Enelion Energy Guard User Guide
- June 9, 2024
- enelion
Table of Contents
Enelion Energy Guard
Quick Guide
Congratulations on the purchase of the Enelion product and thank you for your trust. Before the installation, make sure that the module packages contain all the elements: Energy Guard module and set of the measuring coils.
Current version of the operation manual can be accessed at http://enelion.com/en/help/
Basic information
Enelion Energy Guard is a device that monitors energy consumption of the whole
building – from a single household to the largest office parks. Based on the
power provided by the energy supplier and the current consumption measured by
Energy Guard, it is possible to obtain information on how much power can be
directed for EV charging.
Enelion Energy Guard is a device with 105x20x80mm dimensions. EEG requires to
be installed inside the electrical switchboard on the DIN rail.Since the
Enelion Energy Guard has different dimensions than the standard fuse which is
installed in the switchboard, it is required to enlarge the hole in the blend.
INFO
All necessary information are in Energy Guard Assembly Manual.
Installation should be done by qualified personel with electric permissions,
who were introduced to the requirements of this manual and are equipped with
the necessary tools for proper installation.
WARNING
The manufacturer is not responsible for damage resulting from failure to
comply with connection schematic or failure with the electrical connection.
Energy Guard can work in three or one phase configuration.
HINT
CAN bus termination should be done according to the information in the
Energy Guard Assembly Manual.
Electrical installation
According to the above diagram for proper operation, three plugs connection is
required (3-phase configuration):
- Prepare and connect CAN cables to provide communication.
- Put the measuring coils on cables according to the orientation which is shown in the schematic (1-phase or 3-phases) and connect the plug to the Energy Guard socket.
- Connect voltage lines according to the main schematic. This device is not require special overcurrent protection. Suggested cables with a conductor cross-section of 0,5 mm2.
Usage preparation
Before first use of the Energy Guard, make sure that:
- The device was properly connected to the power network.
- The communication cord was properly connected.
- There was kept the right order of the measuring coils.
WARNING
Faulty measuring coils connection could cause incorrect algorithm work.
First launch
To start operating with the Energy Guard, make sure that cords and connectors were properly connected and then switch the power on and see the state of LED controls on the front pannel. If the led status pulsing blue or green it means correct connection. Yellow or red color means incorrect state or damage. In such a case, turn the power off and check the correction cords connection.
INFO
All information about LED indicators is in the assembly manual.
If the connection was made properly and the charging session is continuing,
there will be possible to see the change of the value of available power on
the screen – Available power.
Energy Guard can work in three or one phase configuration.
Customer Support
© 2021 ENELION
The manual may change as the product develops. The information
provided may not be correct. All rights reserved.
Wersja: V 1.1
Data wydania: 24 wrzesni ´ a 2021
ENELION Sp. z o.o.
ul. Pana Tadeusza 50, 80-123, Gdansk ´ , Polska
www.enelion.com
Documents / Resources
| Enelion Energy Guard [pdf] User Guide
---|---
|
enelion Energy
Guard
[pdf] Installation Guide
Energy Guard
References
- Enelion - Electric Vehicle (EV) charging manufacturer