DOLGABA Rain Shower Head Straight Arm Instruction Manual

June 1, 2024
DOLGABA

DOLGABA Rain Shower Head Straight Arm

DOLGABA Rain Shower Head Straight Arm

Parts

NO Name
1 Escutcheon Plate
2 Circular hanging pipe
3 Thread seal Tape

Dimension

Dimension

The size is for reference only, please refer to the actual product.
Dimension

Installation

Installation
Installation

  1. Insert the decorative cup from the side of the 1/2NPT thread of the hanging pipe.
  2. After putting the hanging pipe into the decorative cup, wrap an appropriate amount of raw material tape, and then fasten the hanging pipe to the water pipe in the wall.
  3. Install your own overhead shower on the hanging pipe.

Installation

In order to keep the surface clean and bright, please clean the product regularly, the cleaning method is as follows:

  1. Use clean water and a soft cloth to remove surface dirt as much as possible.
  2. Use one of the cleaners listed below to remove surface dirt
    • Mild liquid cleanser.
    • Colorless glass cleaner that completely dissolves non-abrasive, powdered cleaners (mix according to manufacturer’s directions)
    • Non-abrasive polishing fluid
    • Never use abrasive cleaners, abrasive cloths or paper towels.
    • Never use any acidic cleaning agents.
  3. After cleaning, please immediately remove all detergents with clean water and dry them with a soft cotton cloth.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals