K2 Systems 5105 Non Metal Flashings Traditional Metal Flashings Instruction Manual

June 2, 2024
K2 Systems

5105 Non Metal Flashings Traditional Metal Flashings

“`html

Specifications

  • Product Name: Splice Foot X and XL
  • Manufacturer: K2 Systems (formerly Everest Solar Systems)
  • Website: k2-systems.com

Product Information

General Safety Information

Please note that the general mounting instructions must be
followed at all times. The equipment should only be installed and
operated by qualified and trained installers. It is important to
ensure compliance with on-site static loading requirements and roof
load-bearing capacity for roof-mounted systems.

Tools Overview

The necessary tools for installation will be detailed in the
manual. Make sure to have all required tools ready before starting
the assembly process.

Splice Foot X & XL Dimensions

The manual provides detailed dimensions for the Splice Foot X
and XL components to aid in the assembly process.

Components

The manual lists all components included in the Splice Foot X
and XL kit for easy identification during assembly.

Assembly

Follow the step-by-step assembly instructions provided in the
manual to correctly install the Splice Foot X and XL components.
Make sure to adhere to the manufacturer’s guidelines for proper
installation.

Bonding and Grounding

Proper bonding and grounding procedures are crucial for the safe
and effective operation of the PV system. Follow country-specific
standards and regulations for equipotential
bonding/grounding/earthing between individual parts.

Fire Rating

Ensure that the components used in the PV system meet required
fire safety standards as outlined in the manual.

Compatible Modules

Refer to the list of compatible modules provided in the manual
to ensure proper integration with the Splice Foot X and XL
components.

FAQ

Q: Can the Splice Foot X and XL be used with any PV

system?

A: The Splice Foot X and XL are designed to support PV systems;
however, it is important to check compatibility with specific
modules and mounting configurations.

Q: What should I do if I encounter corrosion on the

components?

A: Carefully inspect all components for corrosion exposure and
replace any affected parts with appropriate corrosion-resistant
alternatives as necessary.

Q: How often should I review the installation

instructions?

A: Prior to installation, consult the manufacturer’s website for
up-to-date instructions, as the installation process may change
over time.

“`

We support PV systems
Formerly Everest Solar Systems
Splice Foot X and XL
INSTALLATION MANUAL
k2-systems.com

Content

T General Safety Information

3

· Roof requirements

4

· Structural requirements

4

· Important mounting instructions

4

T Tools Overview

5

T Splice Foot X & XL Dimensions

6

T Components

8

T Assembly

10

T Bonding and Grounding

16

T Fire Rating

17

T Compatible Modules

18

T Notes

22

Quality tested ­ several certifications
K2 Systems stands for secure connections, highest quality and precision. Our customers and business partners have known that for a long time. Independent institutes have tested, confirmed and certified our capabilities and components. Please find our quality and product certificates under: k2-systems.com/en-US/company/quality-management-and-certificates
2

General Safety Information

Please note that our general mounting instructions must be followed at all times and can be viewed online at https://k2-systems.com/en- US/downloads/documentation

T The equipment may only be installed and operated by qualified and adequately trained installers.
T Prior to installation, ensure that the product complies with on-site static loading requirements. For roof-mounted systems, the roof load-bearing capacity must always be checked.

of 25 years! We strongly recommend reviewing our terms of guarantee, which can be viewed at https://k2-systems.com/ en-US/downloads/documentation. We will also send this information on request.
T Dismantling of the system is performed in reverse order to the assembly.

T National and local building regulations and environmental requirements must be adhered to.
T Compliance with health and safety regulations, accident prevention guidelines and applicable standards are required. · Protective equipment such as safety helmet, boots and gloves must be worn. · Roofing works must be in accordance with roofing regulations utilizing fall protection safeguards when eaves height exceeds 3 m. · At least two people must be present for the duration of the installation work in order to provide rapid assistance in the event of an emergency.
T K2 mounting systems are continuously developed and improved and the installation process may thereby change at any time. Prior to installation consult our website at: https://k2-systems.com/en-US/downloads/documentation for up-to-date instructions. We can send you the latest version on request.
T The assembly instructions of the module manufacturer must be adhered to.
T Equipotential bonding/grounding/earthing between individual parts is to be performed according to country specific standards, as well as national laws and regulations.

T K2 stainless steel components are available in different corrosion resistance classes. Each structure or component must be carefully checked for possible corrosion exposure.
T The installer is solely responsible for:
T Handling and installing the PV modules and rail system according to the manufacturer’s instruction, with special attention for the suggested clamping locations on the frame. attention for the suggested clamping locations on the frame.
T Complying with all applicable local or national building codes, standards and industry best practices including any code that may supersede this manual.
T Ensuring that K2’s and other products are appropriate for the specific installation and the installation location.
T Using only K2 parts and installer-supplied parts as specified by K2. (Substitution of parts may void the warranty and invalidate the letters of certification.)
T Verifying the strength of any alternate mounting devices used in lieu of the anchoring screws.
T Ensuring safe installation of all electrical and mechanical aspects of the PV array.

T At least one copy of the assembly instructions should be available on site throughout the duration of the installation.
T Failure to adhere to our general safety and assembly instructions and not using all system components, K2 is not liable for any resulting defects or damages. We do not accept liability for any damage resulting in the use of competitor’s parts. Warranty is excluded in such cases.
T If all safety instructions are adhered to and the system is correctly installed, there is a product warranty entitlement

T Ensuring correct and appropriate design parameters are used in determining the design loading used for design of the specific installation. Parameters, such as snow loading, wind speed, exposure and topographic factor should be confirmed with the local building official or a licensed professional engineer.
T K2 recommends inspecting installed racking system periodically for loose components, loose fasteners and any corrosion.

3

The following guidelines apply
The CrossRail System can be installed as standard under the following conditions. Even if the system is capable of meeting higher demands through the integration of safety standards, please get in touch with your contact at K2 Systems if the specified values are exceeded.

Roof Requirements
T The sufficient holding force of the roof covering at the support or substructure must be ensured on site.
T Roof pitch: 0 – 75°
T For low slope roofs, make sure there is positive drainage and roofing is compatible with butyl.
Structural Requirements
The static verification of the component is automatically calculated with the K2 Base planning software for the respective location. The design provided in a project report must be followed.
Ensuring that the roof, its rafters, connections, and other structural support members can support the array under all code level loading conditions.
Important Mounting Instructions
!T Maintaining the waterproof integrity of the roof. To maintain the flashing performance, avoid installation when the temperature of the roof and butyl are below 22F or above 176F. K2 EverSeal must be installed on a dry surface.
T Thermal break must be determined by the installer based on the rail system installation instructions. The installer must also determine the maximum allowed span and cantilever design parameters recommended by the rail system manufacturer. The Splice Foot X/XL can be installed on steep slope roofs (composite shingles). The K2 EverSeal is also compatible with felt and synthetic underlayments.

Moisture Content
T The K2 EverSeal is to be installed on dry mounting surfaces.
T Determining how wet is too wet: First, remove the paper backing from a Splice Foot X/XL exposing the clean butyl. Second, press the base, K2 EverSeal side down against the surface. Third, pick up the base. If the base adheres to the roof, the roof is suitably dry for installation.
T A heat gun, roof dryer, calcium chloride or alcohol is suitable to remove ice from the roof surface.
Periodical Inspection
T K2 recommends inspecting installed racking system periodically for loose components, loose fasteners and any corrosion. If found, those components are to be retightened, or replaced immediately.
T When a PV module needs to be removed from the PV array for maintenance and/or replacement, the electric bonding system may need to be temporarily restored to maintain the electrical bonding path. Please make sure the system electrical circuits and disconnects are in the open position and the entire system is powered down. Cover the fronts of modules in the array with an opaque material to stop the production of electricity. Use appropriate safety equipment such as insulated tools and insulating gloves to protect yourself.

4

Tools Overview

Chalk Line 3.0 m

Tape Measure

6.0 m

Drill

Torque Wrench 6 – 35 Nm
(4.5 – 22.2 lb-ft)

13mm Socket

1/4″ Nut Driver

Sealant Gun

Heat Gun

Compatible Sealants

T Henry : 208R, 209, 925 (Black) T Geocel: S2, S4 (Black) T Sashco: Through the Roof T Boss: 125 (Black)

T Top Industrial: Rain Buster 850, 900 T Chem Link: M1 T NPC Solar Seal 900 T GE All Purpose 100% Silicone

Torque Overview
T M10 T-Bolts: 25.8 ft-lb (35 Nm)

Technical Note
T Proper torque values for a wood screw will vary depending on the rafter and/or deck characteristics; hardness, age, and moisture of the wood. Tighten the splice foot screws until the conical washer stops rotating.
T Stainless hardware is soft and if dry torqued too quickly it may cause the nut and bolt to seize.
T K2 Systems recommends all stainless steel threads be lubricated. This will make it easier to tighten nuts to bolts, avoid galling, and facilitate adjustments before the nut is properly torqued. Therefore, avoid the use of an impact driver.

Tools and materials for the installation of third party items such as roof attachment products, roof covering and sealing products or items used for bonding and grounding are not listed here. Please refer to the instructions of those third party products.

5

Splice Foot X
Units: [in] mm
6

Splice Foot XL

2X

.18

Units: [in] mm

4.50

.81 20.60

4x .59 15
4X 1.41 35.80

.98 25
.18 4.50 3.50 88.90
4.00 101.60
6X .24
6

2X .44 11.10
2.68 68

TION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF K2 SYSTEMS. UCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF K2 SYSTEMS IS PROHIBITED.

TOLERANCES

DIMENSION X. X.X X.XX RADIUS ANGULAR

TOLERANCE(mm) ±1.00 ±0.40 ±0.20 ±0.5 ±1º

THIRD ANGLE
Name Drawn
Checked

Date

K2 Systems

Title:

2835 La Mirada Dr Suite A Vista, CA 92081

phone 760.301.5300

4 Material: Weight per length: 2.2618kg/m

Size:
B
1.5198 lbs/ft

Splice Foot XL,

Drawing no. (ESS):
1065 -02

Part no.

Approved

Weight per cut: 229.7948 g

0.5066 lbs Mfg. Process: EXTRUSION

Finish: MILL

Last Revision

Part Weight:

219.8257 g

0.484496 lbs Scale:

1:2

Revision:

02

This drawing is the sole property of K2 Systems. It is protected by copyright and may only be copied, reproduced or distributed to a third party with e

7

4

1 4000113 / 4000162 Splice Foot X / Splice Foot XL
8

2 4000115 Self-tapping screw with sealing washer

3 2 1

3 4000601-H, 4000602-H

4 4000090 / 4000050-H

5 4000019, 4000020

Mid Clamp 30 – 50 mm module frame height

End Clamp or Yeti Clamp 30 – 50 mm module frame height

CrossRail 44-X shown & PNs listed

9

Assembly
Part A: Marking the array and mounting locations
1
! Corner out and mark array on roof. Snap chalk lines for rail location within shingle course. (Refer to module manufacturer frame clamping zones). Mark mounting locations over rafters and chalk lines within shingle course. Refer to engineering letters for allowable mount spacing. It is best practice to stager mounts.
2
! Line up mounts on chalk line.
10

Part B: Mount Placement and Installation for Rafter Connection
To maintain flashing performance, avoid installation when the temperature of the roof and/or butyl is below 22F or ! above 176F. K2 EverSeal must be installed on a dry surface.
1
! Locate the rafter and clean roofing surface for mount placement. Peel back protective paper from butyl, and stick down mount on a single shingle course with the two center holes lining up over the rafter. Position all mounts in the same direction with the long side towards the ridge. Drive provided lag screws into the rafter until the conical washer stops rotating, providing a positive seal. Do not over torque. It should be tightened until the conical washer stops rotating.
2 ! The distance from the edge of the rafter and the wood screws must be at least 5/16″ from the edge.
NOTE: Minimum Edge Distance = 1.5D Where D is the diameter of the screw. NOTE: The screw shall hit the area that is marked by the red box.

5/16″ min.

5/16″ min.

11

3 Modified Rafter
! If the screw hits a nail under the shingle, there are a few solutions: 1. Leave the nail and use the rest of the holes if possible 2. Remove the nail 3. Angle the driver to avoid the nail
Part C: Mount Placement and Installation for Deck Connection
! To maintain flashing performance, avoid installation when the temperature of the roof and/or butyl is below 22F or above 176F. K2 EverSeal must be installed on a dry surface.
1
! For deck attachments, follow steps in B2, but only use Splice Foot screws in the four corners of the mount. When possible always attach mounts to the rafter and only use deck attached as a secondary option when rafters are not within mounting zones for the array. Follow K2 engineered calculations and span charts for deck attachments. Ensure that the mount faces toward the ridge of the roof. When deck attaching check for positive engagement into plywood and avoid plywood seams. It should be tightened until the conical washer stops rotating.
12

2 Modified Deck
! If the screw hits a nail under the shingle, there are a few solutions. Leave the nail and use the rest of the holes if possible, if not: 1. Remove the nail 2. Angle the driver to avoid the nail 3. Use a 3mm steel drill to make a hole.
Part D: Ensuring Proper Installation
1
! Proper torque will vary based on the characterisitcs of the rafter and deck. It’s best practice to tighten the wood screws until the washer stops rotating. After completing process, make sure the Splice Foot X/XL is securely fixed. You may verify that the screws underneath the deck panel are stained with butyl rubber. This indicates a good flashing performance. Butyl should extrude from the sides of the mount.
13

2
! If a screw head gets sheared, or a nail is hit, you must drill into the remaining splice foot holes.
Part E: Leveling Uneven Roof Surfaces
1
! Using a standard comp shingle starter course, level out the roof surface under the Splice Foot.
14

Part F: Attaching CrossRail
A Attaching Single CrossRail
! Position and install rail on back side of Splice Foot towards the ridge, as shown in the image. Insert only one T-Bolt through one Splice Foot slot and into side channel of CrossRail. Turn the T-Bolt clockwise ensuring that the mark at the end of the shaft is vertical, indicating proper alignment. Tighten to 25.8 ft-lbs (35 Nm).
B Splicing Two Rails
When connecting two rails to the Splice Foot, insert two T-Bolts through the Splice Foot slots and into side ! channel of CrossRail. Turn the T-Bolts clockwise ensuring that the mark at the end of the shaft is vertical,
indicating proper alignment. Leave a 1/8″ gap between rails in the center of the Splice Foot. Tighten to 25.8 ft-lbs (35 Nm). Note: Rail connector function for Splice Foot is only compatible with mill rail with kitted t-bolts. If Splice foot is being used in conjunction with dark rail as a splice, bonded t-bolts are required.
1/8″ gap
15

Bonding and Grounding
Appropriate means of bonding and grounding are required by regulation. The information provided in this manual shall always be verified with local and national building codes.
K2 Systems has obtained a UL 2703 system listing from Underwriter’s Laboratories (UL).
A sample bonding path diagram is shown in Figure 1 below. Your specific installation may vary, based upon site conditions and your AHJ`s requirements.
Each electrical connection has been evaluated to a maximum fuse rating of 30A. At least one ground lug per row of modules must be used to ground all strings within each sub-array, although additional may be used for redundancy. When installed per these installation instructions, all connections meet the requirements of NEC 690.43.
This racking system may be used to ground and/or mount a PV module complying with UL 1703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions.

End Clamp (typical location)

K2 Ground Lug (typical location)

Splice Foot M10 Bonding T-Bolt (typical location)

Mid Clamp (typical location)

16

Fire Rating
The CrossRail System has undergone fire performance testing in accordance with UL 2703, Fire Performance. A System Class A fire rating is achieved when using CrossRail 44-X/48-X/48-XL under the following conditions: T Roof slope of 2/12″ rise per linear foot or greater T Used in combination with a UL 1703 Listed module with a fire performance rating of Type 1, Type 2, or Type
3. Consult the module manufacturer for specific fire performance rating information. T CrossRail may be mounted using any stand-off height to maintain the Class A fire rating. Always consult
the module manufacturers installation instructions to ensure your installation is in compliance with their UL 1703 Listing. T The results of the racking system do not improve a roof covering Class rating. All documentation can be found on ULs Online Database as well as K2 Systems` website.
17

Compatible Modules

K2’s CrossRail System was tested with the following:

T UL/NRTL Listed Aptos Solar Modules: · DNA-120-MF26-XXXW · DNA-144-MF26-XXXW · DNA-120-BF23-XXXW · DNA-120-MF23-XXXW · DNA-144-BF23-XXXW · DNA-144-MF23-XXXW
T UL/NRTL Listed Axitec Modules: · AC-xxP/156-60S · AC-xxxM/156-60S · AC- xxxP/60V · AC-xxxP/60xV · AC-xxxP/60S · AC-xxxP/60x · AC-xxxMH/120S · AC- xxxM/60V · AC-xxxM/60xV · AC-xxxMH/120V · AC-xxxM/60S · AC-xxxM/60x · AC- xxxP/156-72S · AC-XXXP/72V · AC-XXXP/72XV · AC-XXXP/72S · AC-XXXP/72X · AC- XXXMH/144S · AC-XXXM/72V · AC-XXXM/72XV · AC-XXXMH/144V · AC-XXXM/72S · AC- XXXM/72X
T UL/NRTL Listed Boviet Modules: · BVM6612M 72-Cell Mono
T UL/NRTL Listed Canadian Solar Inc. Modules: · CS6U-xxx · CS6K-xxx · CS6X-xxx · CS6P-xxx · CS3K-xxxP · CS3K-xxxMS · CS3U-xxxP · CS3U-xxxMS · CS3W-xxxP · CS3U-xxxPB-AG · CS3U-xxxMB-AG · CS3W-xxxPB-AG · CS1H-xxxMS

T CONTINUED – Canadian Solar Inc Modules: · CS6K-xxxM · CS6K-P-FG DYMOND · CS1Y-xxxMS · CS3N-xxxMS
T UL/NRTL Listed CertainTeed Modules: · CTXXXHC11-04 · CTXXXHC00-04 · CTxxxHC11-06
T UL/NRTL Listed ET Solar Modules: · ET-M660xxxBB
T UL/NRTL Listed Hansol Modules: · UB-AN1 Black 270-300 · UBAN1 Silver 270-300 · UD-AN1 330-360
T UL/NRTL Listed Hanwha Q Cells Modules: · Q.PEAK- G4.1/MAx xxx · Q.PEAK BLK G4.1 xxx · Q.PRO G4 xxx · Q.PLUS G4 xxx · Q.PEAK-G4.1/TAA xxx · Q.PEAK BLK G4.1/TAA xxx · Q.PLUS BFR G4.1/TAA xxx · Q.PLUS BFR G4.1/MAx xxx · B.LINE PLUS BFR G4.1 xxx · B.LINE PRO BFR G4.1 xxx · Q.PEAK DUO-G5 xxx · Q.PEAK DUO BLK-G5 xxx · Q.PEAK DUO-G8 xxx · Q.PEAK DUO BLK-G8 xxx · Q.PEAK DUO-G7 xxx · Q.PEAK DUO BLK-G7 xxx · Q.PEAK DUO G7.2 xxx · Q.PEAK DUO-G6 xxx · Q.PEAK DUO BLK-G6 xxx · Q.PEAK DUO BLK-G6+ xxx · Q.PEAK DUO-G6+ xxx · Q.PEAK DUO-G8+ xxx · Q.PEAK DUO BLK-G8+ xxx · Q.PEAK DUO L-G8.3 xxx · Q.PEAK DUO L-G8.2 xxx · Q.PEAK DUO L-G8.1 xxx · Q.PEAK DUO L-G8 xxx · Q.PEAK DUO L-G7.3 xxx · Q.PEAK DUO L-G7.2 xxx · Q.PEAK DUO L-G7.1 xxx · Q.PEAK DUO L-G7 xxx

18

T CONTINUED – Hanwha Q Cells Modules: · Q.PEAK DUO L-G6 xxx · Q.PEAK DUO L-G6.2 xxx · Q.PEAK DUO L-G6.3 xxx · Q.PLUS DUO L-G5 xxx · Q.PLUS DUO L-G5.1 xxx · Q.PLUS DUO L-G5.2 xxx · Q.PLUS DUO L-G5.3 xxx · Q.PEAK DUO L-G5.2 xxx · Q.PEAK DUO L-G5.3 xxx · Q.PEAK L-G4.2 xxx · Q.PEAK L-G4.1 xxx · Q.PLUS L-G4.2 xxx · Q.PLUS L-G4.1 xxx · Q.PLUS L-G4 xxx · Q.PEAK DUO BLK G6+/SC xxx · Q.PEAK DUO G5/SC xxx · Q.PEAK DUO BLK G5/SC xxx · Q.Plus BFR-G4.1xxx · Q.Pro BFR-G4.1xxx · Q.Pro-G4.1/SCxxx · Q.PLUS BFR G4.1 xxx · Q.PRO BFR G4 xxx · Q.PRO BFR G4.1 xxx · Q.PRO BFR G4.3 xxx · Q.PEAK-G4.1 xxx · Q. PEAK DUO BLK G6+/TS XXX · Q.PEAK DUO G5/TS-XXX · Q.PEAK DUO BLK G6/TS XXX · Q.PEAK DUO G6 /TS-XXX · Q.PEAK DUO G6+/TS-XXX · Q.PEAK DUO ML-G9 XXX · Q.PEAK DUO ML-G9.2 XXX · Q.PEAK DUO ML BLK-G9 XXX · Q.PEAK DUO ML BLK-G9.2 XXX · Q.PEAK DUO XL-G9 XXX · Q.PEAK DUO XL-G9.2 XXX · Q.PEAK DUO XL BLK-G9 XXX · Q.PEAK DUO XL BLK-G9.2 XXX · Q.PEAK DUO XL BLK-G9.3 XXX · Q.PEAK DUO XL -G9.3 XXX · Q.PEAK DUO ML -G9.3 XXX · Q.PEAK DUO ML BLK -G9.3 XXX · Q.PEAK DUO ML -G9 XXX · Q.PEAK DUO ML -G9+ XXX · Q.PEAK DUO BLK ML -G9+ XXX · Q.PEAK DUO BLK ML -G9 XXX · Q.PEAK DUO BLK-G10+ · Q.PEAK DUO BLK ML-G10+ · Q.PEAK DUO BLK-G10+ / AC · Q.PEAK DUO BLK ML-G10.a · Q.PEAK DUO XL-G10.d

T CONTINUED – Hanwha Q Cells Modules: · Q.PEAK DUO BLK ML-G10 · Q.PEAK DUO BLK ML-G10.a+ · Q.PEAK DUO BLK ML-G10.a+ /TS · Q.PEAK DUO XL-G10.2 · Q.PEAK DUO XL-G10.c · Q.PEAK DUO XL-G10.3 · Q.PEAK DUO ML-G10 · Q.PEAK DUO ML-G10+
T UL/NRTL Listed Hyundai Modules: · HiS-MxxxMG · HiS-MxxxMI
T CONTINUED – Hyundai Modules: · HiS-MxxxTI · HiS-MxxxRI · HiS-SxxxRI · HiS- MxxxRG
T UL/NRTL Listed Itek Modules · IT-xxx-SE · Hipro TP672M-xxx
T UL/NRTL Listed JA Solar Modules: · JAP6(DG) · JAM6(K)-60-xxx/4BB
T UL/NRTL Listed Jinko Solar Modules:: · JKMxxxPP-72-DV · JKMxxxPP-60-DV · JKMxxxM-60HBL · JKMxxxM-72HL-V · JKMxxxM-72HL-TV · JKMxxx-P-60 · JKMxxxM- 72HL4-TV · JKMxxxM-6RL3-B
T UL/NRTL Listed Kyocera Modules: · KUxxxMCA
T UL/NRTL Listed LG Electronics Inc. Modules: · LGxxxS1C-G4 · LGxxxN1C-G4 · LGxxxS2WG4 · LGxxxN1K-G4 · LGxxxN2W-G4 · LGxxxN1K-A5 · LGxxxQ1C-V5 · LGxxxQ1K-V5 · LGxxxN2W-A5 · LGxxxS2W-A5

T CONTINUED – LG Electronics Inc. Modules: · LGxxxN2T-A5 · LGxxxQ1C-A5 · LGxxxQ1K-A5 · LGxxxN2W-V5 · LGxxxN1C-V5 · LGxxxN1W-V5 · LGxxxN1K-V5 · LGXXXN2W-V5 · LGXXXN1C-V5 · LGXXXN1W-V5 · LGXXXN1K-V5 · LGXXXN2T-V5 · LGXXXN1C-N5 · LGXXXQ1C-N5 · LGXXXQ1K-N5 · LGXXXN1K-L5 · LGXXXN2W-L5 · LGXXXN2T-L5 · LGXXXN1W-L5 · LGXXXN1T-L5 · LGXXXA1C-V5 · LGXXXA1K-V5 · LGXXXM1C-N5 · LGXXXM1K-L5 · LGXXXQ1C-A6 · LGXXXQ1K-A6 · LGXXXQAC-A6 · LGXXXQAK-A6 · LGXXXN1C-A6 · LGXXXN1K-A6 · LGXXXN2W-E6 · LGXXXN2W-E6.AW5 · LGXXXN2T-E6 · LGXXXN1K-B6 · LGXXXQ1C-A6 · LGXXXQ1K-A6 · LGXXXQAC-A6 · LGXXXQAK-A6 · LGXXXN1C-A6 · LGXXXN1K-A6 · LGXXXN2W-E6 · LGXXXN2W-E6.AW5 · LGXXXN2T-E6 · LGXXXN1K-B6 · LGXXXA1C-A6 · LGXXXM1C-A6 · LGXXXM1K-A6 · LGxxxN16-E6

T UL/NRTL Listed Longi Modules: · LR6-72-xxxM (xxx=320-350) · LR6-72HV-xxxM (xxx=320-350) · LR6-72BK-xxxM (xxx=320-350) · LR6-72PE-xxxM (xxx=340-380) · LR6-72PH-xxxM (xxx=340-380) · LR6-72PB-xxxM (xxx=340-380) · LR6-72HPB-xxxM (xxx=360-385) · LR6-60-xxxM (xxx=270-300) · LR6-60HV-xxxM (xxx=270-300) · LR6 -60BK-xxxM (xxx=270-300) · LR6-60PE-xxxM (xxx=280-320) · LR6-60PH-xxxM (xxx=280-320) · LR6-60PB-xxxM (xxx=280-320) · LR6-72BP-xxxM · LR6-60BP-xxxM · LR6-72HBD-xxxM · LR6-60-xxxM · LR6-60BK-xxxM · LR6-60PE-xxxM · LR6-60PB-xxxM · LR6-60PH-xxxM · LR6-60HPB/HIB-xxxM · LR6-60HPH/HIH-xxxM · LR6-72-xxxM · LR6 -72BK-xxxM · LR6-72HV-xxxM · LR6-72PE-xxxM · LR6-72PB-xxxM · LR6-72PH-xxxM · LR6-72HPH/HIH-xxxM · LR6-72BP-xxxM · LR6-72HBD/HIBD-xxxM · LR6-60BP-xxxM · LR6-60HBD/HIBD-xxxM · LR4-60HPH/HIH-xxxM · LR4-60HPB/HIB-xxxM · LR4-72HPH/HIH- xxxM · LR4-72HBD/HIBD-xxxM · LR4-72HBD/HIBD-xxxM
T UL/NRTL Listed Lumos Modules: · LSxxxx-60M-B/C
T UL/NRTL Listed Luxor Solar Modules: · Lx-xxxP · Lx-xxxM

19

Compatible Modules continued

K2’s CrossRail System was tested with the following:

T UL/NRTL Listed Solaria Modules:

· PowerxT® -xxxR-PD

T UL/NRTL Listed Mission Solar Modules:

T UL/NRTL Listed REC Modules:

· PowerxT® -xxxR-BD

· MSExxxSB1J

· RECxxxTP2 BLK2

· MSExxxSO5T

· RECxxxTPS 72

· MSExxxSO4J

· RECxxxTP2S 72 XV

T UL/NRTL Listed Solarworld Modules

· MSExxxSQ6S

· RECxxxTP2SM 72 XV

“Sunmodule”:

· MSExxxSO6J

· RECxxxTP2SM 72

· Plus SW XXX Mono

· MSExxxSQ4S

· RECxxx NP

· MSExxxSQ5T

· RECxxx NP Black

T UL/NRTL Listed Soluxtec Modules:

· MSExxxSQ5K

· RECxxxAA

· FR xxx Wp

· MSExxxSQ8T

· RECxxxAA Black

· Power Slate 54 Mono Dark Series

· MSExxxSQ8K

· RECxxxTP4

· Power Slate 54 Mono Series

· MSExxxSQ9J

· RECxxxAAPure

· MSExxxSQ9S

· RECxxxTP4Black

T UL/NRTL Listed SunPower Modules:

· MSExxxSR8T

· SPR-E19-xxx

· MSExxxSR8K

· SPR-E20-xxx

· MSExxxSR9S

T UL/NRTL Listed Sanyo Electric Co Ltd of Pana-

· MSExxxSB1J

sonic Group Modules:

T UL/NRTL Listed Sunpreme Modules:

· MSExxxSX5T

· VBHNxxxSA16

· GxB-xxx

· MSExxxSX5K

· VBHNxxxSA17

· GxB-xxxSM

· MSExxxSX6S

· VBHNxxxSA18

· GxB-xxxSL

· MSExxxSX6W

· VBHNxxxSA16

T UL/NRTL Listed Sunspark Modules:

· MSExxxSX6Z

· VBHNxxxSA17

· SST-275-300M

· MSExxxSX5R

· VBHNxxxSA18

· SMX-250-265P

· VBHNxxxKA01

· SST-xxxM 60 cell

T UL/NRTL Listed Panasonic Modules:

· VBHNxxxKA03

· SST-xxxM 72 cell

· VBHNxxxSA16

· VBHNxxxKA04

· SST-xxxMB 60 cell

· VBHNxxxKA01

· SST-XXXM3B-60/72

· VBHNxxxKA03

T UL/NRTL Listed Seraphim Modules:

· SST-XXXM3-60/72

· VBHNxxxKA04

· SEG-XXX-6MA-HV

· SST-XXXM3B-60/72

· VBHNxxxSA17

· SEG-XXX-BMA-HV

· VBHNxxxSA18

T UL/NRTL Listed S-Energy Modules:

· VBHNxxxSA17E

T UL/NRTL Listed Silfab Modules:

· SN15-60PAE/PCE-xxxV

· EVPVxxx

· SLAxxxM

· SN10-60PAE/PBE/PCE-xxxV

· EVPVxxxK

· SLG-M-xxx

· SN15-60MAE/MCE-xxxV

· SLA-x-xxx

· SN10-60MAE/MCE-xxxV

T UL/NRTL Listed Peimar Modules:

· SLG-x-xxx

· SNxxxM-10T(SN60)

· SGxxxP-(BF)

· SIL-xxx BL

· SN15-72PAE/PCE-xxxV

· SGxxxP

· SIL-xxx HL

· SN10-72PAE/PBE/PCE-xxxV

· SGxxxM-(BF)

· SIL-xxx NL

· SN15-72MAE/MCE-xxxV

· SGxxxM

· SIL-xxx ML

· SN10-72MAE/MBE/MCE-xxxV

· SIL-xxx NT

· SN20-60MAE/MBE/MCE-xxxV

T UL/NRTL Listed Phono Solar Modules:

· SIL-xxx BK

· SN25-60MAE/MCE-xxxV

· PSxxxMG-20/U

· SIL-xxx NU

· SC20-60MAE/MBE/MCE-xxxV

· PSxxxPG-20/U

· SIL-xxx NX

· SC25-60MAE/MCE-xxxV

· PSxxxM-20/U

· SIL-xxxHC

· SN20-72MAE/MBE/MCE-xxxV

· PSxxxMH-20/U

· SN25-72MAE/MCE-xxxV

T UL/NRTL Listed Sharp Modules:

· SC20-72MAE/MBE/MCE-xxxV

T UL/NRTL Listed Prism Solar Modules:

· NU-SCxxx

· SC25-72MAE/MCE-xxxV

· Bi48 xxx Bifacial

· NU-SAxxx

· SD25-60BDE-xxxV

· Bi60 xxx Bifacial

· SD25-72BDE-xxxV

20

T UL/NRTL Listed Talesun Modules · Hipro TP660M-xxx · Hipro TP672M-xxx
T UL/NRTL Listed Trina Solar Modules: · TSM-xxxDE14A · TSM-xxxDD05A.08 · DUOMAX SPECS 1. PEG14 · DUOMAX SPECS 2. PEG5 · DUOMAX SPECS 3. PEG5.07 · DUOMAX SPECS 4. PDG5 · TSM-DE15H(II) · TSM-DE15M(II) · TSM-DD06M.05(II) · TSM- DD06H.05(II) · TSM-DD06M.t5(II) · TSM-DD06H.T5(II) · TSM-PE15H · TSM- DEG15HC.20(II) · TSM-DEG15MC.20(II) · TSM-DEG6HC.20(II) · TSM-DEG6MC.20(II) · TSM-xxxDE15V(ll) · TSM-xxxDE19 · TSM-xxxDEG15VC.20(ll) · TSM-xxxDEG19C.20
T UL/NRTL Listed V Energy Modules: · Series 200 PV
T UL/NRTL Listed Yingli Solar Modules: · YL-xxxP-29b · YL-xxx-35b
21

Notes
22

Notes
23

We support PV systems
Formerly Everest Solar Systems
Thank you for choosing a K2 mounting system.
Systems from K2 Systems are quick and easy to install. We hope these instructions have helped. Please contact us with any questions or suggestions for improvement. Our contact info: T k2-systems.com/en-US/contact T Telephone: +1.760.301.5300
K2 Systems 4665 North Ave, Suite I Oceanside, CA 92056 USA +1.760.301.5300 [email protected] www.k2-systems.com
Splice Foot Assembly EN V2 | 1221 · Subject to change · Product illustrations are exemplary and may differ from the original.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

K2 Systems User Manuals

Related Manuals