vita VA94430 Portsmouth or Charleston Lamp Post Instruction Manual

June 4, 2024
Vita

Instruction Manual

ASSEMBLY INSTRUCTIONS

The Portsmouth/Charleston Lamp Post

Please read through before starting assembly.

Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to 5:00 PM EST).

  1. Lamp Post Top – A – (1) 5” x 5“x 14” (12.7 x 12.7 x 35.5 cm) – 10889 White, 14054 Brown

  2. Post Coupler (1) – 10906 White, 14052 Brown

  3. Lamp Post Bottom – B – (1) – 5” x 5“x 58” (12.7 x 12.7 x 147.3 cm) – 10890 White , 14053 Brown

  4. Post Cap (1) – 10789 White, 14051 Brown

  5. Post-Trim (1) – 10698-1 White, 14029 Brown

  6. Decorative Base Molding Trim Cap (1) – 10764 White, 14055 Brown

  7. Decorative Base Molding – C – (1) – 10173-1 White, 14056 Brown

  8. Decorative Base Molding Insert (1) -10765 White, 14057 Brown

  9. 1-1/2” Self-Tapping Screws (4) – 20005 White, 20031 Brown

  10. Vinyl Weld Glue (1)- 20000 White, 20038 Brown
    Tools You Will Need

  11. Wheelbarrow or bucket (to mix concrete)

  12. Tape Measure

  13. Level

  14. Shovel

  15. Drill

Purchased Separately

  • Lamp.
  • 4×4 Pressure treated lumber. – 8’ (2.4 m) long
  • Two bags of pre-mix concrete. *
  • Strongly recommended for the stability of this product.

General Information

  • Read Instructions carefully before beginning assembly.
  • When handling components, place them on a non-abrasive surface (i.e. shipping box) to avoid scratching.
  • We recommend an area approx 10’x 8’ (3m x 2.4m) for unobstructed handling.

Important Note:

  • Please refer to local codes before installing outdoor lighting. UF-rated cable should be used for underground wiring and all materials should be approved by the Underwriter’s Laboratory (UL). Vita assumes no liability for errors, omissions, or the outcome of any project.

STEP ONE
Base Molding Assembly
Apply a generous amount of vinyl glue to the underside of the decorative base trim cap and the top side of the decorative base bottom insert. Attach to the decorative base as shown in diagram 1

STEP TWO
Lamp Post Assembly

A Apply a generous amount of vinyl glue to the ribbed surface of the post coupler as shown and join the two posts as illustrated.
B Slide the completed base molding from the bottom of the lamp post into place (Refer to image B).
C Slide the post trim UP and out of the way, then apply a generous amount of vinyl glue at the top of where the trim would sit.
D Slide the post trim back down to its desired height and allow some time for the vinyl glue to set for 10 minutes and cure for 24 hours.
E Apply a generous amount of vinyl glue to the inside base of the post cap and place it over the top end of the lamp post as illustrated.

STEP THREE
Wood Post Installation
Dig 36 in. (91.5 cm)deep hole in the desired location. Verify the depth of the hole to ensure that the 4×4 wood post will be buried 36 in. (91.5 cm)into the ground. Fill the hole 3/4 full with pre-mix concrete (not included). Insert the post into the concrete and check for level. Allow time for the concrete to set, then fill in the remainder of the hole.

Lamp Post Installation

STEP FOUR
Lamp Post Installation
A If necessary, pre-wire the lamp by running the wire inside the cavity of the post through the universal 3 in. (7.62 cm)collar. If installing a solar lamp, disregard this step.
B Slide the lamp post assembly over the wood post.
C Line up the one corner of the vinyl post up against the wood post and fasten the two touching sides with the provided screws.

STEP FIVE
Installing Lamp
Follow the instructions included with the lamp (purchased separately) and secure it to the round collar on top of the post. You may need to modify how it attaches to the collar.

www.wearevita.com
North America Toll-Free Phone: 1 800 282 9346

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals