AIRGUARD 7556 Blockage Prevention System Installation Guide

May 15, 2024
AirGuard

7556 Blockage Prevention System

Product Specifications

  • Product Name: AIRGUARD – Blockage Prevention System
  • Part Kit Number: Varies
  • Release Date: 2023-03-01

Product Usage Instructions

Step 1: Remove Existing Fan Screen

Remove the existing fan screen (Item 1) from the fan housing
(Item 2).

Step 2: Install Mounting Bracket

Install the supplied mounting bracket (Item 1) to the fan
housing (Item 2) using existing bolts and nuts (Item 3). Angle
mount the bracket in a position that ensures the supplied hydraulic
hoses reach the fan motor. Additional holes in the bracket face
(Item 4) are for easy access with an impact driver.

Step 3: Bolt Oil Cooler/Radiator Assembly

Bolt the Oil Cooler/Radiator Assembly (Item 1) to the BP System
Bracket (Item 2) using supplied 10mm x 25mm Bolts (Item 3) and 10mm
lock nuts (Item 4). If only installing the snorkel kit without the
radiator, then install plastic plugs (Item 5) onto the BP System
Bracket (Item 2).

Step 4: Mount Brackets

Remove the packaging materials prior to the assembly of these
brackets. Mount the BP System Main Bracket with Oil Cooler (Item 1)
or Main Bracket with Plugs (Item 2) to the Fan bracket (Item 3)
using supplied pivot pins (Item 4). Secure in place with 3.5mm
cotter pins (Item 5).

Step 5: Attach Mesh Screen or Snorkel Housing

Attach the Mesh Screen (Item 1) or Snorkel Housing (Item 2) to
the front of BPS using latches (Item 3).

Frequently Asked Questions (FAQ)

Q: Can I skip certain steps if I am only installing the snorkel

kit?

A: Yes, you can skip certain steps if you are only installing
the snorkel kit. Refer to Page 15 for remaining instructions on
Snorkel Mounting.

PART KIT INSTALL INSTRUCTIONS
Part Kit #VARIES – Rev 1.0 – AIRGUARD – Blockage Prevention System

Concord Aircarts
Release Date: 2023-03-01

Title STEP

Airguard Blockage Prevention System Upgrade Instructions 1. Remove existing fan screen (Item 1) from the fan housing (Item 2).

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

1 2

1 2
2

Item Part #

1

PARTS LIST Description Fan Screen

Aiguard Blockage Prevention System Upgrade Instructions

Item Part #

2

2023-03-01

PARTS LIST Description Fan Housing

1 Page 2

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
2. Install supplied mounting bracket (Item 1) to fan housing (Item 2) using existing bolts and nuts (Item 3). Angle mount bracket in a position that ensures the supplied hydraulic hoses reach the fan motor. Additional holes in bracket face (Item 4) are for easy access with an impact driver. Bracket may look different than shown below.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

3

23
1 Additional holes in bracket face are for easy access with an impact driver.

Item Part #

1

7556 /or/ 7554

2

PARTS LIST Description 9540 Bracket /or/ 9520 Bracket Fan Housing

Aiguard Blockage Prevention System Upgrade Instructions

Use Kit # 9540 for the following Models: · 2300 · 2800 · 3400 · 3350
Use Kit # 9520 for the following Models: · 3800 · 5250

Item Part #

3

2023-03-01

PARTS LIST Description Existing Hardware

Page 3

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

3. Bolt Oil Cooler/Radiator Assembly (Item 1) to BP System Bracket (Item 2) using REV # supplied 10mm x 25mm Bolts (Item 3)and 10mm lock nuts (Item 4). If only installing PART KIT # snorkel kit without Radiator, then install plastic plugs (Item 5) onto BP Sytem Bracket (Item 2). This step of the installation may already be completed at the Airguard factory prior to shipping.

3

2023-03-01 1.0 Varies

5

5 4
2

Item Part #

1

7996

2

7546

3

7515

PARTS LIST Description Oil Cooler and Manifold Assembly Main BP System Bracket Hex Bolt, 10mm x 25mm Grade 8.8

Aiguard Blockage Prevention System Upgrade Instructions

1

Item Part #

4

7516

5

7683

2023-03-01

PARTS LIST Description Lock Nut, 10mm Grade 8.8 BP System Bracket Plug

Page 4

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

4. Remove the packaging materials prior to the assembly of these brackets. Mount BP System Main Bracket with Oil Cooler (Item 1) or Main Bracket with Plugs (Item 2) to Fan bracket (Item 3) using supplied pivot pins (Item 4). Secure in place with 3.5mm cotter pins (Item 5).

REV # PART KIT #

2023-03-01 1.0 Varies

4

Remove Packaging material

4

and discard, prior to install.

5 3
1

Item Part #

1

2

3

2
PARTS LIST Description BP System Main Bracket with Oil Cooler BP System Main Bracket with Plugs for Snorkel Only Install Fan Bracket

Item Part #

4

7502

5

7513

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

PARTS LIST Description Pivot Pin For BP Systems 3.5mm Cotter Pin

Page 5

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
5. Attach Mesh Screen (Item 1) or Snorkel Housing (Item 2) to front of BPS using latches (Item 3).

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

For Snorkel Only Installation Skip to Page 15 for remaining instructions on Snorkel Mounting.

3

3

2

Item Part #

1

7568

2

7977

PARTS LIST Description Mesh Screen Snorkel Housing

Aiguard Blockage Prevention System Upgrade Instructions

1

Item Part #

3

2023-03-01

PARTS LIST Description Overcenter Latch

Page 6

Title

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

STEP

6. Identify the model of aircart that the Airguard Blockage Prevention System is being REV #

installed on. For models with external check valves, the connections must be made on PART KIT # the tractor side of the hydraulic circuit as shown below.

Installation with External Check Valve: Pressure Connection

2023-03-01 1.0 Varies

Case Drain Connection

Installation with Internal Check Valve:

Return Connection
Pressure Connection

Return Connection
Aiguard Blockage Prevention System Upgrade Instructions

Case Drain Connection
2023-03-01

Page 7

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

7. Remove factory hoses (Item 1) from side of fan motor (Item 2). Remove the hos- REV #

es (Item 1) on the tractor side of the external check valve, as shown below. Identify which hose is the pressure side of the circuit. On newer models there is a shut off

PART KIT #

valve on the pressure side of the circuit. The external check valve will have a direction-

al arrow that always points to the pressure side. If you do not have an external check

valve you will attach directly to the fan motor.

PRESSURE

2023-03-01 1.0 Varies

3

RETURN 1

1

2

Item Part #

1

2

PARTS LIST Description Existing Hose from Tractor to Fan Motor Hydraulic Motor

Aiguard Blockage Prevention System Upgrade Instructions

Item Part #

3

2023-03-01

PARTS LIST Description External Check Valve

Page 8

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
8. Hoses may be routed to suit your specific aircart installation. Install supplied 3/4″ hydraulic hose (Item 1) to the “TRACTOR PRESSURE” port of the radiator block (Item 2), using adapter (Item 3) to make the connection. Use model specific connection as per instuctions below to attach the other end of the hose to the factory pressure line (Item 4) that was removed from the fan motor.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

TRACTOR PRESSURE 4
MODEL SPECIFIC CONNECTION

2 3
1

TRACTOR PRESSURE PORT

Remove Plastic Plugs prior to installation

MODEL SPECIFIC CONNECTION

Aircart Models:

with 5/8″ JIC Pressure Hose

Connections

5

Aircart Models: with 3/4″ JIC Pressure Hose Connections

6

Aircart Models:

with 3/4″ ORFS Pressure Hose

All of the hydraulic connections in Step 8 to 12 should only be hand tightened until Connections

all hoses and fittings are installed. Some connections may need to be rotated in order

7

to install other components.

PARTS LIST

PARTS LIST

Item Part #

Description

Item Part #

Description

1

9016

2

3

7506

4

BPS 3/4″ Hydraulic Hose – 60″

5

7242

“TRACTOR PRESSURE” Port – BP System Manifold

6

7538

Fiting – Elbow – 3/4″ JIC Male – 3/4″ ORB Male

7

7209

Tractor Supply (Pressure) Hydraulic Hose

Fitting – Straight – 5/8″ JIC M – 3/4″ JIC M Fitting – Straight – 3/4″ JIC M – 3/4″ JIC M Fitting – Straight – 3/4″ JIC M – 3/4″ ORFS M

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 9

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
9. Install supplied 3/4″ hydraulic hose (Item 1) to the “TRACTOR RETURN” port of the radiator block (Item 2) using adapter (Item 3). Use model specific connection as per instuctions below to attach the other end of the hose to the factory pressure line (Item 4) that was removed from the fan motor.

RELEASE DATE REV # PART KIT #

TRACTOR RETURN

2 3

2023-03-01 1.0 Varies
Remove Plastic Plugs prior to installation

4
MODEL SPECIFIC CONNECTION

TRACTOR RETURN PORT
1

MODEL SPECIFIC CONNECTION

Aircart Models:

with 5/8″ JIC Return Hose

Connections

5

Aircart Models: with 3/4″ JIC Return Hose Connections

6

Aircart Models:

with 3/4″ ORFS Return Hose

All of the hydraulic connections in Step 8 to 12 should only be hand tightened until Connections

all hoses and fittings are installed. Some connections may need to be rotated in order

7

to install other components.

PARTS LIST

PARTS LIST

Item Part #

Description

Item Part #

Description

1

9016

2

3

7506

4

BPS 3/4″ Hydraulic Hose – 60″ “TRACTOR RETURN” Port – BP System Manifold Fiting – Elbow – 3/4″ JIC Male – 3/4″ ORB Male Tractor Return Hydraulic Hose

5

7242

6

7538

7

7209

Fitting – Straight – 5/8″ JIC M – 3/4″ JIC M Fitting – Straight – 3/4″ JIC M – 3/4″ JIC M Fitting – Straight – 3/4″ JIC M – 3/4″ ORFS M

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 10

Title

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE 2023-03-01

STEP

10. Install supplied 3/4″ hydraulic hose (Item 1) to the “FAN PRESSURE” port of the radiator block (Item 2) using adapter (Item 3). Use model specific connection as per instuctions below to attach the other end of the hose to the factory fan pressure line/ port (Item 4) coming from the fan motor.

REV # PART KIT #

1.0 Varies

MODEL SPECIFIC CONNECTION

1 3

4 FAN PRESSURE

All of the hydraulic connections in Step 8 to 12 should only be hand tightened until all hoses and fittings are installed. Some connections may need to be rotated in order to install other components.

Remove Plastic Plugs prior to installation

MODEL SPECIFIC CONNECTION

2

FAN

Aircart Models:

PRESSURE with 5/8″ JIC Pressure Hose

PORT

Connections

5

6

Aircart Models: with 3/4″ JIC Pressure Hose Connections
5

Aircart Models:

with 3/4″ ORFS Pressure Hose

Connections

7

5

Item Part #

1

9016

2

3

7506

4

PARTS LIST Description BPS 3/4″ Hydraulic Hose – 60″ “FAN PRESSURE” Port – BP System Manifold Fiting – Elbow – 3/4″ JIC Male – 3/4″ ORB Male Fan Supply (Pressure) Hydraulic Hose

Item Part #

5

7539

6

7226

7

7588

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

PARTS LIST Description Fitting – Elbow – 3/4″ JIC M – 3/4″ JIC F Fitting – Straight – 3/4″ JIC M – 5/8″ JIC F Fitting – Straight – 3/4″ JIC M – 3/4″ ORFS F
Page 11

Title

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE 2023-03-01

STEP

11. Install supplied 3/4″ hydraulic hose (Item 1) to the “FAN RETURN” port of the REV #

radiator block (Item 2) using adapters (Item 3 & 5). Use model specific connection as per instuctions below to attach the other end of the hose to the factory fan return line/

PART KIT #

port (Item 4) coming from the fan motor.

1.0 Varies

MODEL SPECIFIC CONNECTION
FAN RETURN

3

1

5

2

FAN RETURN PORT

All of the hydraulic connections in Step 8 to 12 should only be hand tightened until all hoses and fittings are installed. Some connections may need to be rotated in order to install other components.

Remove Plastic Plugs prior to installation

MODEL SPECIFIC CONNECTION

Aircart Models:

with 5/8″ JIC Return Hose Connections

5

6

Aircart Models: with 3/4″ JIC Return Hose Connections
5

4

Aircart Models: with 3/4″ ORFS Return Hose

Connections

7

5

Item Part #

1

9016

2

3

7543

4

PARTS LIST Description BPS 3/4″ Hydraulic Hose – 60″ “FAN RETURN” Port – BP System Manifold Fitting – Straight – 3/4″ JIC Male – 3/4″ ORB Male Fan Return Hydraulic Hose

Item Part #

5

7539

6

7226

7

7588

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

PARTS LIST Description Fitting – Elbow – 3/4″ JIC M – 3/4″ JIC F Fitting – Straight – 3/4″ JIC M – 5/8″ JIC F Fitting – Straight – 3/4″ JIC M – 3/4″ ORFS F
Page 12

Title

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE 2023-03-01

STEP

12. Install supplied 1/2″ hydraulic hose (Item 1) to the “CASE DRAIN” port of the radiator block (Item 2) using adapters (Item 3 & 4). and to the fan motor case drain line (Item 5). Use model specific connection as per instuctions below to attach the other end of the hose to the factory fan case drain line/port (Item 5) coming from the fan motor.

REV # PART KIT #

1.0 Varies

MODEL

4

SPECIFIC

CONNECTION

3

All of the hydraulic connections in Step 8 to 12 should only be hand tightened until all hoses and fittings are installed. Some connections may need to be rotated in order to install other components.

Remove Plastic Plugs prior to installation

MODEL SPECIFIC CONNECTION

1

Aircart Models:

with 3/8″ JIC Case Drain

9

5

FAN CASE

Hose Connections

10

4

2

DRAIN PORT

Aircart Models:

with 1/2″ JIC Case Drain

4

Hose Connections

6

Aircart Models: with 1/2″ ORFS Case Drain Hose Connections

7 4
8

Item Part #

1

7267

2

3

7264

4

7686

5

PARTS LIST

Description

Item

BPS 1/2″ Hydraulic Hose – 60″

6

“FAN CASE DRAIN” Port – BP System Manifold

7

Fitting – Straight – 1/2″ JIC Male – 3/8″ ORB Male

8

Fiting – Elbow – 1/2″ JIC M – 1/2″ JIC F

9

Fan Case Drain Hydraulic Hose

10

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Part # 7263 7265 7266 7294 7293

PARTS LIST Description Fitting – Tee – 1/2″ JIC M – M – F Fitting – Straight – 1/2″ JIC M – 1/2″ ORFS F Fitting – Tee – 1/2″ ORFS M – M – F Fitting – Straight – 1/2″ JIC M – 3/8″ JIC F Fitting – Tee – 3/8″ ORFS M – M – F
Page 13

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
13. If you have purchased a bypass kit for your BP System, please refer to the bypass kit owners manual for connection instructions.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

BYPASS KIT INSTRUCTION MANUAL

PARTS LIST

Item Part #

Description

1

Aiguard Blockage Prevention System Upgrade Instructions

Item 2 2023-03-01

Part # —

PARTS LIST Description —

Page 14

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
14. Complete the hydraulic installation by ensuring that all connections made in Step 8 to 13 are tightened. Position/Routing of hydraulic hoses may vary to suit each specific machine installation. Zip tie hoses to reduce wear and ensure tidy installation.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

DO NOT ADJUST VALVES

WARNING:
· Check for contaminants in oil. Dirty oil makes for plugged valves and can cause issues with over pressurizing the radiator core.
· Start tractor and warm oil prior to starting up fan. This should be done anytime the fan circuit is started up.
· Engage fan hydraulics at low flow rate and low fan RPM and slowly increase.
· Bleed hydraulic lines of air for stable oil flow.
· Check pressures at radiator gauge. If pressure is higher than normal, steps must be taken to reduce return line pressure.
· Call Airguard if you have any questions. 1-604-744-0070

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 15

Title STEP

Airguard Blockage Prevention System Upgrade Instructions 15. Start up operating procedure.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

—– WARNING —–

START UP PROCEDURE:

Start up procedure is critical to reduce pressure spikes.

After you have installed the Airguard Blockage Prevention System it’s critical that you start the Aircart fans very slowly. You’re introducing an air pocket that must be moved slowly to the tractor while you prime the hydraulic lines with oil. This process is a good way to make sure your fittings are sealed and secure.

1. Get your oil warmed to 80-100 deg F. If your oil is cold, the viscosity is very high and it will not move through the internal components easily. By warming the oil first, everything will operate as it should.
2. Initiate your fans with 500 Fan RPM at 25% oil flow (or 10% of your max fan speed). If everything looks good, the pressure is just starting to register on the Airguard pressure gauge. If all your fittings are holding their seal, continue to the next step. If your fan is NOT moving, that’s okay. The oil is circulating. Operate this way for 5 minutes.

NOTE: If there is a pressure spike at this low oil flow rate, there is potential for an air lock. Disconnect the end fitting on the Return Line at the SCV and drain off some oil to release the pressure. Reconnect the end fitting and repeat Step 2.

3. Run 1000 Fan RPM at 45% oil flow (or 35% of your max fan speed). Operate for 5 seconds.

4. Run 2000 Fan RPM at 65% oil flow (or 75% of your max fan speed). Operate for 5 seconds.

5. Run 3500 Fan RPM at 85% oil flow (or 100% of your max fan speed). Operate for 3-5 minutes.

6. Take time to ensure that your conveyor or auger is working properly in conjunction with your Airguard kit. Turn your fan RPM down to 50% oil flow and engage the conveyor/auger. If everything is operating as it should, you have successfully installed your Airguard Blockage Prevention System kit. If there are any questions or concerns about the operations, call your AIRGUARD Sales Representative using contact information found at www.airguardproducts.com/contact or visit us at www.airguardproducts.com/productsupport.

Now you’re ready to operate! Follow the same warm up procedure you do every day and go seed. This is a procedure that we highly recommend at the beginning of each future season, to ensure the continuation of successful operations. It is a critical step in the introduction of new machinery to your farm operation. After the freeze and thaw of seasons we want to eliminate any air pockets or leaks that could slow preparations.

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 16

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
16. There are three ways to mount the Snorkel Kit. It can be mounted directly to the catwalk (Page 18), to the railing (Page 19), or using the model- specific Snorkel Mounting Kit (Pages 21-23).

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

CATWALK

RAILING

SNORKEL MOUNTING KIT

THREE SNORKEL MOUNTING OPTIONS

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 17

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

17. Catwalk Installation: Drill two 7/16″ holes in your catwalk (Item 2) 1-3/4″ apart. Using the two bolts (Item 3) and lock nuts (Item 4) provided, bolt the top Snorkel Inlet Assembly (Item 1) directly to the catwalk. Use the bridge clamp (Item 5) to attach 8″ flexible hose (Item 6) to top Snorkel Inlet (Item 1).

REV # PART KIT #

2023-03-01 1.0 Varies

2

1 5

Item Part #

1

7576

2

—-

3

7515

PARTS LIST Description Top Snorkel Inlet Assembly Catwalk Hex Bolt, 10mm x 25mm GRADE 8.8

Aiguard Blockage Prevention System Upgrade Instructions

Item 4 5 6
2023-03-01

Part # 7516 7578 7572

4 3
2

6
PARTS LIST Description Lock Nut, 10mm GRADE 8.8 Bridge Clamp, 8″ Flexible Snorkel Hose – 8″

Page 18

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

18. Railing Installation: Using two of the bolts (Item 4) and lock nuts (Item 5) pro- REV # vided, hand-tighten the Snorkel Inlet 90deg mount plate (Item 2) and the railing plate PART KIT # (Item 3) around the railing (Item 8). Next, bolt the top Snorkel Inlet assembly (Item 1) to te mount plate (Item 2). Straighten so that the assembly is perpendicular to the railing, then fully tighten. Last, use the bridge clamp (Item 6) to attach 8″ flexible hose (Item 7) to top Snorkel Inlet (Item 1).

2023-03-01 1.0 Varies

4

1

3 4

2

6

5 7
8

Item Part #

1

7576

2

7593

3

7989

4

7991

PARTS LIST Description Top Snorkel Inlet Assembly Snorkel Inlet 90deg Mount Plate Railing Plate HEX BOLT, 10mm x 50mm GRADE 8.8

Aiguard Blockage Prevention System Upgrade Instructions

Item 5 6 7 8
2023-03-01

Part # 7516 7578 7572 —-

PARTS LIST Description Lock Nut, 10mm Bridge Clamp, 8″ Flexible Snorkel Hose – 8″ Railing

Page 19

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

19. Install the brackets (Item 1 & 2) onto Aircart HSS Frame (Item 3) using supplied REV # hardware. Use 12mm x 30mm (Item 4) and 12mm lock nuts (Item 5) for top connec- PART KIT # tion. Use 12mm x 110mm-160mm (Item 6, 7 or 8) and 12mm lock nuts (Item 5) for bottom connection. Bracket is designed to fit HSS Beams 3″-5″ x 3″-10″ in vertical or horizonal mount positions.

2023-01-01 1.0 Varies

4

6 1

7

8

3

2 2

5

3

Item Part #

1

7869

2

7873

3

4

7861

PARTS LIST Description Adjustable HSS Backing Plate Adjustable HSS Bracket Assembly Aircart HSS Frame Hex Bolt, 12mm x 30mm

Aiguard Blockage Prevention System Upgrade Instructions

Item 5 6 7 8
2023-03-01

Part # 7669 7862 7863 7864

Tow Behind
PARTS LIST Description Lock Nut, 12mm Hex Bolt, 12mm x 110mm Hex Bolt, 12mm x 130mm Hex Bolt, 12mm x 160mm

Page 20

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
20. Mount outer vertical channel (Item 1) to Mount Bracket (Item 2) using supplied 12mm x 80mm Bolts (Item 3) and 12mm lock nuts (Item 4).

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

1

3

Item Part #

1

7865

2

PARTS LIST Description Outer Vertical Channel Mount Bracket

Aiguard Blockage Prevention System Upgrade Instructions

2

4

Item 3 4
2023-03-01

Part # 7859 7669

PARTS LIST Description Hex Bolt, 12mm x 80mm Lock Nut, 12mm

Page 21

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

21. Attach air intakes (Item 1) to upper vertical channel (Item 2) using supplied 10mm REV # x 25mm Bolts (Item 3) and 10mm lock nuts (Item 4). A maximum of 4 intakes can be PART KIT # mounted. Use bridge clamp (Item 5) to attach 8″ flex hose (Item 6) to air intake (Item 1).

2023-03-01 1.0 Varies

3

1

4

5

6 2

Item Part #

1

7576

2

7868

3

7515

PARTS LIST Description Air Intake Bracket Upper Vertical Channel Hex Bolt, 10mm x 25mm

Aiguard Blockage Prevention System Upgrade Instructions

Item 4 5 6
2023-03-01

Part # 7516 7578 7572

PARTS LIST Description Lock Nut, 10mm Bridge Clamp, 8″ Flexible Snorkel Hose – 8″

Page 22

Title STEP

Airguard Blockage Prevention System Upgrade Instructions

RELEASE DATE

22. Determine desired height of air intakes and secure upper vertical channel (Item 1) REV # to lower vertical channel (Item 2) at that location. Use supplied 12mm x 80mm Bolts PART KIT # (Item 3) and 12mm lock nuts (Item 4).

2023-03-01 1.0 Varies

3 4
2 1

Item Part #

1

7868

2

7865

PARTS LIST Description Upper Vertical Channel Lower Vertical Channel

Aiguard Blockage Prevention System Upgrade Instructions

Item 3 4
2023-03-01

Part # 7859 7669

PARTS LIST Description Hex Bolt, 12mm x 80mm Lock Nut, 12mm

Page 23

Title STEP

Airguard Blockage Prevention System Upgrade Instructions
23. Attach 8″ flex hose (Item 1) to snorkel housing (Item 2) using bridge clamp (Item 3). Zip tie 8″ flex hoses to reduce wear and ensure tidy installation.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

1 3

2

Item Part #

1

7977

2

7578

PARTS LIST Description Snorkel Housing Bridge Clamp, 8″

Aiguard Blockage Prevention System Upgrade Instructions

Item Part #

3

7572

2023-03-01

PARTS LIST Description Flexible Snorkel Hose – 8″

Page 24

Title STEP

Airguard Blockage Prevention System Upgrade Instructions Installation is Completed. Ensure all hydraulic connections and bolts are tightened.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

COMPLETED INSTALLATION WITH NO SNORKEL

COMPLETED INSTALLATION WITH SNORKELS

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 25

Title STEP

Airguard Blockage Prevention System Upgrade Instructions Troubleshooting and preventative maintenance.

PREVENTATIVE MAINTENANCE 1. Ensure that the startup procedure on page 16 is performed
every morning before seeding begins. 2. Take extra precautions when seeding in cold weather. 3. It is recommended that a bypass valve is purchased to allow
for quicker startup.

TROUBLESHOOTING

Trouble

Probable Cause

Fluctuating pressures on pressure High return line pressure gauges and strange noises coming from fan motor.

Faulty quick disconnect couplers

Fan won’t run

Restriction in return line due to small fitting Logic cartridge is contaminated High return line pressure

Quick couplers are disconnected Logic cartridge is contaminated Logic cartridge is faulty Hoses are hooked up incorrectly

Cannot get fan speed up to normal levels

Pressure/flow is too low at tractor

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

Remedy
The logic cartridge on the BP System is set to 750psi. Any value close to or above that will cause fluctuations and issues with fan speed. Reduce return line pressure to fix this problem. Replace quick disconnect couplers, inspect ball valve to ensure proper working order Replace fitting with a larger one Clean or replace the logic cartridge as needed The logic cartridge on the BP System is set to 750psi. Any value close to or above that will cause fluctuations and issues with fan speed. Reduce return line pressure to fix this problem. Ensure that quick couplers are connected properly
Clean or replace the logic cartridge as needed
Replace the logic cartridge
Consult owner’s manual to see proper installation of hoses Increase pressure/flow
Page 26

Title STEP

Airguard Blockage Prevention System Upgrade Instructions Frequently asked questions.

RELEASE DATE REV # PART KIT #

2023-03-01 1.0 Varies

FREQUENTLY ASKED QUESTIONS
Q: Why can’t I operate my Blockage Prevention System without warming up my tractor first? A: Tractor motors and seeding equipment are built to withstand fast startups; an aluminum radiator is not. On a cold day at 10% oil flow, your return pressure could be at 500psi on our Blockage Prevention System. If you were to do a fast startup in cold conditions, you could have a radiator fail. Pressures could dramatically spike beyond the capacity of our 2400psi rated aluminum core.
Q: Will the Blockage Prevention System cause dramatic pressure drops in my oil flow? A: While the BPS will cause a slight pressure drop (approximately 400 RPM or less), the drop in oil flow is negated because of the warm air being transferred from the oil into the airstream. This allows the internal product to flow more efficiently. The reason for the slight pressure drop is that the oil has to pass through the orifices of the radiator, which are smaller than the hoses used prior to the installation of the Blockage Prevention System.
Q: Does the Blockage Prevention System actually work? A: We can honestly say that it does. The hotter the oil is in the hydraulic lines, the more heat the Blockage Prevention System can extract out of that oil. Since the mechanism is mounted on the face of the fan housing, the fan is pulling air through the fins of the radiator while the air cart is pressurizing up to operate. The hot oil, running through the radiator, acts like a furnace and changes the air temperature on the inside face of the radiator. That air is then pulled into the air cart stream and is pushed out towards the openers, where the seed is placed into the furrow. Warmer air holds more moisture. Humidity will stay in a vapor state when it is drawn in and will be less likely to turn into a liquid while the air and all the hoses and internal components are physically warmer. This allows the product to flow through with less resistanc eand minimizes buildup of dusty fertilizer internally. Seed and fertilizer will be delivered to the discharge outlets without problems.
Q: What is the purpose of the new bypass valve? A: The new bypass valve upgrade kit allows you to heat up your oil before engaging your Blockage Prevention System. You can also choose whether or not to use your BPS in the heat of the day.
Q: What pressure should the pressure gauge read on the Blockage Prevention System? A: 300-600psi is an acceptable pressure range when operating. The gauge reads the pressure of the oil going through the radiator, on the return side of the fan motor.
Q: Do I need to reset the relief valves on the V2 Blockage Prevention System? A: No you do not. The valves are preset to 750psi and 850psi. If they do get changed or altered, please contact Airguard in order to have them reset.

Aiguard Blockage Prevention System Upgrade Instructions

2023-03-01

Page 27

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals