LUCI LV.7100 Inox Freestanding Bath Filler Installation Guide

June 1, 2024
Luci

LUCI-logo

LUCI LV.7100 Inox Freestanding Bath Filler

LUCI-LV-7100-Inox-Freestanding-Bath-Filler-product

Product Information

Specifications

  • Compliance: AS/NZS3500.1 2003
  • Water Inlet: Hot & cold water inlets should have equal pressures
  • Operating Pressure: 150 – 500kpa
  • Maximum Hot Water Temperature: 75°C

Product Usage Instructions

Installation Recommendations:
Ensure compliance with AS/NZS3500.1 2003 or relevant local requirements. This product is not suitable for gravity feed applications. Hot and cold water inlet pressures must be equal. If operating static pressure exceeds 500kpa, install an approved pressure limiting valve.

Pre-Flush:
Before connecting any tapware or faucets, flush out the pipework to prevent debris from causing damage. Warranty does not cover damage caused by debris from pipework.

Water Temperature:
Ensure that the maximum hot water temperature does not exceed 75°C to prevent damage to the product.

LUCI Installation Instruction:
Follow the LV.7100 installation instructions carefully to avoid voiding the warranty. Prior to installation, read the provided instructions thoroughly.

Care and Use:

  1. Shut the tap gently to reduce water hammer or banging pipes.
  2. Clean chrome surfaces regularly with non-scouring, neutral wash solutions only.

FAQ

  • Q: What should I do if the water pressure exceeds the recommended limit?
    A: If the water pressure exceeds 500kpa, install an approved pressure limiting valve to ensure safe operation.

  • Q: Can the product be used for gravity feed applications?
    A: No, this product is not suitable for gravity feed applications. Please ensure proper water pressure for optimal performance.

LUCI INSTALLATION INSTRUCTION
LV.7100

IMPORTANT!
Please read this instruction Prior to installation

T 1300 837 688 E info@verotti.com www.verotti.com

IMPORTANT RECOMMENDATIONS FOR INSTALLATION

Installation should comply to AS/NZS3500.1 2003 or relevant local requirement. Not suitable for gravity feed application.
Hot & cold water inlet pressures should be equal.

  • WATER PRESSURE
    Operating static pressure is 150 – 500kpa. If pressure exceeds this, then an approved pressure limiting valve must be installed.

  • PRE-FLUSH
    Always flush out the pipework before connecting any faucets.
    Damage caused to the faucet by debris coming through the pipework is not covered under warranty.

  • WATER TEMPERATURE
    Maximum hot water temperature is 75 degree.

ATTENTION!
Failure to do so will void the warranty.

Installation

LUCI-LV-7100-Inox-Freestanding-Bath-Filler- \(1\)

  1. Ensure both supply pipes has been flushed and is free from debris before proceeding.

  2. When installing into a concrete floor, a chase will need to be cut out of the concrete to rough in the supply pipe.
    Rough in to a spout outlet with a 1/2 inch male BSP thread & cap until fit- off.

  3. Feed the two flexible hoses through the floor bracket, riser pipe & cover plate. Hand tighten riser pipe into the bracket & slide plate onto riser pipe.

  4. Connect the two flexible hoses into the mixer by hand tightening & making a final adjustment with spanner. Hand tighten riser pipe onto mixer.

  5. Connect the two flexible hoses into the water supply by hand tightening & making a final adjustment with a spanner.

  6. Screw mounting bracket to floor using fixings provided. Slide cover plate down into position.

Care and Use

  1. Shutting the tap gently will reduce the chance of water hammer or ‘banging’ pipes.
  2. Regularly clean the chrome surfaces only with non scouring, neutral wash solutions.

LUCI-LV-7100-Inox-Freestanding-Bath-Filler- \(2\)

LUCI-LV-7100-Inox-Freestanding-Bath-Filler- \(3\)

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals