enelion Lumina 3 In 1 Modular Structure Installation Guide
- June 2, 2024
- enelion
Table of Contents
- Lumina 3 In 1 Modular Structure
- Specifications
- Product Usage Instructions
- Before Installation
- Preparation for Installation
- Installation Process
- Power Supply Network Systems
- Ethernet Connection
- Start-up and Configuration
- Daily Use and Operation
- How do I charge my device?
- What are the safety features of ENELION LUMINA?
Lumina 3 In 1 Modular Structure
“`html
Specifications
Housing: Polycarbonate, anodised aluminium,
powder coating*
Ingress protection rate: IP54
Impact protection: IK10
Flammability class: UL94-V0
Charging connector type: Residual current
protection
Embedded residual current monitor: Enelion RCM
B 6 mA DC
Energy metering: Integrated 3-phase energy
meter > 99% accuracy
Certified electricity meter (MID)
User interface: Online communication unit OCPP
communication protocol
Multi-colour LED strip: EVC status indication;
Dedicated app
Integrated LTE/4G modem: Hide the AP and
connect the station to local Wi-Fi network; Compliance with OCPP
1.6 J protocol
Minimal signal quality requirements: Wi-Fi: -60
dBm GSM: -85 dBm
Authorization: Dedicated app
Current/Charging power: Up to 7.4 kW at 32 A
1-phase
Product Usage Instructions
Before Installation
Please read the manual before installation. Ensure you have all
the necessary tools and safety screws.
Preparation for Installation
Prepare the device for installation by checking ENELION LUMINA
SOCKET, ENELION LUMINA ALU SOCKET, and ENELION LUMINA ALU CABLE
components.
Installation Process
Follow the step-by-step guide provided in the manual for
installing the charger. Use the diagrams of connection variants and
overview diagrams of modules for reference.
Power Supply Network Systems
Ensure proper electrical connection and consider alternative
methods for inserting power cables if needed. Use the M20 gland
adapter for secure connections.
Ethernet Connection
Establish a wired communication in ENELION LUMINA for network
connectivity. Follow the instructions for connecting to
Ethernet.
Start-up and Configuration
After installation, proceed with the start-up and configuration
of the station as detailed in the manual. Configure additional
settings as needed.
Daily Use and Operation
To charge your device, follow the instructions provided in the
manual. Monitor the interface LED for charging status and refer to
the maintenance section for cleaning guidelines.
FAQ
How do I charge my device?
To charge your device, connect it to the ENELION LUMINA charger
following the provided instructions. Monitor the LED interface for
charging status.
What are the safety features of ENELION LUMINA?
The ENELION LUMINA charger includes safety screws and embedded
residual current protection for user safety. Refer to the safety
instructions in the manual for more details.
“`
Installation guide
Video tutorial
ENELION LUMINA
3 in 1 modular structure — build and upgrade your dreamed solution using the
same base module. Quick installation — get your EV charger ready to work
online in no more than 15 minutes of the installation process.
Dear Partner,
Congratulations on your purchase of the Enelion charger and thank you for your
trust.
Up-to-date manuals for users and installers always available at:
https://enelion.com/support-lumina/
Please read this manual before installation or prior to the station being
commisioned.
Introduction
6
Table of content
Additional tools necessary for installation
6
Optional safety screws
7
Features
8
Technical specifications
9
Safety instructions
11
Before the installation
13
How to prepare the device
for installation
14
ENELION LUMINA SOCKET
14
ENELION LUMINA ALU SOCKET
15
ENELION LUMINA ALU CABLE
16
Installation
17
Diagrams of connection variants
17
Overview diagrams of modules
18
Preparation
18
Power Supply Network Systems
18
Installation of mounting plate
21
Electrical connection
21
Alternative method for the insertion of power cables
23
M20 gland adapter
24
Measuring a 230 V socket.
25
Ethernet connection.
27
Wired communication in ENELION LUMINA.
27
Table of content
Step by step
29
Start-up and configuration of the station
33
Additional information for
the UK market
34
Pen Fault Detection
34
Daily use and operation 35
How do I charge?
35
Interface LED
36
Maintenance
36
Cleaning
36
Practical details
37
Customer service
39
ENELION LUMINA products family
ENELION LUMINA
BACKPLATE
ENELION LUMINA ALU CABLE
ENELION LUMINA ALU SOCKET
CLOSED
ENELION LUMINA SOCKET
OPENED 5
Introduction
Additional tools necessary for installation
x6 x6
max. 5 mm
5 mm
PH2 + PH3 PZ1 + PZ2 + PZ3 T10 + T15 + T20
6
Optional safety screws
Each charger kit includes safety screws (additionally secured with a pin to
prevent unauthorized access) that can replace the standard screws attaching
the top part of the head to the back, if needed. The appropriate bit is
optionally available as an accessory or can be purchased separately (size T10H
x 25 mm).
i
If you need the appropriate bit, you can order it from us under the index
AKCBIT-010.
7
Features
LED INTERFACE LTE
ROOM FOR OPTIONAL ETHERNET MODULE
ROOM FOR OPTIONAL 230 V CEE 7/3 SOCKET 8
RFID CARD READER
SOCKET TYPE 2 WI-FI
ROOM FOR OPTIONAL CERTIFIED ENERGY METER
Technical specifications
Housing
Polycarbonate, anodised aluminium, powder coating*
Ingress protection rate
IP54
Impact protection
IK10
Flammability class
UL94-V0
Charging connector type Residual current protection
Enelion LUMINA SOCKET Type 2 socket, Enelion LUMINA ALU CABLE Type 2
connector with 5.2 m cord
Embedded residual current monitor – Enelion RCM B 6 mA DC
Energy metering
Integrated 3-phase energy meter > 99% accuracy
Certified electricity meter (MID)
Impulse* possible to install inside the housing
User interface Online communication unit OCPP communication protocol
·
Multi-colour LED strip EVC status indication;
·
Dedicated app
·
Integrated LTE/4G modem
·
Wi-Fi 2.4 GHz b/g/n direct access point to the station with an option to
hide the AP and connect the station to local Wi-Fi network
compliance with OCPP 1.6 J protocol
Minimal signal quality requirements
· ·
Wi-Fi: -60 dBm GSM: -85 dBm
Authorization
·
Built-in RFID/NFC reader Mifare Classic/Freecharge Mode
·
Dedicated app
Current/Charging power
·
Up to 7.4 kW at 32 A 1-phase
·
Up to 22 kW at 32 A 3-phase (TN system)
Charging voltage
3 x 400 V AC/230 V AC (±10%)
9
Supply voltage
Other features Operating temperature Maximum altitude for installation Height
Depth Width Weight
Compliance
3 x 400 V AC/230 V AC (±10 %) (TN/IT) Possibility of connecting the cable from the top, bottom and the back of the station
·
Configuration with no additional tools
·
Remotely controlled 230V socket (max. 2000W/10A)*
·
Temperature and humidity monitoring inside device
·
Remote start/stop, delayed start and end of charging
From -30°C to +55°C 2000 m
390 mm
133 mm
155 mm
3.3-8.9 kg (depending on device version)
2014/53/EU (RED); 2011/65/EU (RoHS), 2014/30/EU (EMC) ; 2014/35/EU (LVD); UK
SI 2016 No. 1101; UK SI 2016 No. 1091; UK SI 2017 No. 1206; UK SI 2012 No.
3032
The following BSI and ETSI standards and technical specifications have been applied:
ETSI EN 300 328 V2.2.2:2020-03; EN 62196-2:2017-06; EN IEC 618511:2019-10; EN IEC 61851-21-2:2021-09; EN 62196-1:2015-05; ETSI EN 301 511 V12.5.1:2017-10 ETSI EN 300 330 V2.1.1:2017-08; ETSI EN 301 489-1 V2.2.3:2020-07; ETSI EN 301 489-17 V3.2.4:2021-05
- Option 10
Safety instructions
The Enelion charger (hereinafter referred to as the device, charger, or
charging terminal) is a charging station designed for electric vehicle
charging within the meaning of the `Act on Electromobility and Alternative
Fuels’ dated January 11, 2018, in paragraphs 5, 12, 13, and 27 of Article 2 of
the aforementioned act.
The installation and servicing of the device must be carried out by qualified
and authorized individuals, and repairs may only be performed by the
manufacturer or entities authorized by the manufacturer. During the warranty
period, only authorized service centers and the manufacturer are allowed to
perform warranty repairs.
Interference with mechanical, electrical, and electronic components, as well
as the device’s software, is strictly prohibited and may void the warranty.
Exceptions are actions described in the following instruction manual or those
agreed upon in writing with the manufacturer.
The manufacturer is not responsible for property damage resulting from
prohibited interference with the product.
The electrical installation to be used during device operation must meet the
conditions described in the installation manual. The manufacturer is not
responsible for incorrect execution and/or protection of the electrical
installation to which the device is connected.
The manufacturer is not responsible for the improper functioning of the
electrical installation
to which the device is connected.
The electrical installation to be used during device operation must comply
with the legal standards applicable at the installation and operation location
of the device.
The manufacturer is not responsible for damages caused by an electrical
installation that does not comply with legal standards.
The device does not have a built-in power switch.
The device is activated when the power supply voltage is applied. Power
disconnection must be ensured by appropriate devices in the electrical
installation described in the installation manual. Except in emergency
situations, the device should not be switched off during the charging process.
It is prohibited to power on the device when the device housing is open.
It is prohibited to use a charger that is mechanically damaged or indicates a
critical error.
Objects not intended for this purpose must not be placed in the charger
socket. The only object intended for insertion into the charger socket is a
functional power cable with the appropriate power and type for the electric
vehicle, terminated with a functional type 2 plug according to EC 621962.
The use of extension cords, adapters, and charging cable extensions is
prohibited.
The manufacturer is not responsible for loss of health or life resulting from
non-compliance with the above recommendations.
11
During the warranty period, the manufacturer allows the purchase of support
packages for the device (extended warranty/service) subject to a qualifying
review before purchasing the package. Details can be obtained from the Enelion
sales department. The charging station does not support ventilation functions.
The nameplate present on the device is an integral part of it and must not be
removed or damaged, as this may result in the loss of the manufacturer’s
warranty.
i
Three self-adhesive labels with information about the current value have been
included in the set. Please select the appropriate one according to the
specifications and affix it next to the nameplate.
12
Before the
installation
· This product may only be installed, repaired or serviced by an authorized
electrician. All local, regional and national electrical installation
regulations must be observed. It is recommended to consider future charging
needs before installation.
· The power supply to the Enelion charging terminal must be provided from an
electrical switchgear. The switchgear must have the required protection in the
form of a type B or C over current circuit breaker and a current rating of 32
A or less, suitable for the configuration of the device. To declare compliance
with EN IEC 61851-1:2019-10, each charging point must also be individually
protected against Type A and Type B residual current. This requirement must be
fulfilled by one of the following: 1. Installation of a type B residual
current device (RCD B 30 mA/40 A) or RCD EV (30 mA/40 A) in the switchgear, 2.
Installation of a residual current device type A (RCD A 30 mA/40 A) in the
switchgear using the Enelion RCM B Residual Current Monitor type B provided
on the charging terminal.
· The final selection of the protective equipment must be made by an
authorized designer or qualified electrician.
· For maximum charging power, it is recommended to use cables with a conductor
cross-section not exceeding 6 mm2. This is also the maximum diameter that can
be installed in the connection terminals. For convenient installation,
flexible power cords
of the wire type terminated with collets are recommended. · A residual current monitor (RCM) can be integrated into the Enelion LUMINA charger. This will switch off the current to the electric vehicle if: a residual current of 46 mA DC occurs. The RCM is reset by disconnecting the charging cable and reconnecting it.
Load
Charging power
Charging 1 phase current (kW) (A)
3 phase (kW)
6
1.4
4.1
8
1.6
5.5
10
2.3
6.9
13
3.0
9
16
3.7
11
20
4.6
13.8
25
5.8
17.3
32
7.4
22
The table above shows what charging power you can expect from your
installation.
The table is for information purposes only.
13
How to prepare the device for installation
ENELION LUMINA SOCKET 2
1
02 Slide out the head module and remove the housing cover
2 1
01
14
Undo two long bolts and two screws at the bottom (1). Repeat with two screws at the top (2)
03 Unscrew the fixing screws and remove the transparent cover
ENELION LUMINA ALU SOCKET 2
1
02 Slide out the head module
1 2
01 Undo two long bolts at the bottom (1) and two screws at the top (2)
03
Unscrew the fixing screws and remove the transparent cover
15
ENELION LUMINA ALU CABLE 3 1
1 2
3
2
02 Slide out the head module
01
16
Dismantle the cable holder (1). Undo two long bolts at the bottom (2) and two screws (3) at the top
03 Unscrew the fixing screws and remove the transparent cover
Installation
Do not carry out outdoor installation during rain or strong winds if there is
a risk that water or debris may enter the device.
All of the operations described in this manual should be carried out after
making sure that there is no voltage in the power cord.
This product may only be installed, repaired or serviced by an authorized
electrician. All local, regional and national electrical installation
regulations must be observed.
01 Diagrams of connection variants
Enelion LUMINA Backplate
Enelion LUMINA Backplate
Output connector
Terminal block
Output connector
Terminal block
Cable line
Video tutorial https://enelion.com/support-lumina/
In addition to the steps described on the following pages, we recommend
watching the installation videos.
Main switchboard
32 A/6 kA
Billing meter
30 mA/40 A
30 mA/40 A
17
02 Charging module Type 2 socket with RCM B 6 mA DC
Overview diagrams of
modules
5×6 mm2
H0
5 C 1000 V
275 V AC
Charging module
Input connector
Type 2 socket with RCM B 6mA DC
H07Bz5-F5G 6,0 mm2 + 1×0,75 mm2 450/750 V
Type 2 socket
03 Preparation
In the box with the Enelion LUMINA charger, you will find an assembly template
to help you choose the installation location and prepare the installation
holes.
We recommend that you position the station so that the top edge of the
charging station is approximately 130 cm from the floor.
The electrical cable can be connected to the station from above, from below
and directly from behind the station at the gland marked on the template.
The design of the station allows both wall and pole installation (additional
installation components required sold separately). We suggest that there is
local Wi-Fi network coverage at the station installation site and/or LTE
mobile network coverage if the station is to be used online.
03.1 Power Supply Network Systems
Enelion charging stations are designed for five-
wire power supply. In a TN-S 230/400V network,
Input connector
this is the standard option.
18
TN-S 230/400 V
Generator or transformer
Grounding
MCB RCD
L1 L2 L3 N PE
EVSE
L1
Phase-Phase
L2
400 V
L3 Phase-N 230 V
N
PE
TN-C
Generator or transformer
Grounding
L1 L2 L3 N PEN
Load
It is possible to power the station from other network systems described below:
TT 230/400 V
Generator or transformer
Grounding
MCB RCD
L1 L2 L3 N PE
EVSE
L1
Phase-Phase
L2
400 V
L3 Phase-N 230 V
N
Grounding
TN-C
Generator or transformer
Grounding
L1 L2 L3 N PEN
Load
L1
L2
Phase-Phase
400 V
L3 Phase-N
230 V
PEN
L1
L2
Phase-Phase
400 V
L3 Phase-N
230 V
PEN
In the TN-C system configuration, you should separate the PEN conductor into N and PE as shown in the diagram below.
In the case of an IT network with 120/230 V, as found in Norway, the
connection appears as follows.
19
It should be noted that one of the phases serves as the Neutral conductor, which is important during the installation of RCD (Residual Current Device). In such a network, it is not possible to charge in three phases; only some vehicles will be able to charge in two phases.
IT 120/230V
Generator or transformer
L1
L2
Phase-Phase
230 V
L3
Phase-PE
PE
120 V
High Z Grounding
MCB RCD
L1 L2 L3 N PE
EVSE
Grounding
It is not possible to power the station from an IT network with 230/400V.
IT 230/400 V NOT ALLOWED!!!
Generator or transformer
L1
Phase-Phase
L2
400 V
L3 Phase-PE
230 V PE
High Z
Other, more complex power systems require technical consultation before purchase.
Grounding
L1 L2 L3 N PE
EVSE
Grounding
20
04 Installation of mounting plate
!
Turn off the power before installation.
1. Connect the electrical cable. 2. Hang the mounting plate according to the
template. 3. Secure electric cable in the gland.
05
Electrical connection
For maximum charging power, it is recommended to use cables with a conductor cross-section not exceeding 6 mm2. This is also the maximum diameter that can be installed in the connection terminals. For convenient installation, flexible power cords of the wire type terminated with collets are recommended.
Installation of the cables in the station cable terminals does not require any special tools.
!
The label placed on the connectors indicates the sequence of connecting phase
wires. To connect the wires, remove the label.
21
1-phaze
3-phaze 1-phaze
3-phaze
!
It is recommended to use the existing colour code used in the wiring.
Depending on the standard in your country, the cable colours may differ from
those shown.
!
Before switching on the power, make sure that the cables are connected
correctly. Test this by pulling on each wire.
After preparing the installation, close the transparent cover.
22
06 Alternative method for the insertion of power cables
If it is not feasible to insert the power cables in the standard way, an
alternative method can be applied.
In the lower part of the rear housing of the station (if it is not equipped
with the optional 230 V socket), there is a hole for an M25 cable gland with a
blanking plug.
If necessary, the installer can remove the blanking plug and insert the removed cable gland from the standard installation variant in its place.
!
In order to maintain the warranty, the previously removed plug must be
installed in place of the originally installed cable gland.
23
07
M20 gland adapter
For the alternative method of inserting power cables into the station, an adapter with a hole for M20 gland is available separately it can be used to install a special gland with an armoured cable in case of a single-phase system.
M20
Hole for M20 gland
Blanking plug in place of originally installed cable gland
24
08 Measuring a 230 V socket.
There are two options when it comes to measuring a 230 V socket.
1. Use a single-phase MID meter. To do this, you should connect the socket to
the meter according to the diagram shown in the drawing.
The charger’s power supply is connected directly to the board presented in
chapter 5.
Measuring energy consumption solely through a 230 V socket.
Enelion Lumina Backplate
230V RCMB MID socket terminal terminal terminal
Power connection
terminal
L2
Energy meter
-+
socket
fuse*
Energy meter
Fuse
Distribustion board *0234010.MXP (Cartridge Fuse 250V 10a Medium Acting)
Electrical connection of ENELION LUMINA in the case of measuring a 230 V
socket.
25
Enelion Lumina Backplate
230V RCMB MID socket terminal terminal terminal
Power connection
terminal
L2
Energy meter
-+
socket
fuse*
2. Measuring the Type 2 car charging socket and the 230V socket.
In this case, you should connect it according to the diagram next to it.
Energy meter Fuse
Power connection in the case of measuring the entire ENELION LUMINA charger.
26
!
We do not recommend using a 230 V socket for charging your car because it may
overload the connection.
More information related to measuring the 230 V socket can be found in the
user manual.
09 Ethernet connection.
The Ethernet module is installed in ENELION LUMINA chargers on the back of the
device on the left side. The Ethernet cable can be routed through a special
opening in the back cover and is secured against being pulled out by a special
clamp installed in the charger.
The opening in the back cover of ENELION LUMINA is designed for cables with a maximum outer diameter of 6 mm.
After installing the Ethernet cable, you should activate the Ethernet module
in the configuration panel following the instructions provided in the user
manual.
10 Wired communication in ENELION LUMINA.
Wired communication in ENELION LUMINA is based on a serial, wired CAN bus. For
installation, it is recommended to use a CAT5e or better Ethernet cable with
copper conductors, not CCA – Copper Clad Aluminium.
Communication utilizes a single twisted pair of wires and the shield of the
cable. The total length of the cable must not exceed 500 meters. The socket
for connecting the CAN communication cable is shown in figure:
27
i
Due to differences in the implementation of CAN communication in ENELION
LUMINA chargers and Enelion Wallbox, Vertica, and Stilo chargers, it is not
possible to connect them in a single chain.
To terminate, use the switch shown in the diagrams in devices located at the
beginning and end of the charger chain.
Termination activated.
Termination desactivated.
28
11 Step by step
01 02 Level the template mark the holes
Drill holes insert pins
03 Screw the backplate to walls tighten the cable entry
04 Remove the insulation from the cable
05 Connect wires
29
05a
Enelion LUMINA
with optional
230 V CEE 7/3 SOCKET
and optional CERTIFIED
MODEL LB-32-3-X-1-X-XX-MGR-00
ENERGY METER
!
The presented connection is exemplary. Before installation, check the markings
on the mounted meter.
30
05b
MODEL LB-32-3-X-1-X-XX-GR-00
Enelion LUMINA with optional 230 V
CEE 7/3 SOCKET
31
Slide
ENELION LUMINA ALU SOCKET
06 07 Install the transparent cover using four screws.
Insert SIM card
08a Mount the head on
ENELION LUMINA SOCKET
08b Tighten the head two long bolts at the bottom and two screws at the top
32
Slide from the front
09a 09b Install front cover
Use two long bolts and two screws at the bottom and two
screws at the top
08
Start-up and configuration of the station
Switching on the safety devices, which turns on the voltage at the station,
should be carried out by a suitably qualified person.
Using a smartphone or computer, search for the LUMINA station’s AP with the
SSID listed on the back of the charging head.
After connecting to the LUMINA station’s AP with the SSID and password given
on the back of the charging head, type the following into the address bar of
your browser: http://192.168.8.8
http://192.168.8.8
Access to the configuration panel is protected by a password, which by default
is admin.
It is also possible to log into the simplified version of the panel via your
user account and password user.
The password should be changed if necessary.
The configuration process should be carried out according to the instructions
on the panel.
33
Additional information fmfmooaarrrrttkkhheeeettUUKK
This section outlines the information for installation of Enelion LUMINA in
the UK region.
Part Numbers Affected: Heads: LH-32-1-X-0-S-04-EO-00, LH-32-1-S-0-S-04EO-00;
LH-32-1-B-0-S-04-EO-00; LH-32-1-S0-C-50-EO-00; LH-32-1-B-0-C-50-EO-00
!
The label placed on the connectors indicates the sequence of connecting phase
wires. To connect the wires, remove the label.
!
Connection for Pen Fault Detection configured charger Head. Pay attention to
different connection of PE conductor!
34
01
Pen Fault Detection
To follow and be compliant with the regulations specified by IET in clause
722.411.4.1 (iv), Enelion LUMINA uses a technology that enables you to
directly connect your charger to a PME supply.
Enelion LUMINA now includes a safety monitoring system to detect potential
earth-neutral faults. If faults are detected in the circuit, the charge cycle
ends thus isolating the vehicle from the power supply.
This removes the risk of touching the vehicle and a potential shock if earth-
neutral fault is present.
Daily use and operation
01
How do I charge?
Before using the Enelion LUMINA charger, ensure that the following
requirements are met:
· An authorized electrician has made the electrical connection correctly.
· The charger is correctly configured. · The software is up to date. · If
access control is configured, block it with
a registered RFID tag or disable it in the configuration panel on the Wi-Fi
interface.
Before each use of the Enelion LUMINA charger:
1. Check that the charging cable and connector are not damaged or
contaminated, e.g. due to foreign objects or water.
2. Connect the charging cable to the Enelion LUMINA charger and to the
electric car. The charging process starts and adapts automatically to the
electric car and the available power based on its configuration. If the car
does not start charging, check that charging is enabled in your car and that
the connectors are correctly connected.
35
02 Interface LED
The Enelion LUMINA charging station has an LED interface that provides the user with basic information:
Status
Light type
Availability
Green flashing
Charging (energy transfer in progress)
Blue flashing from inside towards the edge
Charging (no energy Blue flashing transfer)
Warning/minor error (the charger will attempt to return to its previous state)
Yellow flashing
Error
Red flashing
Fatal error
Steady red
Authorization
Light type
User acceptance
Running from left to right in green
User rejection
Running from left to right in red
Authorization pending White dot moving from left to right
The interface provides only basic operational information, detailed
information can be read from the configuration panel.
36
03 Maintenance
The manufacturer recommends conducting an inspection of the device once every
12 months for safety and maintenance reasons. The inspection is not mandatory.
The device is designed to operate in temperatures from -30°C to +55°C. The
manufacturer does not guarantee the correct operation of the charging station
at temperatures outside of the specified range. Chargers damaged by
temperatures below -30°C or above +55°C are not covered under the warranty.
04
Cleaning
The correct way to clean the charger is to wipe the casing with a microfibre
cloth using a cleaner dedicated to the plastic of the casing. Plastic parts
(the socket) should be cleaned with a microfibre cloth using a cleaning agent
dedicated to glass. Other cleaning methods (e.g. using a wire brush) may
damage the casing.
Damage caused by improper cleaning of the device does not constitute grounds
for warranty claims.
Practical details
Standards
Enelion sp. z o.o. hereby declares that this product, the Enelion LUMINA
charging station, complies with:
2014/53/EU (RED); 2011/65/EU (RoHS), 2014/30/EU (EMC) ; 2014/35/EU (LVD); UK
SI 2016 No. 1101; UK SI 2016 No. 1091; UK SI 2017 No. 1206; UK SI 2012 No.
3032
The following BSI and ETSI standards and technical specifications have been
applied:
ETSI EN 300 328 V2.2.2:2020-03; EN 621962:2017-06; EN IEC 61851-1:2019-10; EN
IEC 61851-21-2:2021-09; EN 62196-1:2015-05; ETSI EN 301 511 V12.5.1:2017-10
ETSI EN 300 330 V2.1.1:2017-08; ETSI EN 301 489-1 V2.2.3:202007; ETSI EN 301
489-17 V3.2.4:2021-05
The full content of the declaration of conformity is available at: enelion.com
Disposal
This electronic equipment must not be disposed of with household waste. There
may be free collection points available in your area where you can hand over
your old equipment. Please follow local regulations for proper and
environmentally friendly disposal. If your old electronic equipment contains
personal data, you are responsible for removing this data before returning the
equipment.
Repair The manufacturer allows for the repair of public, publicly accessible
charging stations without the need for UDT reapprovals (if the charger’s
parameters have not changed).
The manufacturer permits modular repair, i.e., replacing the entire module or
device instead of repairing individual components.
37
If your charger requires repair, please contact your distributor. Returns and
complaints For product returns and complaints, please contact your distributor
or Enelion customer service.
38
Customer service
Download the latest user manuals, useful documents and videos for your product on https://enelion.com/support-lumina/
This document contains information that is subject to change without notice.
© 2024 ENELION 52 Mialki Szlak St , 80-717 Gdansk, Poland
39
Copyright Enelion sp. z o.o. The manual may change as the product develops.
All rights reserved. Revision: V 7.3 Number of pages: 40 Released: March 13,