xylem D17 Drinking Water Panel Instruction Manual

June 1, 2024
xylem

xylem D17 Drinking Water Panel

xylem -D17-DrinkingWater-Panel-product

Specifications

  • Model: D17, D19
  • Product Name: Flow-Through Armature
  • Manufacturer: ba77285de01
  • Release Date : 01/2024

Product Usage Instructions

Installing the Flow Through Armature:

  1. Select the position for the new flow through the armature.
  2. Insert a screw with a washer in each of the two holes and mount the flow armature on the rail.
  3. Connect the tube to the click screw connection on the sample outlet and the sample feed.

Connecting the Tube to Click Screw Connection:

  1. Pull out the sleeve of the click screw connection until it audibly disengages with a click.
  2. Insert the tube 26 mm deep into the sleeve of the click connection.
  3. Press the sleeve of the click screw connection against the flowthrough armature until it audibly engages.

Installing the Chlorine Sensor into D 19 Flow Through Armature:

  1. Connect the chlorine sensor to the ADA Cl/IDS adapter.
  2. If the liquid circle was already in operation, stop the sample and drain the flow through the armature.
  3. Screw on the screw gland with the installation wrench and insert the sensor with the screw gland in the flow-through armature.
  4. Align the marking on the sensor with the top edge of the screwg land and tighten it by hand and then further with the installation wrench.

Installing the flow through the armature

  1. Select the position for the new flow-through armature Flow through armature (example D 19)
    • Flow through armature
    • Screwed cable gland
    • Sample feed tube
    • Sample outlet tube
    • Holes for mounting the flow through armature 6 Screw for draining the flow through armature.
  2. Insert a screw with a washer in each of the two holes (5) and mount the flow armature on the rail.
  3. Connect the tube to the click screw connection on the sample outlet and the sample feed (see section CONNECT THE TUBE TO THE CLICK SCREW CONNECTION OF THE FLOW THROUGH ARMATURE).
  4. Install the sensors in the flow through armatures.
  5. Chlorine sensor in flow through armature D 19: see the section INSTALLING THE CHLORINE SENSOR INTO THE D 19 FLOW THROUGH ARMATURE
  6. Other sensors in flow through armature D 17: see the section INSTALLING THE SENSOR IN THE D 17 FLOW THROUGH ARMATURE
    Connect the tube to the click screw connection of the flow through the armature
  * Sleeve of the click screw connection (blue) Pull out the sleeve of the click screw connection (1) until it audibly disengages with a click.
  * Sleeve of the click screw connection (blue)
  1. Insert the tube 26 mm deep into the sleeve (1) of the click screw connection.
    If the tube is not inserted deep enough, the connection will not be tight.

  2. Sleeve of the click screw connection (blue)

  3. Tube

  4. Press the sleeve of the click screw connection (1) against the flow-through armature until it audibly engages. The tubes are connected tightly.

  5. Sleeve of the click screw connection (blue)

Installing the sensor

  • Before installing a sensor in a flow-through armature:
  • Connect the chlorine sensor to the ADA Cl/IDS adapter (see operating manual of the chlorine sensor).

Installing the chlorine sensor into the D 19 flow through the armature

Flow through armature D 19 for the chlorine sensor

  1. Flow through armature
  2. Screw gland for fixing the sensor in the flow through the armature
  3. Sample feed tube
  4. Sample outlet tube
  5. Screw for draining the flow through the armature

Installation of the chlorine sensor

  1. If the liquid circle was already in operation: Stop the sample feed.

  2. Drain the flow through the armature.

    • info: The assembly wrench for the screw glands of the flow-through armatures is available as an accessory.
  3. Screw on the screw gland with the installation wrench.

  4. Loosely push the screw gland of the flow through the armature onto the sensor.

  5. Insert the sensor with the screw gland in the flow-through armature.xylem-D17-Drinking-Water-Panel-fig-7
    Flow through armature D 19

  6. Marking on the chlorine sensor

  7. Top edge screw gland

  8. Outlet

  9. Inlet

  10. Align the marking (1) on the sensor with the top edge (2) of the screw gland.

  11. Tighten the screw gland by hand.

  12. Tighten the screw gland approx. a quarter turn further with the installation wrench.

NOTE

  • Make sure that the sensor is firmly in place.
  • A sensor that is fastened too loosely can be pressed out of the flow through the armature when pressure is applied.
  • Always open the inlet slowly for commissioning. A strong pressure surge can destroy the membrane.

Installing the sensor in the D 17 flow through the armature

  • Before installing a sensor in a flow-through armature:
    • Connect sensors with plug-in head with the AS/IDS-x cable (see operating manual of the sensor).

Flow through armature for sensors with 17 mm diameter (IDS sensors)

  1. Flow through armature
  2. Screw gland for fixing the sensor in the flow through the armature
  3. Sample feed tube
  4. Sample outlet tube
  5. Screw for draining the flow through the armature
  • If the liquid circle was already in operation: Stop the sample feed.

  • Drain all flow through armatures.

    • info: The assembly wrench for the screw glands of the flow-through armatures is available as an accessory.
  • Screw on the screw gland with the installation wrench.

  • For FDO 925 oxygen sensor:
    Slide the spacer (30 mm) over the shaft.

  • Push the screw gland of the flow through armature onto the sensor and tighten slightly.

  • Push the screw gland further over the sensor until the shaft of the sensor is in contact with the screw gland.

    • info: When the shaft of the sensor is in contact with the screw gland, the sensor is optimally exposed to the sample.
  • Carefully insert the sensor with the screw gland in the flow-through armature.

  • For FDO 925 oxygen sensor:
    Rotate the sensor so that the slanted surface of the sensor tip faces the sample inlet.

  • Use your hand to tighten the screw gland on the flow armature.

  • Tighten the screw gland approx. a quarter turn further with the installation wrench.

NOTE

  • Make sure that the sensor is firmly in place.
  • A sensor that is fastened too loosely can be pressed out of the flow through the armature when pressure is applied.
  • Always open the inlet slowly for commissioning. A strong pressure surge can destroy the membrane.

Accessories

  • Accessories such as tubes, assembly wrenches, or other components (see operating manual DW/P)

Technical data

xylem-D17-Drinking-Water-Panel-fig-9 xylem-D17
-Drinking-Water-Panel-fig-10 xylem-D17
-Drinking-Water-Panel-fig-11

Information

Xylem

  1. The tissue in plants that brings water upward from the roots;
  2. a leading global water technology company.

We’re a global team unified by a common purpose: creating advanced technology solutions to the world’s water challenges. Developing new technologies that will improve the way water is used, conserved, and re-used in the future is central to our work. Our products and services move, treat, analyze, monitor, and return water to the environment, in public utility, industrial, residential, and commercial building services settings. Xylem also provides a leading portfolio of smart metering, network technologies, and advanced analytics solutions for water, electric, and gas utilities. In more than 150 countries, we have strong, long-standing relationships with customers who know us for our powerful combination of leading product brands and applications expertise with a strong focus on developing comprehensive, sustainable solutions.

For more information on how Xylem can help you go to www.xylem.com.

FAQ

  • Q: What should I do if the connection is not tight when inserting the tube into the click screw connection?
    • A: Ensure that the tube is inserted at least 26 mm deep into the sleeve of the click screw connection to achieve a tight connection.
  • Q: Why is it important to open the inlet slowly for commissioning?
    • A: Opening the inlet slowly is crucial to avoid a strong pressure surge that can potentially destroy the membrane. Always open it carefully.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

xylem User Manuals

Related Manuals