MERIDIAN General Smart Locker Installation Guide

June 1, 2024
MERIDIAN

MERIDIAN-LOGO

MERIDIAN General Smart Locker

MERIDIAN-General-Smart-Locker-PRODUCT-IMAGE

Specifications

  • Manufacturer: Meridian
  • Year Established: 1999
  • Headquarters: North Carolina
  • Certifications: ISO 9001:2008, UL
  • Product Type: Smart Locker System

Product Information

  • Meridian is a leading self-service industry pioneer specializing in innovative and precise smart locker systems. With in-house production capabilities spanning design, engineering, fabrication, assembly, deployment, and support, Meridian offers American-made interactive solutions globally.
  • The smart lockers are designed for practicality, engineered brilliantly, and built flawlessly. Meridian ensures ADA compliance and high-quality standards in all aspects of production.

Product Usage Instructions

General Locker Installation
To install the smart locker system, follow these steps:

  1. Determine mounting hole locations based on the number of locker cabinets in your assembly.
  2. Attach side mounting strips on either side of the cabinet and along the rear for setups larger than 1 cabinet.
  3. Refer to Figures 1.1 – 1.4 in the manual for exact measurements and mounting locations.

Kiosk Installation
For kiosk installation, ensure proper placement and secure mounting to provide seamless integration with the smart locker system.

Frequently Asked Questions (FAQ)

  • Q: Does Meridian offer technical support for the smart locker system?
    A: Yes, Meridian provides comprehensive technical support for installation, operation, and maintenance of the smart locker system. Contact their customer support team for assistance.

  • Q: Are the smart lockers customizable?
    A: Meridian offers customization options to tailor the smart locker system to specific requirements. Contact them for more information on customization services.

  • Q: What maintenance is required for the smart locker system?
    A: Regular maintenance includes cleaning, inspection of locking mechanisms, and software updates. Refer to the user manual for detailed maintenance instructions.

General Smart Locker Installation

Total In-House Production

MERIDIAN-General-Smart-Locker- \(3\) MERIDIAN-
General-Smart-Locker- \(5\)

Designed Practically, Engineered Brilliantly, Built Flawlessly.

From Concept  To Completion

  • Meridian is a self-service industry pioneer, leading in innovation and precision since being founded in 1999. A fully integrated manufacturer, Meridian designs, engineers, fabricates, assembles, deploys and supports self-service solutions from our 13-acre headquarters in North Carolina.
  • Meridian is an ISO 9001:2008 certified company and UL self-certify facility. With processes from software development to powder coating and quality control, all being completed in house, Meridian proudly offers American-made interactive solutions to a global marketplace.

MERIDIAN-General-Smart-Locker- \(7\)

General Locker Installation

Kiosk Installation:
Use the following details to determine your mounting hole location depending on how many locker cabinets your assembly includes. Each of these details provide exact measurements for any and all mounting locations needed. The side mounting strips shown are attached on either side of the cabinet and along the rear for any setup larger than 1 cabinet. (Fig. 1.1 – 1.4)

MERIDIAN-General-Smart-Locker- \(8\) MERIDIAN-
General-Smart-Locker- \(9\)

Once the cabinet(s) are lagged down into position, power will need to be plugged up and data cables run. The main power is located in the main components cabinet and is simply plug and play. (connect power after all other cables have been installed) The data cables and power cables running to the secondary cabinet will do so through the top of the kiosk cabinet. The cables will already be plugged into the lower side of the second (lower) daughter board on the main cabinet and run up for easy installation. (Fig 2.1) Data will be provided by a standard Cat5 cable and power will come from the three wire power cord. (Shown with the green connector) These cables will plug into the bottom side of the top daughter board on each additional cabinet as shown. (Fig 2.2) With power and data cables installed you can now plug in the main power for the locker assembly.

Canopy Installation:
Now that the assembly has power and data ran to each cabinet the top cover and canopy can be installed. Each cabinet has its own top cover which the main canopy mounts to using (Qty 8) ¼-20 x ¾” Grade 8 Hex bolts. (Fig 3.1 and 3.2) With the canopy secured in place, the top plates can then be screwed into place using the (Qty 20) 10/32 screws provided.

Corporate Headquarters 312 S Pine Street Aberdeen, NC 28315

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

MERIDIAN User Manuals

Related Manuals