Carrier 30XF Chiller Range Instruction Manual
- June 1, 2024
- Carrier
Table of Contents
- 30XF Chiller Range
- Introduction
- General safety considerations
- Storage and transportation safety considerations
- Receipt safety considerations
- Handling/Installation on site safety considerations
- Operation user safety considerations
- Start-up safety considerations
- Maintenance and repair safety considerations
- Final shutdown safety considerations
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
ENVIRONMENT HEALTH & SAFETY INSTRUCT IONS
FOR 30XF UNITS
30XF Chiller Range
The illustrations
in this document are for illustrative purposes only and not part of any offer
for sale or contract. The manufacturer reserves the right to change the design
at any time without notice.
Information stated in this addendum is intended to warn about risks that are
specific to 30XF-Z units.
A1: Duplex 30XF-Z units
➔ Risk due to accessible live terminations
WARNING: For units with two modules, live cable terminations intended for
hazardous voltage are accessible when units are delivered from factory.
Cables for electrical connections between modules A and B are installed inside
module A but are not factory-fitted on electrical terminals.
Electrical connections on both sides are required once the modules have been
handled and positioned.
Refer to the electrical wiring diagram for identification of all the
connections.
For all connections with hazardous voltage there is a risk of injury or death
if the power is applied while the conductors are not connected inside module
B.
To avoid that:
– PERFORM CONNECTIONS ON MODULE B CORRESPONDING TERMINALS BEFORE MODULE A
CORRESPONDING TERMINALS.
– BEFORE APPLYING POWER, ALWAYS CHECK THAT ALL CONNECTIONS ARE DONE INSIDE
MODULE B.
– CROSS CHECK WITH ELECTRICAL WIRING DIAGRAM THAT ALL CONNECTIONS HAVE BEEN
DONE.
Some additional information is present in unit Installation, Operation &
Maintenance (IOM) manual.
A2: Options 85A & 85B on 30XF-Z
➔ Risk due to dual electrical power supply
WARNING: When options 85A or 85B is present, two electrical power
supplies are present.
Refer to the detailed electrical wiring diagram for identification of both
electrical circuits. To switch off the machine, both power supplies must be
switched off and logged.
The unit is not designed to allow intervention on the electrical equipment if
the two power supplies are not disconnected. Particularly, options 85A and 85B
are not intended to allow operation of the unit while servicing operations are
done on the unit.
ALWAYS DISCONNECT THE TWO DEVICES ON THE UNIT BEFORE SERVICING THE EQUIPMENT.
Measures to reduce the risk of a partial shutdown include labelling,
visibility of the two disconnecting devices simultaneously and their
proximity.
If the machine is locked out at the customer’s facility, the effectiveness of
these measures is reduced: it is necessary to provide measures at the facility
and to the personnel involved to remind the presence of both power supplies.
A3: Option 295+
➔ Risk due to permanent 24 Vdc
WARNING: For units with option 295+, 24Vdc voltage is present even if
main disconnect switch is open.
A capacitor module that stores energy is installed in the main cabinet in
order to supply some control devices. This allows to maintain voltage even if
main power supply is missing.
Refer to the electrical wiring diagram and the Installation, Operation &
Maintenance (IOM) manual. for identification of the module and the components
that it energizes as well as details about durations.
Introduction
This safety manual applies for all types of chillers & heat pumps.
It refers, when necessary, to information included in the installation,
operation and maintenance (IOM) manual of your unit. The IOM is available on
line (flash the QR code on the unit to access the IOM).
Prior to the initial start-up of the chiller, people involved in the storage,
transportation, handling, on-site installation, start-up, operation, and
maintenance of this unit should read, understand and be thoroughly familiar
with these instructions, the installation, operation and maintenance manual
and the specific project data for the installation site.
Units are designed to cool/heat water for the air conditioning of buildings
and industrial processes.
Units are designed to provide a very high level of safety during installation,
start-up, operation and maintenance. They will provide safe and reliable
service when operated within their application range.
The manufacturer recommends to perform a periodic requalification of the
refrigerant circuit according to applicable local regulations.
Except in case of a most restrictive local regulation, the manufacturer then
recommends a 5 years periodicity requalification. It is user’s responsibility
to ensure that the final installation respects all local, national and
international regulations.
This manual provides the necessary information to safely do all operations on
the equipment from installation to dismantling.
General safety considerations
The unit must be installed in a place that is not accessible to the public or
protected against access by non-authorized persons. The units are not intended
to operate in an ATEX area, unless specified in the IOM.
Do not modify or bypass any of the safety guards or switched in the system.
The main working place for the operator of the unit is in front of the control
panel (see IOM for the position of the operator workstation).
All operations on the unit must be carried out by authorized, qualified and
trained people to do it using appropriate tools. All persons who have to work
with the equipment must wear personal protective equipment adapted to the
intervention on the unit:
– Safety shoes
– Safety gloves or specific hand protection (cut resistant gloves, chemical
gloves, thermic gloves, …)
– Head protection
– Ears protection
– Eyes or face protection (safety glasses, goggles, facial shed)
– A2L detector if A2L gas in the chiller
Additional equipment may be required, depending on the risk analysis that must
be done prior to any intervention.
Do not wear clothes or accessories that can get caught or sucked in by flows
of air, tie back long hair before entering the unit.
No combustible matter should be placed within 6.5m of the unit.
RISK OF FALLING:
No part of the unit must be used as a walk-way, rack or support.
Periodically check and repair or if necessary replace any component or piping
that shows signs of damage.
The refrigerant lines can break under the weight and release refrigerant,
causing personal injury.
Use a platform, or staging to work at higher levels.
RISK OF BURN:
The surfaces of the machine and pipes can be very hot or cold and cause the
risk of burn
MOVING PARTS :
Do not remove the guards from moving parts while the unit is operating.
Make sure that moving parts are fitted correctly before restarting the unit.
RISK IN CASE OF LEAK:
Do not use your hands to check possible refrigerant leaks.
Ensure good ventilation, as accumulation of refrigerant in an enclosed space
can displace oxygen and cause asphyxiation or explosions.
Inhalation of high concentrations of vapor is harmful and may cause heart
irregularities, unconsciousness, or death. Vapor is heavier than air and
reduces the amount of oxygen available for breathing. These products cause eye
and skin irritation.
Decomposition products are hazardous.
Avoid contact with liquid refrigerant. Wash any spills from the skin with soap
and water. If liquid refrigerant enters the eyes, immediately and abundantly
flush the eyes with water and consult a doctor.
The accidental releases of the refrigerant, due to small leaks or significant
discharges following the rupture of a pipe or an unexpected release from a
relief valve, can cause frostbites and burns to personnel exposed. Do not
ignore such injuries. Installers, owners and especially service engineers for
these units must:
– Seek medical attention before treating such injuries.
– Have access to a first-aid kit, especially for treating eye injuries.
Never apply an open flame or live steam to a refrigerant container.
Dangerous overpressure can result.
In case of combustion of refrigerant, do not clean combustion by-products
with water, the mixture is highly corrosive.
RISK OF FLAMMABILITY:
If the unit contains refrigerant other than A1, always used certified
detector for the refrigerant used when near the unit.
Default Atex zone is 0.6m around the unit. for more details on your unit zone
(for refrigerant other than A1), please refer to the dedicated instruction,
operation & maintenance (IOM) instruction.
RISK OF EXPLOSION:
**** Never exceed the specified maximum allowable pressures.
Verify the allowable maximum high-side and low-side pressures by given on the
unit name plate and… checking the instructions in this manual.
Storage and transportation safety considerations
When it is necessary to store the unit before installation, it is mandatory to
observe some precautions :
– do not remove the protection,
– protect the unit from dust and bad weather
The units are intended to be stored and operated in an environment where the
ambient temperature must not be lower than the minimum allowable temperature
not be higher than the maximum allowable temperature indicated on the
nameplate.
Never cover any protective device.
This applies to any relief valves (if used) in the refrigerant or heat
transfer medium circuits and the pressure switches.
Do not obstruct any protective device.
This applies to any rupture disks and valves fitted on the refrigerant or heat
transfer fluid circuits.
Receipt safety considerations
Check that the unit and the accessories have not been damaged during transport
and that no parts are missing. If the unit and the accessories have been
damaged or the shipment is incomplete, send a claim to the shipping company.
Compare the name plate data with the order.
The name plate is attached in two places to the unit :
– On the outside of one of the unit frames,
– On the electrical cabinet, inside.
The unit name plate must include the following information:
– Model number and size,
– Leak tightness test date,
– Fluid used for transport,
– Refrigerant used with his GWP,
– Refrigerant charge per circuit,
– PS: Min./max. allowable pressure (high and low pressure side),
– TS: Min./max. allowable temperature (high and low pressure side),
– Pressure switch cut-out pressure,
– Voltage, frequency, number of phases,
– Maximum current,
– Maximum power input,
– Unit net weight.
Handling/Installation on site safety considerations
Do not remove the skid or the packaging until the unit is in its final
position.
Do not throw away lifting instruction present on the tarpaulin.
The manufacturer strongly recommends employing a specialized company to load
or unload the machine.
Lift the unit using the lifting instruction provided.
Unit’s weight is indicated on the nameplate.
Units can be moved with a fork lift truck, as long as the forks are positioned
in the correct place and direction on the unit.
The units can also be lifted with slings, using only the designated lifting
points marked on the unit according the lifting instructions on the certified
drawings supplied with the unit. Use slings or lifting beams with the correct
capacity that have been tested and certified.
Do not tilt the unit more than 15°.
The unit must be placed on hard ground or concrete.
CAUTION: Before lifting the unit, check that all casing panels and
grilles are securely fixed in place. Lift and set down the unit with great
car. Tilting and jarring can damage the unit.
WARNING: never apply pressure or leverage to any of the unit’s panels or
uprights; only the base of the unit frame is designed to withstand such
stresses. No force or effort must be applied to pressurized parts, especially
via pipes connected to the water-cooled heat exchanger (with or without the
hydraulic kit if the unit is equipped with this).
Operation user safety considerations
Ensure you read and understood this instruction before accessing the unit.
Start-up safety considerations
After the unit has been received, when it is ready to be installed or
reinstalled, and before it is started up, it must be inspected for damage:
– Check that the refrigerant circuit(s) is (are) intact, especially that no
components or pipes have shifted (e.g. following a shock).
– If in doubt, carry out a leak tightness check and verify withthe
manufacturer that the circuit integrity has not been impaired.
– If damage is detected up on receipt, immediately fill a claim with the
shipping company.
Check that the protective devices are well installed and not covered before
operating the unit.
The unit complies with the pressure equipment regulation.
The list of pressure equipment integrated in the unit is given in the
declaration of conformity.
NOTE: Pressure equipment for the hydraulic side (optional) are delivered
as separate items. Their integration in the complete hydraulic installation
remain under the user’s responsibility.
In accordance with local regulation :
– Pressure equipment must be checked periodically, see in the maintenance part
of this manual.
– The relief valves are not safety accessories but damage limitation
accessories in case of an external fire.
Do not remove valves, even if the fire risk is under control for a particular
installation. There is no guarantee that the accessories have been re-
installed if the system is changed or for transport with a gas charge.
SAFETY DEVICES CLASSIFICATION
| Safety accessories (1)| Over pressure protection in case
of an external fire (2)
Refrigerant side| |
High-pressure switch| X|
External relief valve(3)| | X
Rupture disk| | X
Heat transfer fluid side| |
External relief valve| (4)| (4)
(1) Classified for protection in normal service situations.
(2) Classified for protection in abnormal service situations. These
accessories are sized for fires with a thermal flow of 10kW/m².
(3) The instantaneous over-pressure limitation of 10% of the operating
pressure does not apply to this abnormal service situation (see EN 764-7 §7.2
/ Guideline E-02 / EN378-2 §6.2.2.3).
(4) The selection of these discharge valves must be made by the personnel
responsible for completing the hydraulic installation.
NEVER COVER ANY PROTECTIVE DEVICE.
This applies to any relief valves (if used) in the refrigerant or heat
transfer medium circuit sand the pressure switches.
DO NOT OBSTRUCT ANY PROTECTIVE DEVICE.
This applies to any rupture disks and valves fitted on the refrigerant or heat
transfer fluid circuits.
Check whether the original protection plugs are still present at the valve
outlets. These plugs are generally made of plastic and should not be used. If
there are still present, please remove them.
Fit devices at the valve or discharge piping outlets to prevent the
penetration of foreign bodies (dust, building debris, etc.) and atmospheric
agents (water can form rust or ice).
These devices, as well as the discharge piping, must not impair operation or
lead to a pressure drop that is higher than 10% of the set pressure.
If the relief valves are installed on a change-over valve, this is equipped
with a relief valve on each of the two outlets. Only one of the two relief
valves is in operation, the other one is isolated.
Never leave the change-over valve in the intermediate position, i.e. with both
ways open bring the actuator in abutment, front or back according to the
outlet to isolate.
If a relief valve is removed for checking or replacement, ensure that there is
always an active relief valve on each of the change-over valves installed in
the unit.
All factory installed relief valves are lead-sealed to prevent any calibration
change.
The external relief valves must always be vented to outside if the units are
installed in a closed space.
Refer to the installation regulations, for example those of standard EN 378-3
and EN 13136.
These pipes must be installed in a way that ensures that people and property
are not exposed to vented refrigerant. As the fluids can be diffused in the
air, ensure that refrigerant is discharged away from building air intakes, or
they must be discharged in a quantity that is appropriate for a suitably
absorbing environment.
It is recommended to install an indicating device to show if part of the
refrigerant has leaked from the valve. The presence of oil at the outlet
orifice is a useful indicator that refrigerant has leaked.
Keep this orifice clean to ensure that any leaks are obvious.
Provide a drain in the discharge circuit, close to each relief valve, to avoid
an accumulation of condensate or rain water.
Relief valves must be checked periodically.
External relief valves Model| 3060- –| 3061- –|
Other Model
---|---|---|---
Replacement Cycle| Every 5 years| Every 9 years| Every 5 years
When the unit is subjected to fire, relief devices prevent rupture due to
over-pressure by releasing refrigerant. The fluid may then be decomposed into
toxic residues when subjected to the flame:
– Stay away from the unit
– Set up warnings and recommendations for personnel in charge to stop the
fire.
– Fire extinguishers appropriate to the system and the refrigerant type must
be easily accessible.
– Do not clean combustion by-products with water, the mixture is highly
corrosive.
– Do not restart the unit after it has been submitted to a fire. Material may
have been seriously damaged by the heat.
– Restart may only be possible after detailed verification by a competent
personnel in order to insure that the unit has not suffered any damage.
Maintenance and repair safety considerations
Never work on a unit that is still energized.
All installation parts must be maintained by the personnel in charge, in order
to avoid material deterioration and injuries to people.
Faults and leaks must be repaired immediately. The authorized technician must
have the responsibility to repair the fault immediately. Each time repairs
have been carried out to the unit, the operation of the protection devices
must be re-checked.
All maintenance and repair operation must be done in compliance with
regulations and IOM. Only use original replacement parts for any repair or
component replacement.
Consult the list of replacement parts that corresponds to the specification of
the original equipment.
The manufacturer recommends the following drafting for a logbook (the table
below should not be considered as reference and does not involve the
manufacturer responsibility):
Intervention| Name of the commissioning engineer| Applicable
national regulations| Verification organism
---|---|---|---
Date| Nature (1)
| | | |
| | | |
| | | |
(1) Maintenance, repairs, regular verifications (See EN 378), leakage, etc.
Engineers working on the electric or refrigeration components must be
authorized, trained and fully qualified to do so. All refrigerant circuit
repairs must be carried out by a trained person, fully qualified to work on
these units.
He must have been trained and be familiar with the equipment and the
installation.
All welding operations must be carried out by qualified specialists.
The insulation must be removed and heat generation must be limited by using a
wet cloth.
Any manipulation (opening or closing) of a shut-off valve must be carried out
by a qualified and authorized engineer. These procedures must be carried out
with the unit shut-down. Never work on any of the electrical components, until
all the power supplies have been isolated using the disconnect switch(is) in
the control box(is), locked and tagged out.
Do not access the electrical components if water and/or moisture are present.
If any maintenance operations are carried out on the unit, lock the power
supply circuit in the open position ahead of the machine.
If the work is interrupted, always ensure that all circuits are still
deenergized before resuming the work.
ATTENTION: Even if the unit has been switched off, the power circuit
remains energized, unless the unit or circuit disconnect switch is open.
For example the variable frequency drives (VFD) which take twenty (20) minutes
to discharge. Refer to the wiring diagram for further details.
IMPORTANT INFORMATION REGARDING THE REFRIGERANT USED:
This product may contain fluorinated greenhouse gas covered by the Kyoto
protocol. For the fluid type refer to the name plate.
- Any intervention on the refrigerant circuit of this product should be performed in accordance with the applicable legislation. The regulation is called F-Gas, N°517/2014.
- Ensure that the refrigerant is never released to the atmosphere during installation, maintenance or equipment disposal.
- The deliberate gas release into the atmosphere is not allowed.
- If a refrigerant leak is detected, ensure that it is stopped and repaired as quickly as possible.
- Only a qualified and certified personnel can perform installation operations, maintenance, refrigerant circuit leak test as well as the equipment disposal and the refrigerant recovering.
- The gas recovery for recycling, regeneration or destruction is at customer charge.
- Periodic leak tests have to be carried out by the customer or by third parties. The regulation set the periodicity here after:
System WITHOUT leakage detection| No Check| 12 Months| 6 Months| 3 Months
---|---|---|---|---
System WITH leakage detection| No Check| 24 Months| 12 Months| 6 Months
Refrigerant charge/ circuit (CO 2 equivalent)| < 5 Tons| 5 ≤ Charge < 50 Tons| 50 ≤ Charge < 500 Tons| Charge > 500 Tons (1)
Refrigerant charge/ Circuit (kg)| R32 (2) (GWP 675, following AR4)| Charge < 7,4 kg| 7,4 ≤ Charge < 7,4 kg| 74,1 ≤ Charge < 740,8 kg| Charge > 740,8 kg
R134A (2) (GWP 1430, following AR4)| Charge < 3,5 kg| 3,5 ≤ Charge < 34,9 kg| 34,9 ≤ Charge < 349,7 kg| Charge > 349,7 kg
R407C (2) (GWP 1774, following AR4)| Charge < 2,8 kg| 2,8 ≤ Charge < 28,2 kg| 28,2 ≤ Charge < 281,9 kg| Charge > 281,9 kg
R410A (2) (GWP 2088, following AR4)| Charge < 2,4 kg| 2,4 ≤ Charge < 23,9 kg| 23,9 ≤ Charge < 239,5 kg| Charge > 239,5 kg
R515B (2) (GWP 293, following AR4)| Charge < 17,1 kg| 17,1 ≤ Charge < 170,6 kg| 170,6 ≤ Charge < 1706,5 kg| Charge > 1706,5 kg
HFO’s: R1234ze| ****
No requirement
(A2L refrigerant and GWP<1,
following AR5)
(1) From 01/01/2017, units must be equipped with a leakage detection system.
(2) Fluorinated greenhouse gas covered by the Kyoto protocol and the F-gas
N°517/2014
- A logbook must be established for equipment subject to periodic leak tests. It should contain the quantity and the type of fluid present within the installation (added and recovered), the quantity of recycled fluid, regenerated or destroyed, the date and output of the leak test, the designation of the operator and its belonging company, etc.
- Contact your local dealer or installer if you have any questions.
If a leak occurs or if the refrigerant becomes contaminated (e.g. by a short circuit in a motor) remove the complete charge using a recovery unit and store the refrigerant in mobile certified containers.
Repair the leak detected and recharge the circuit with the total refrigerant charge, as indicated on the unit name plate. Some parts of the circuit can be isolated. Only charge liquid refrigerant at the liquid line.
Ensure that you are using the correct refrigerant type before recharging the unit.
Charging any refrigerant other than the original charge type will impair machine operation and can even lead to a destruction of the compressors. The compressors are lubricated with a synthetic polyolester oil.
Periodic inspections of the safety devices and external overpressure devices (external relief valves) must be carried out in accordance with national regulations.
The safety device shall be tested at least once a year to verify good operation and cut out value.
The company or organization that conducts a pressure switch test shall establish and implement a detailed procedure to fix:
– Safety measures
– Measuring equipment calibration
– Validating operation of protective devices
– Test protocols
– Recommissioning of the equipment.
CAUTION: If the test leads to replacing the pressure switch, it is necessary
to recover the refrigerant charge, these pressure switches are not installed
on automatic valves (Schrader type).
At least once a year thoroughly inspect the protection devices (valves). If
the machine operates in a corrosive environment, inspect the protection
devices more frequently.
Ensure regularly that the vibration levels remain acceptable and close to
those at the initial unit start-up.
Before opening a refrigerant circuit, purge, consult the pressure gauges and
ensure that the circuit has been purged Change the refrigerant when there are
equipment failures, carry out a refrigerant analysis in a specialist
laboratory.
If the refrigerant circuit remains open for longer than a day after an
intervention (such as a component replacement), the openings must be plugged
and the circuit must be charged with oxygen free nitrogen (inertia principle).
The objective is to prevent penetration of atmospheric humidity and the
resulting corrosion on the internal walls and on non-protected steel surfaces.
If work on the evaporator is required, ensure that the piping from the
compressor is no longer pressurized (as the valve is not leak tight in the
compressor direction.)
Any refrigerant transfer and recovery operations must be carried out using a
transfer unit. A 3/8” SAE connector on the manual liquid line valve is
supplied with all units for connection to the transfer station. The units must
never be modified to add refrigerant and oil charging, removal and purging
devices. All these devices are provided with the units. Please refer to the
installation, operation and maintenance manual of the unit.
Do not re-use disposable (non-returnable) cylinders or attempt to refill them.
It is dangerous and illegal. When cylinders are empty, evacuate the remaining
gas pressure, and move the cylinders to a place designated for their recovery.
Do not incinerate.
Do not use oxygen to purge lines or to pressurize a machine for any purpose.
Oxygen gas reacts violently with oil, grease, and other common substances.
Never exceed the specified maximum operating pressures.
Verify the allowable maximum high-side and low-side test pressures by checking
the instructions in this manual and the pressures given on the unit name
plate.
Do not use air for leak testing. Use only oxygen free nitrogen.
Do not unwed or flame cut the refrigerant lines or any refrigerant circuit
component until all refrigerant (liquid and vapor) has been removed from
chiller. Traces of vapor should be displaced with oxygen free nitrogen.
Refrigerant in contact with an open flame produces toxic gases.
The necessary protection equipment must be available, and appropriate fire
extinguishers for the system and the refrigerant type used must be within easy
reach.
Do not clean the unit with hot water or steam. This may cause the refrigerant
pressure to rise.
HIGH PRESSURE SAFETY LOOP (SRMCR):
Each circuits of the unit is equipped with a high pressure safety loop, also
known as safety related measurement control and regulation system (SRMCR),
consisting of:
– High pressure switches (HPS) located on the high pressure side of
compressor. PZHH (manual) or PSH (automatic) type, depending on the compressor
technology
– A control relay on the compressor board.
– Compressor(s) main contactor(s)
See the wiring diagram and bill of material of the unit for details of
identification and references.
This safety loop is designed to be reliable for the whole life of the chiller
providing adequate annual testing is performed or tests in accordance with
national regulations, at the earliest opportunity.
FUNCTION DESCRIPTION AND RESET:
Switches and compressor contactors are closed during normal operation. A
pressure above the set value opens the switch(es) which open the compressor(s)
contactor(s) stopping the power supply to compressors.
Shortly after compressor shutdown, the pressure in the system comes back to
equilibrium.
Restart after high pressure detection.
After safety loop activation:
– reset manually the triggered pressure switch (screw type compressors only).
– Clear the alarm on the unit control panel. This has to be done physically on
the panel, not remotely.
CHECKS IN CASE OF APPARENT FAILURE OF THE SAFETY ACCESSORY:
If the maximum allowable pressure of the unit appears to have been exceeded
(for example: after opening of the relief valves), the unit must be stopped
immediately. The unit and the safety loop must pass periodic testing procedure
successfully before any possible restart.
If the test reveals any malfunctions that could have led to exceed the maximum
allowable pressure (PS) of the device, a complete check of all pressure
equipment must be performed to verify their mechanical integrity.
In order to verify the full integrity of the safety loop, the following checks
have to be performed periodically:
– High pressure safety loop periodic test
– Contactors check
– Complete loop operation check
POWER CONTACTOR CHECK PROCEDURE:
This procedure shall be applied for each compressor of the unit.
-
Switch off the power of the electrical equipment.
-
Measure the resistance between upstream and downstream terminals of the main power contactors for each phase.
Note: calibrated Ohmmeter shall be used for this task. -
Confirm resistance is more than 1.0 MOhm.
A resistance lower than 1.0 MOhm might indicate that contactor is defective: further investigations are required.
COMPLETE SAFETY LOOP TEST:
The purpose of this periodic test is to verify the proper functioning and
setting of the high-pressure safety loop of a refrigerant circuit. In order to
reach the triggering pressure of the loop, the pressure and temperature
thresholds activating the discharge of the compressor by the regulation
system are raised.
This procedure must be repeated for each circuit of the unit:
-
Set up a calibrated pressure gauge on the high pressure part of the circuit (compressor discharge)
-
Clear all activated alarms
-
Activate the HP test mode for the corresponding circuit via the control interface.
Enable Quick Test Mode (Quick Test Menu> [ QCK_TEST ] parameter active )
Activate the high pressure test for the desired circuit (Menu Quick Test> parameter [HP_TEST] to 0 for circuit A or 1 for the B circuit.
The corresponding circuit starts to perform the HP test. -
Start the unit
-
For water-cooled units, stop the circulation of the secondary circuit to the condenser in order to stop the condensation and cause the increase in pressure (this operation is managed by the control on air-cooled machines)
-
Record the trigger value
-
Check if the trigger values are correct
The release values should be between -1.5 /+0 bars of nominal values indicated on the unit. -
Reset all alarms
For screw type compressors, this procedure should be repeated if only one of the pressure switch has triggered. The triggered pressure switch shall then be substituted with a mean of stopping the system or a pressure switch with a higher triggering value.
Note:
Access to the maintenance functions can be protected by a password. Contact your dealer or the manufacturer’s service department for more information.
The type of connector must be WAGO 231-302 or equivalent.
Final shutdown safety considerations
Separate the units from their energy sources, allow them cool then drain them
completely
DISASSEMBLY
Comply with local environmental laws and guidelines.
Never work on a unit that is still energized.
At the end of its life, the unit must be disassembled, and contaminated fluids
removed by professionals and processed via approved channels for waste
electrical and electronic equipment. Check whether any part of the unit can be
recycled for another purpose.
Refrigerant and oil must be removed from the machine, then recycled in
suitable industries before dismantling operations Only a qualified and
certified personnel can remove the refrigerant from the equipment Use the
original lifting equipment.
APPENDICES (PROVIDED WITH THE UNIT)
- Appendix 1: Declaration of conformity
- Appendix 2: Dimensional drawings
The quality management system of this product’s assembly site has been certified in accordance with the requirements of the ISO 9001 standard (latest current version) after an assessment conducted by an authorized independent third party. The environmental management system of this product’s assembly site has been certified in accordance with the requirements of the ISO 14001 standard (latest current version) after an assessment conducted by an authorized independent third party. The occupational health and safety management system of this product’s assembly site has been certified in accordance with the requirements of the ISO 45001 standard (latest current version) after an assessment conducted by an authorized independent third party. Please contact your sales representative for more information.
Order No.: 10825, 04.2024. Supersedes order No.: New.
Manufacturer reserves the right to change any product specifications without
notice.
Manufacturer by: Carrier SCS, Montel, France.