BEFORE YOU BEGIN
Read these instructions completely and carefully.
WARNING/ADVERTISSEMENT
RISK OF ELECTRIC SHOCK
-
Turn the power off before inspection, installation, or removal.
-
Properly ground electrical enclosure.
RISK OF FIRE -
Follow all NEC and local codes.
-
Use only UL or IEC approved wire for input/output connections.
Minimum size 18 AWG.
Save These Instructions
Use only in the manner intended by the manufacturer. If you have any
questions, contact the manufacturer.
Prepare Electrical Wiring
Electrical Requirements
The LED driver must be supplied with 120-277 VAC, 50/60 Hz, and connected to an individual properly grounded branch circuit, protected by a circuit breaker. Use min. 75 C supply conductor.
Electrical Requirements
The grounding and bonding of the overall system shall be done in accordance with the National Electric Code (NEC) Article 600 and local codes
This device complies with Part 15 of the FCC Rules. Operation is subject to
the following two conditions: (1) This device may not cause harmful
interference, and (2) this device must accept any interference received,
including interference that may cause undesired operation. CAN ICES-005 (A) /
NMB-005 (A)
Note: This equipment has been tested and found to comply with the limits
for a Class A digital device, pursuant to part 15 of the FCC Rules. These
limits are designed to provide reasonable protection against harmful
interference when the equipment is operated in a commercial environment. This
equipment generates, uses, and can radiate radio frequency energy and, if not
installed and used in accordance with the instruction manual, may cause
harmful interference to radio communications. Operation of this
Unit Installation
-
Carefully unpack the unit and properly inspect for defects before installing. Wear work gloves to prevent dirt and oil from being transferred to the luminaire.
-
Choose a mounting method: chain, cable, rod, or surface mount.
NOTE: Please follow all UL, NEC, and minimum load rating guidelines when selecting and installing a cable, chain, or rod. -
The mounting brackets come pre-installed. Loosen the screws to move the brackets to the desired location, then re-tighten. Each mounting bracket can connect to a chain, cable, rod, or be surface mounted.
ALC6
Size| 120-277V| 347-480V
4ft Fixture| 7.5 lbs| 10.5 lbs
8ft Fixture| 15.4 lbs| 17.5 lbs
Chain or Cable Mounting
Hang two chains/cables from a structural member of the ceiling. Fixture must be supported independently of an outlet box. Loop chain/cable through the two mounting brackets.
Rod Mounting
Secure two 1/2” threaded rods into structural members in the ceiling. Place a nut on each threaded rod where the fixture should hang. Slide mounting brackets onto threaded rods and tighten the second nut onto the rods to secure the fixture.
Surface Mounting
A Position the two mounting brackets at the ends of the fixture and
tighten them. Attach the fixture to the ceiling using appropriate hardware
(not supplied).
B Loosen the end cap screw and swing open the end cap to remove. Repeat
for both end caps.
C Loosen screws on side of the fixture and unhinge LED lightbar.
D Remove the LED lightbar by disconnecting the provided quick-connectors.
E Run power through one of the 0.875” holes in the top of the fixture and
into a junction box. Connect AC wires from the junction box to fixture wires
(see Step 4 under Electrical Connections for details).
F Reattach the lightbar to the fixture and tighten the screws. Reattach both end caps and tighten screws.
Electrical Connections
Note: Please see additional wiring instructions if installing multiple fixtures in a Continuous Run.
A Loosen end cap screw and swing open the end cap to remove it.
B Option: power input from top – A) Install 1/2” conduit or B) install AC
power cord with strain relief through .875” hole on top of fixture
C Option: power input from side – Remove knockout in endcap and A)
install 1/2” conduit, or B) install AC power cord with strain relief. Plug the
unused hole on top with the appropriate fitting.
D 120-277V: Connect the green (ground), black (line), and white (neutral) wires of the AC line to the similarly colored wires of the fixture’s power supply using UL-listed wire connectors. Reattach endcap. 347-480V: Connect the green (ground), red (line), and black (neutral) wires of the AC line to the similarly colored wires of
Continuous Run Installation
A Choose the first fixture for the run and connect the starter wire
harness (provided in Continuous Run Kit) to the fixture wire harness. If
connectors don’t mate, use a small adapter harness (also found in kit).
B Option: Sensor – Insert sensor (ordered separately) into endcap
knockout (provided in Continuous Run Kit) and wire to starter wire harness per
sensor wiring instructions.
C Using two people, hang the first fixture. The side opposite the starter
harness will connect with the next fixture on the run. Connect the starter
harness with building power as shown in the Electrical Connections section of
this guide.
D Align and mount the second fixture on run such that the wire harness
quick-connectors will mate correctly.
E Make wiring connections between the fixtures with the wire harness
quick-connectors.
F Align the metal “joining- bracket” on the first fixture with the
corresponding opening on the second fixture and push fixtures together
G Secure the “joining bracket” by tightening the four #6-32 screws
provided.
H Snap on decorative lens cover (provided in Continuous Run Kit) over the seam between the fixtures.
J Attach end caps (provided in Continuous Run Kit) and tighten screws on each end of the run.
Max Number of fixtures per Run
Output| 120V| 277V|
347V| 480V
4ft 2K| 131| 303| 380| 525
4ft 3K| 90| 207| 259| 358
4ft 4K| 67| 155| 194| 268
4ft 5K| 53| 122| 153| 211
4ft 6K| 43| 98| 123| 171
4ft 8K| 30| 69| 86| 119
4ft 10K| 22| 51| 64| 88
8ft 4K| 71| 163| 204| 283
8ft 6K| 47| 109| 136| 188
8ft 8K| 34| 78| 98| 136
8ft 10K| 27| 61| 77| 107
8ft 12K| 21| 50| 62| 86
8ft 16K| 15| 35| 43| 60
8ft 20K| 11| 26| 32| 44
I Repeating Steps 3-7, add fixtures as needed to complete the continuous
run. Do not exceed the maximum number of fixtures per run listed in the table
above (maximum current through wire harness must not exceed 15A).
NOTE: If there are unused quick connectors at the end of a run, cut off
the connectors and cap the ends with wire connectors to terminate the wires.
Sympton | Solution |
---|---|
Luminaire will not turn on | • Check that the color of the supply side wires |
match the color of the wires they are connected to.
• Check that all wire connectors are properly connected.
• Verify that your input voltage is within specs.
• If using any additional controls (i.e. wireless controls or motion sensors),
please also verify
• that those are working properly and that the unit is set up to interface
with the controllers.
Mounting bracket slides from the side
to side| Check that the mounting bracket is properly tightened using the
adjustment screws provided.
Questions Web:products.gecurrent.com
Phone: 1-866-855-8629
All product and company names are trademarks or registered trademarks of their
respective holders. Use of them does not imply any affiliation with or
endorsement by them.
2021 Current Lighting Solutions, LLC. All rights reserved. GE and the GE
monogram are trademarks of the General Electric Company and are used under
license. Information provided is subject to change without notice. All values
are design or typical values when measured under laboratory conditions.
ALB066 | REV 05/06/21
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>