SPACEPAK AC-BASE-2 Secondary Drain Pan Instruction Manual

June 1, 2024
SPACEPAK

SPACEPAK AC-BASE-2 Secondary Drain Pan

Specifications

  • Model #:
    • AC-BASE-2: 27 x 25 x 1
    • AC-BASE-3: 36 x 34 x 1
    • AC-BASE-5: 46 x 44 x 1

Product Information

The BasePak secondary drain pan is designed to prevent property damage caused by condensate overflow in fan coil units located over ceilings. It ensures that any overflow is directed to a visible area to alert homeowners of unit malfunction.

Installation Instructions

  1. Ensure that the primary and secondary drain pan connections are on the same side but not tied into each other.
  2. If hanging the fan coil unit using the secondary drain pan, pre-drill holes at marked locations on the pan for threaded rod installation.
  3. Use washers on each rod underneath the pan for proper support.
  4. If placing the secondary drain pan directly on joists or a platform, use vibration isolation pads on each cross-rib.
  5. Attach a 3/4 nipple with teflon tape into the female fitting of the drain pan and run the drain line with proper pitch to ensure overflow visibility.

FAQ

  • Q: What is the purpose of a secondary drain pan?
    A: The secondary drain pan prevents property damage from condensate overflow in fan coil units and alerts homeowners of unit malfunction.

  • Q: How should I install the secondary drain pan?
    A: Follow the installation instructions provided, ensuring proper alignment, support, and drainage for effective operation.

BasePak
SECONDARY DRAIN PAN INSTALLATION INSTRUCTIONS

General

Secondary drain pans must be installed whenever a fan coil unit is located over a ceiling or where condensate overflow could cause property damage. The overflow should drain to a visible area that will alert the homeowner of unit malfunction.

Installation

Proper installation requires the secondary drain pans to be level. Install per the following:

  1. Location of primary drain pan connection and secondary drain pan connection must be on the same side. They MUST NOT be tied into each other.

  2. If the fan coil unit is to be hung using the secondary drain pan, pre-drill (4) holes to accommodate the appropriate threaded rod being used. Hole locations on the pan are pre-marked with a “dimple” at the ends of each cross-rib.
    NOTICE : Using Unistrut ® to hang both the pan and the unit is not required. However, if using the vibration isolation pads supplied inside each fan coil unit, Unistrut ® will alleviate the “bowing” which results and has no impact on pan performance (see Figure 1 for Unistrut ® cutting guide).

  3. Hardware must include a washer on each rod located on the bottom side of pan (see Figure 2).

  4. If secondary drain pan is to be set directly on joists or a platform, place a vibration isolation pad on each cross-rib of secondary drain pan.

  5. Attach a 3/4″ nipple (field supplied) using teflon tape into female fitting of drain pan, and run the drain line (with min. 1/4″ per foot of pitch) to ensure overflow is visible to homeowner.

NOTICE: SpacePak Secondary Drain Pans meet International Mechanical Code 307.2.3

SPACEPAK-AC-BASE-2-Secondary-Drain-Pan-

260 NORTH ELM STREET WESTFIELD, MA 01085 413-564-5530
7555 TRANMERE DRIVE
MISSISSAUGA, ONTARIO L5S 1L4 CANADA 905-670-5888

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals