Miele PDR 918 SI Professional Vented Dryer Installation Guide

June 1, 2024
Miele

Miele PDR 918 SI Professional Vented Dryer

Installation notes

Installation requirements

  • Risk of injury or damage to property due to improper installation. Incorrect installation of the tumble dryer can lead to personal injury or damage to property. It is recommended that installation and commissioning be accomplished by Miele Service or an authorized dealer.
  • The tumble dryer must be installed in accordance with all relevant regulations and standards. Observe all local codes.
  • The dryer must only be operated in a room that has sufficient ventilation and which is frost-free.
  • The tumble dryer must not be installed behind a closeable door or a sliding door. The maximum opening angle of the tumble dryer door must not be limited by objects or doors. It must be possible to fully open the tumble dryer door at any time.

Steam connection
The steam connection must only be carried out by a registered installation technician. The information from the data plate, the wiring diagram, and the documentation accompanying the machine must be noted and complied with when connecting steam-heated Miele machines.

Condensate connection
The condensate separator must be installed such that when the system is not operating, the heater bank is completely emptied. This means that no condensate may remain in the heater bank. The installation of an inverted bucket condensate trap is recommended.

Floor anchoring
Miele generally recommends securing both of the tumble dryer’s front screw feet to the floor with tensioning strips.

In the following cases, the tumble dryer must be secured to the floor with tensioning strips:

  • when installing on a base
  • on an offshore installation

Supply air/exhaust air
The tumble dryer may only be operated when the ducting has been connected properly and the room is sufficiently ventilated.

Optional accessories
Only use genuine Miele spare parts and accessories with this machine. Using parts or accessories from other manufacturers may void the warranty, and Miele cannot accept liability.

Communication box
The optional communication box allows external hardware from Miele and other suppliers to be connected to the Miele Professional machine. External hardware includes e.g., peakload systems, pressure sensors, or an external vent flap. The communication box is supplied with voltage by the Miele Professional machine. The separately available set consists of the communication box and fasteners for installation on the machine or on the wall.

XKM 3200 WL PLT
The optional Miele communication module can be used to establish a data connection between a Miele Professional machine and a data processor in accordance with the Ethernet or WiFi standard. This communication module fits into the communication slot which is a standard feature on all machines. The communication module offers the option of intelligent app-based communication with external systems. In addition, it can display detailed machine and program status information. This module forms the basis for wired communication with Miele MOVE. It is not possible to integrate the machine into the “Miele@home” app for domestic installations.

The communication module is intended exclusively for commercial use and is supplied with voltage directly via the Miele Professional machine. No additional power connection is required. The Ethernet interface provided via the communication module complies with SELV (safety extra low voltage) requirements in accordance with EN 60950. Connected external machines must also comply with SELV.

Base
The tumble dryer can be installed on a base (open or box base, available as an optional Miele accessory). Elevating the tumble dryer gives a better ergonomic working position when loading or unloading.

  • Risk of injury and damage due to missing fastenings.
  • When installing on a base, an unsecured tumble dryer can slip and fall off the base.
  • If the tumble dryer is installed on an existing on-site base, it must be secured.
  • The base must be secured to the floor.

Supply air, exhaust, and ventilation cross-sections

Supply air/exhaust air
The tumble dryer may only be operated when the ducting has been connected properly and the room is sufficiently ventilated.

Calculating the total length and diameter of a supply-air or exhaust pipe

The length of the required ductwork and the number and shape of the elbows are determined by the structural conditions on-site. In order to maximize the airflow efficiency, the pipeline should be as short as possible and contain few or minimal elbows.

  • The exhaust ducting must not be made from flammable materials.
  • Otherwise there is a risk of fire.
  • Use only non-flammable materials for the exhaust ducting. All local regulations for metallic ducting must be observed. Plastic must not be used for ventilation.
  • In upward exhaust ducting systems, a condensate drain must be fitted to the bottom. The condensate must be drained via a water collection tray or a floor drain positioned in an appropriate location.
  • If air is being directed from multiple appliances into a combined line (exceptional circumstances), a non-return device (non-return flap) must be installed in each separate line to prevent backflow.
  • To make subsequent cleaning of the pipes easier, cleaning flaps should be fitted to elbows wherever possible.
  • The on-site exhaust ducting and venting to the outdoors must be regularly checked for lint deposits and cleaned if necessary.

Substitute duct lengths

Miele PDR 918 SI Professional Vented Dryer 1

Table 1

Maximum permissible total ducting length

Internal minimum pipe diameter

(metal ducting)

| PDR x18 SI| PDR x22 SI| PDR x28 SI| PDR x44 SI
---|---|---|---|---
5 7/8″ (150 mm)| 49′ 2 9/16″ (15 m)| 39′ 4 7/16″ (12 m)| 32′ 9 11/16″ (10 m)| 32′ 9 11/16″ (10 m)
7 1/16″ (180 mm)| 124′ 8 1/16″ (38 m)| 101′ 8 1/2″ (31 m)| 88′ 7″ (27 m)| 78′ 8 7/8″ (24 m)
7 7/8″ (200 mm)| 213′ 3 1/16″ (65 m)| 173′ 10 5/8″ (53 m)| 157′ 5 3/4″ (48 m)| 130′ (40 m)
Permissible counter pressure in the exhaust ducting| 0.03 psi (200 Pa)| 0.04 psi (310 Pa)| 0.07 psi (510 Pa)| 0.06 psi (390 Pa)

Table 2

When connected to the vent ducting through the exhaust duct of a machine, particular care must be taken to make sure the connection is secure and air- tight. With complex ducting with many bends and additional components, or when several different machines are connected to a shared duct, it is recommended that a detailed pipework calculation is carried out by a qualified specialist. The vent ducting must not be channeled into a chimney or flue already in use for any gas-, coal-, or oil-burning installation. The warm and moist exhaust air is to be conducted outside or to a suitable venting duct over the shortest path possible. The vent ducting must be laid so that air flow is not hindered. To achieve this, use as few bends as possible along with short pipelines and well-made connections and transitions checked for air-tightness. No filters or grilles may be fitted in the vent ducting. The end of the vent ducting leading out into the open should be protected against the elements, e.g., with a downward-facing 90° bend.

  • During tumble dryer operation, the room must be adequately ventilated.
  • Room ventilation opening for air intake from the setup room
  • The minimum dimension of the ventilation opening depends on the cross-section of the vent duct.
Vent duct Minimum dimension for ventilation opening
6″ (150 mm)

(177 cm²)

| 82 5/16″²

(531 cm²)

| 10 1/4″

(260 mm)

| 9 1/16″

(230 mm)

–| 6″

(150 mm)

| 34 7/8″²

(225 cm²)

| 104 5/8″²

(675 cm²)

| 11 5/8″

(295 mm)

| 10 1/4″

(260 mm)

7 1/16″ (180 mm)| –| 39 3/8″²

(254 cm²)

| 118 1/8″²

(762 cm²)

| 12 3/8″

(315 mm)

| 11″

(280 mm)

–| 7 1/16″

(180 mm)

| 50 1/4″²

(324 cm²)

| 150 11/16″²

(972 cm²)

| 14″

(355 mm)

| 12 3/8″

(315 mm)

7 7/8″ (200 mm)| –| 48 11/16″²

(314 cm²)

| 146″²

(942 cm²)

| 13 3/4″

(350 mm)

| 12 3/16″

(310 mm)

–| 7 7/8″

(200 mm)

| 62″²

(400 cm²)

| 186″² (1,200 cm²)| 15 9/16″

(395 mm)

| 13 3/4″

(350 mm)

8 11/16″ (220 mm)| –| 58 7/8″²

(380 cm²)

| 176 11/16″²

(1,140 cm²)

| 15″

(381 mm)

| 14 13/16″

(377 mm)

–| 8 11/16″

(220 mm)

| 75″²

(484 cm²)

| 225 1/16″²

(1,452 cm²)

| 16 15/16″

(430 mm)

| 15 1/16″

(382 mm)

9 13/16″ (250 mm)| –| 76 1/8″²

(491 cm²)

| 228 5/16″²

(1,473 cm²)

| 17 1/8″

(435 mm)

| 15 3/16″

(385 mm)

–| 9 13/16″

(250 mm)

| 96 7/8″²

(625 cm²)

| 290 5/8″²

(1,875 cm²)

| 19 5/16″

(490 mm)

| 17 1/8″

(435 mm)

11 3/16″ (300 mm)| –| 109 9/16″²

(707 cm²)

| 328 3/4″²

(2,121 cm²)

| 20 1/2″

(520 mm)

| 18 1/8″

(460 mm)

–| 11 3/16″

(300 mm)

| 139 1/2″²

(900 cm²)

| 418 1/2″²

(2,700 cm²)

| 23 1/4″

(590 mm)

| 20 1/2″

(520 mm)

Table 3

Exhaust connection

Example 1
Configuring vent ducting made from steel piping for the PDR 914/514 tumble dryers:

  • L1, L2: each 9′ 10″ (3 m) steel piping
  • B1, B2: each 90° concertina pipe elbow (r = 2d)
  • B3: 90° elbow (r = d)

Miele PDR 918 SI Professional Vented Dryer 3

  1. Total duct length
    • Steel pipe L1 = 9′ 10″ (3.0 m)
    • Steel pipe L2 = 9′ 10″ (3.0 m)
    • 90° concertina pipe elbow (r = 2d) B1 = 10′ 6″ (3.2 m)*
    • 90° concertina pipe elbow (r = 2d) B2 = 10′ 6″ (3.2 m)*
    • 90° elbow (r = d) B3 = 6′ 3″ (1.9 m*)
    • Total duct length 46′ 11″ (14.3 m)
  2. Duct diameter depending on total pipe length
    For the calculated total pipe length of 46′ 11″ (14.3 m) for a PDR 914/514, a minimum duct diameter of 6″ (150 mm) is specified for the exhaust ducting according to Table 2.

Example 2
Common combined exhaust ducting for multiple appliances should only be considered as a solution in exceptional cases. Configuring combined exhaust ducting made from steel for the PDR 914/514 and PDR 918/518 series tumble dryers:

  • L1–L4 each 6′ 6″ (2 m) steel piping
  • B1–B3 each 90° concertina pipe elbow (r = 2d)
  • B4 45° elbow (r = 2d)
  • B5 90° elbow (r = d)

If the exhaust from multiple appliances is to be ducted into a combined line, a non-return device must be installed in each separate line to prevent backflow.

Miele PDR 918 SI Professional Vented Dryer 4

  1. Total pipe length PDR 914/514

    • Steel pipe L1 = 6′ 6″ (2.0 m)
    • Steel pipe L2 = 6′ 6″ (2.0 m)
    • Steel pipe L4 = 6′ 6″ (2.0 m)
    • 90° concertina pipe elbow (r = 2d) B1 = 10′ 6″ (3.2 m)*
    • 90° concertina pipe elbow (r = 2d) B2 = 10′ 6″ (3.2 m)*
    • 90° elbow (r = d) B5 = 6′ 3″ (1.9 m*)
    • Total duct length 46′ 11″ (14.3 m)
  2. Pipe diameter depending on total pipe length
    Total pipe length = 46′ 11″ (14.3 m)
    Maximum permissible total pipe length 62′ 4″ (19 m) = Ø 6″ (150 mm) internal pipe diameter (see Table 2)

  3. Total pipe length PDR 918/518

    • Steel pipe L3 = 6′ 6″ (2.0 m)
    • Steel pipe L4 = 6′ 6″ (2.0 m)
    • 90° concertina pipe elbow (r = 2d) B3 = 10′ 6″ (3.2 m)*
    • 45° elbow (r = 2d) B4 = 2′ 3″ (0.7 m)*
    • 90° elbow (r = d) B5 = 6′ 2″ (1.9 m)*
    • Total duct length 32′ 1 13/16″ (9.8 m)
  4. Pipe diameter depending on total pipe length

    • Total pipe length = 32′ 1 13/16″ (9.8 m) (PDR 918/518)
    • Maximum permissible total pipe length 49′ 2″ (15 m) = Ø 6″ (150 mm) internal pipe diameter (see Table 2)
  5. Total duct diameter

    • According to Table 3
    • Duct diameter PDR 914/514 Ø 6″ (150 mm) = 27 3/8″² (177 cm²)
    • Duct diameter PDR 918/518 Ø 6″ (150 mm) = 27 3/8″² (177 cm²)
    • Total cross section A = 54 13/16″² (354 cm²)
    • Total duct diameter = Ø 8 11/16″ (220 mm)

Example 3
Configuring exhaust ducting and a supply pipe made from steel for the PDR 914/514 series tumble dryer:

  • L1, L2: each 6′ 6″ (2.0 m) steel piping
  • L3: 8′ 2″ (2.5 m) steel piping
  • B1, B2: 90° concertina pipe elbow for each
  • B3, B4: 90° elbow (r = d) for each
  1. Total duct length
    • Steel pipe L1 = 6′ 6″ (2.0 m)
    • Steel pipe L2 = 6′ 6″ (2.0 m)
    • Steel pipe L3 = 8’2″ (2.5 m)
    • 90° concertina pipe elbow B1 = 10′ 6″ (3.2 m)*
    • 90° concertina pipe elbow B2 = 10′ 6″ (3.2 m)*
    • 90° elbow (r = d) B3 = 6′ 3″ (1.9 m*)
    • 90° elbow (r = d) B4 = 6′ 3″ (1.9 m*)
    • Total duct length 54′ 9 1/2″ (16.7 m)
  2. Pipe diameter depending on total pipe length
    For the calculated total pipe length of 54′ 9″ (16.7 m) for a PDR 914/514, a minimum pipe diameter of 6″ (150 mm) is specified for the exhaust ducting and supply pipe according to Table 2.

Configuring the room ventilation opening

  • Rooms in which rotary irons and tumble dryers are operated must have an induced ventilation system (e.g., ventilation slots in windows and doors, wall openings with grilles, or opened windows or skylights).

  • For example 1
    A duct diameter of 6″ (150 mm) was specified in example 1. According to this duct diameter, a room ventilation opening with a size of 17′ 5″ (531 cm) is required. The edge length is 9 1/16″ (230 mm) (see Table 3).

  • For example 2
    A total duct diameter of 8 11/16″ (220 mm) was specified. According to this duct diameter, a room ventilation opening with a size of 37′ 4″ (1,140 cm) is required. The edge length is 14 13/16″ (377 mm) (see Table 3).

  • For example 3
    Since in this case the tumble dryer is connected to a central air supply, additional ventilation openings are not needed.

Dimensions

Miele PDR 918 SI Professional Vented Dryer 6

Miele PDR 918 SI Professional Vented Dryer 7

Installation

Miele PDR 918 SI Professional Vented Dryer 8

  1. Electrical connection

  2. Connection for equipotential bonding

  3. Exhaust duct

  4. Condensate connection

  5. Steam connection

  6. Steam valve connection

  7. Connection for communication module

  8. Connection for communication box

  9. Communication box (optional)
    For setting up a connection with external systems

  10. Steam valve

Floor anchoring

Miele PDR 918 SI Professional Vented Dryer 9

Drill hole/anchor point.

Possible voltage options

208/240 V 60 Hz 2 Ph

  • Power source 208/240 V 60 Hz 2 Ph
  • Total amps 5 A
  • Maximum fuse rating (time-delay fuse) 15 A
  • Minimum current 6.3 A

Exhaust air

  • Airflow rate 550 m³/h
  • Maximum permitted pressure loss 0.03 psi (200 Pa)
  • Maximum exhaust air temperature 175°F (80°C)
  • Maximum evaporation rate 35 lb/h (15.9 kg/h)
  • Exhaust air connector on machine side 6″ (DN 150)
    As relative humidity inside the exhaust ducting can be as high as 100%, suitable measures must be taken to prevent a backflow of condensate into the machine.

Supply air

Standard connection: air intake from installation site

  • Recommended free air intake cross-section into the room: (equivalent to 3 times the exhaust air cross-section of a machine). 118 sq. in. (763 cm²)
  • There must be sufficient air intake to the installation site to match the air outlet volume.
  • Alternative connection: air intake connection directly from outdoors
  • Connection sleeve on machine side (internal diameter) 6 5/16″ (161 mm)
  • Connection pipe provided on site (external diameter) 6 5/16″ (160 mm)
  • Removing the protective cover exposes live parts. For safety reasons, a pipe must be installed from the tumble dryer’s central fresh air intake (over a minimum length of 35 7/16″ (900 mm)) and secured with 2 screws.

Steam connection

  • Design pressure on high-pressure side 87–145 psi (0.6–1 MPa)
  • Boiling point 329-363°F (165–184°C)
  • Mass flow, peak capacity 28 kW
  • On-site threaded union for steam (internal thread) ½”
  • Length of steam valve connection cable 19 11/16″ (500 mm)

Steam valve, dirt filter, and steam shut-off valve must be installed by the customer on site. The steam valve must be installed in the direct vicinity of the steam connection.

Condensate connection

  • On-site threaded union (internal thread) ½”
  • Shut-off equipment and condensate trap must be installed by the customer on site.

Equipotential bonding

  • Connection with male thread 10 × 35 mm
  • Washers and nuts M10
    Accessories for equipotential bonding are not supplied and need to be ordered separately.

APDR 002 communication box (optional accessory)

  • Electrical connection ~ 200–240 V, 50/60 Hz
  • Net height 9 9/16″ (243 mm)
  • Net width 11 3/4″ (298 mm)
  • Net depth 3 3/4″ (96 mm)
  • Gross height (including packaging) 5 11/16″ (145 mm)
  • Gross width (including packaging) 11 1/2″ (292 mm)
  • Gross depth (including packaging) 23 7/16″ (595 mm)
  • Net weight 7.5 lb (3.4 kg)
  • Gross weight (including packaging) 8.274 lb (3.75 kg)

Machine data

  • Machine width, total 35 11/16″ (906 mm)
  • Machine height, total 55 1/8″ (1,400 mm)
  • Machine depth, total 40 3/4″ (1,035 mm)
  • Niche width 49 3/16″ (1,250 mm)
  • Minimum wall spacing (up to the back edge of the lid) 19 11/16″ (500 mm)
  • Packaging width 42 15/16″ (1,090 mm)
  • Packaging height 60 1/16″ (1,526 mm)
  • Packaging depth 44 5/16″ (1,125 mm)
  • Maximum gross volume 494 gal (1,871.3 L)
  • Maximum gross weight 543 lb (246.3 kg)
  • Maximum net weight 513 lb (232.5 kg)
  • Maximum floor load in operation 2,546 N
  • Diameter of exhaust duct 5 7/8″ (150 mm)
  • Drum diameter 33 7/16″ (850 mm)
  • Diameter of drum opening 20 1/2″ (520 mm)
  • Drum depth 24 1/8″ (613 mm)
  • Drum volume 86 gal (325 L)
  • Door opening diameter 20 1/2″ (520 mm)
  • Maximum door opening angle 180°
  • Emission sound pressure level 50 dB(A) re 20 μPa
  • Sound power level 61 dB(A)
  • Average heat dissipation rate into the room 4.5 MJ/h
  • Permissible ambient temperature range during use 36-104°F (2–40°C)

Closed base, APDR 004 (optional accessory)

  • Net height 5″ (127 mm)
  • Net width 34 5/8″ (880 mm)
  • Net depth 34″ (864 mm)
  • Gross height (including packaging) 5 7/8″ (150 mm)
  • Gross width (including packaging) 35 7/16″ (900 mm)
  • Gross depth (including packaging) 35 7/16″ (900 mm)
  • Net weight 55 lb (25 kg)
  • Gross weight (including packaging) 62 lb (28 kg)

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals