not
function properly if either field is not filled in.
As shown below: When you finished setting the Device Count and the Box No, you
can click the “Read” button to see if the settings are successful.
(c) Inverter Address Configuration
Connecting the SCB3000 to the inverter requires the Modbus address to be
configured, with the option of one click and manual operation available for the
inverter address configuration.
As shown below: Click the “One key config” button, and the software randomly
assigns the inverter address.
As shown below: Click the “Set” button to see if the configuration is successful.
(d) Manually configure the inverter address
As shown below: If there are special requirements for the inverter address on
the customer site, you can choose to manually add the Modbus address by
clicking “Add”, entering the inverter serial number, box number, and the
corresponding Modbus address in the following popup box, selecting “OK”, and
then clicking “Manual config” to add the address.
As shown below: If you need to modify the Modbus address after adding it, you can select the inverter serial number that needs to be modified, click the “Update” button, enter the parameters to be modified in the popup dialog box, click “OK” and then click “Manual config”.
Note: After selecting “Add”, “Update” or “Delete” in the manual
configuration section, you must click the “Manual config” button to make it
become effective.
As shown below: Click the “Update” button, enter the parameters to be modified
in the popup dialog box, click “OK” and then click “Manual config”.
(e) Protocol Switching
As shown below: In the inverter list section at the right side, click
“Refresh” to show the SCB3000 connected inverters’ status, confirm that all
inverters are online. After the Modbus address has been configured, you can
return to the “EzLogger Pro” interface where the Modbus protocol is selected
in the protocol selection.
Note:
- Please confirm that the inverter Box No and SCB3000 Box No is set to the same value. If this is not the case, after switching to the Modbus protocol, the SCB3000 will not be able to communicate with the inverter.
- It takes about 1 minute to complete the protocol switching. After the switching is successful, wait for all the inverters to go online and the SCB3000 communicates properly with the inverters.
5.2.3 RS485 Port Configuration
If it is required to apply the three RS485 ports COM1, COM2, and COM3 to
connect the inverters on the customer site, you can use the port configuration
to pre-set the number of inverters. For example, if you set the number of
inverters connected to the COM1 and COM2 ports to 10 and 13 respectively, then
check COM1 and COM2, enter the numbers 10 and 13, and click “Set” to complete
the setting.
5.3 Configuration Instructions for Fiber Optic Switches
Refer to these instructions if you choose the fiber optic version. Partial
parameters of fiber optic switches: fiber optic switches use single-mode single
fiber with the optical port of SC, the center wavelength of 1310/1550nm, and
transmission distance of 20KM.
5.3.1 Instruction for Use of Fiber Optic Switches
Connect the fiber jumper or tail fiber from the terminal boxes at both ends of
the fiber to the optical port of the Gigabit fiber optic switch, or the Gigabit
fiber optic port with one end being connected to the transmitter or router.
Please note that both ends of the same fiber optic must be connected to the TX
and RX ports, otherwise the fiber optic connection will not be made correctly.
Note: When using the fiber optic ring networking, there must be only one
root node in one ring, with the others being slave node devices.
5.3.2 Indicator Description for Fiber Optic Switches
PWR | Power Indicator | When it’s on, it indicates that the power supply is OK. |
---|---|---|
RUN | System Operation Indicator | Flashing slowly: System operating properly; |
Flashing rapidly: Ring network functions enabled
FXL1| FXL1 Optical port indicator| On: Optical port connection good; Flashing:
Data transmission in progress at the port
FXL2| FXL2 Optical port indicator| On: Optical port connection good; Flashing:
Data transmission in progress at the port
1000M| Network Port Indicator| On: indicates a rate of 1000M
ACT| Network Port Indicator| Light On and Flashing: Data transmission in
progress
5.3.3 Resetting and Restoring Factory Settings
Press and hold the RESET key, turning the RUN indicator on continuously and
then flashingrapidly, after which it turns back on continuously, now release
the RESET key, and wait until the RUN indicator is flashing slowly, which means
the factory defaults have been restored.
Program Upgrade
6.1 Local Upgrade
Copy the bin file required for the upgrade to the root directory of a USB flash
drive (please use a USB 2.0 device with the format of FAT32), insert it into
the USB port of the SCB3000, power off the SCB3000, and power it on again, and
the program will be automatically upgraded.
Note: The name of the bin file required for program upgrade is “SCB3000_new.bin”. The bin file will be sent to customers by email. After the reception of the bin file, customers put it in the root directory of the USB flash drive and check whether the file name is “SCB3000_new.bin”. During the upgrade process, all 8 indicators of SCB3000 are on, indicating that the program is being upgraded. When the indicators return to normal operation mode, the program is upgraded successfully. Do not power off during the program upgrade.
6.2 Remote Upgrade
The upgrade program is uploaded to the server by GOODWE in the background, and
the SCB3000 will detect the upgrade by itself.
Maintenance and troubleshooting
Note: When maintaining, power off the system. Make sure power is
completely disconnected before performing maintenance.
7.1 Maintenance
Scope of maintenance:
Make sure there are no strong electromagnetic interference devices located
close to the SCB3000. Make sure there is no heat source located close to the
SCB3000. Check the SCB3000 regularly for signs of loose cable connections;
make sure all cables are connected securely.
7.2 Troubleshooting
Typical faults:
No. | System error | Possible Ca uses | Recommendations |
---|---|---|---|
The system is not powered on | There is no power supply to the socket | Check |
that the LW power input is correct
AC Input on the adapter is not inserted correctly| Check the adapter to make
sure the AC Input is fully inserted into the socket
DC Input on the adapter is not inserted correctly| Check the adapter to make
sure the DC output is inserted into the Power port
The power adapter is faulty| Replace the power adapter
The SCB3000 system failure| Contact the supplier or GOODWE Services
2| Cannot acquire any inverter
the device in ProMate software| The three-phase AC power line is not
connected| Check the three-phase AC power line is connected correctly and
securely If not. reconnect it.
The device Modbus address is not set| Depending on the actually connected
inverter to set Modbus address
The three-phase switch is not closed| Check the internal three-phase switch of
the SCB3000 is connected correctly and securely.
If the PLC communication board is faulty| contact the supplier or GOODWE
Note: since the SCB3000 is maintained for its entirety, replace the whole
machine if there is an internal failure.
When replacing the SCB3000, power off the system.
Technical Data
Model | SCB3000P00 | SCB3000P01 |
---|---|---|
Application scenarios | C & I and Utility-scale solar power plants | |
Power supply Input Voltage Range (V) | Voltage Range | Phase voltage: AC 100V- |
240V
Frequency| 50Hz/60Hz
AC Port Input line voltage (PLC Communications)| Max. AC800V
Rated Power Consumption| (18W
Communication
Interface| With the inverter| PLC2.0/RS485
With the server| LAN| Optical Fiber
Max Quantity of Inverter Connected| PLC: 60 units RS485: 60 units
Max Length to Cloud/Server| RS485/PLC:
1000m
LAN: 100m| RS485/PLC: 1000m Optical Fiber: 20KM
Other Interface| USB, SD
Fiber Parameters| Center Wavelength| –| 1310/1550nm
Transmission distance| –| 20KM
Interface| | SC
Optical Ports| –| A port: 1550nm(Transmit) 1310nm( Receive)
–| B port: 1310nm(Transmit) 1550nm(Receive)
Mechanical
parameters| Size(LWH)| 351 x460 x 142.2mm
Weight| 10.5kg
Protection Degree| IP65
Installation| Wall mounting, Bracket mounting, Pole
mounting and Horizontal mounting
Operating temperature| – 30 – +60°C
Storage temperature| – 30 – +70°C
Humidity| 0-100%, Non-condensing
Altitude| <4000m
Certifications
| |
---|---|---
https://en.goodwe.com/| 340-00712-00| https://en.goodwe.com/contact-
us.asp
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>