OUTDOOR ESSENTIALS 14787 Haven 2×4 Cedar Elevated Planter Instruction Manual
- May 15, 2024
- Outdoor Essentials
Table of Contents
OUTDOOR ESSENTIALS 14787 Haven 2×4 Cedar Elevated Planter
Product Specifications
- Dimensions: 45-1/2 in. L x 24 in. W x 31-3/4 in. H
- Materials: Vinyl, Wood
- Includes: Legs, Filler Strips, Panel Boards, Floor Boards, Caps, Liner, Adhesive
Product Usage Instructions
Pre-Assembly Preparation
Before starting assembly, ensure you have all the parts listed in the manual and the recommended items like work gloves and a rubber mallet.
Assembly Steps
Step 1: Attaching Filler Strips to Legs
Snap short and long filler strips into the legs. Apply vinyl adhesive to secure the short filler strips in place.
Step 2: Creating Shelf Base
Slide boards with cleats into the legs to create the shelf base.
Use a rubber mallet if needed to tap in the boards.
Step 3: Adding Medium Filler Strips
Snap medium filler strips into legs and adjust so they are resting on top of the boards from Step 2.
Step 4: Creating Planter Bed Base
Slide remaining boards with cleats into legs to create the planter bed base.
Step 5: Adding Side and End Boards
Slide side and end boards into legs as shown in the manual.
Step 6: Placing Bottom Boards
Place bottom boards on cleats to create the planter bed floor and shelf. Note that there will be small gaps between the boards for drainage.
Step 7: Completing the Planter
Slide post caps onto legs to finish the planter assembly.
Post-Assembly Care
Fill the planter with approximately 5-1/2 cubic feet of soil. Allow the adhesive to dry for 24 hours before adding soil to ensure proper setup.
Frequently Asked Questions
Q: How much soil is needed to fill the planter?
A: Approximately 5-1/2 cubic feet of soil is recommended to fill the planter.
Q: How long should I wait before adding soil after assembly?
A: It is recommended to wait 24 hours to allow the adhesive to fully dry before adding soil to the planter.
PARTS LIST
ASSEMBLY
Read through all steps before beginning assembly.
- Snap short and long filler strips (B/D) into the legs (A) as shown.
Short filler strips (B) should be placed flush with bottom of legs on adjacent sides.
- Slide boards with cleats into the legs as shown to create shelf base.
- Snap medium filler strips into legs and adjust so they are resting on top of the boards from Step 2.
- Slide remaining boards with cleats into legs as shown to create planter bed base.
- Slide side and end boards into legs as shown.
- Place bottom boards on cleats to create the planter bed floor and shelf.
Note: Boards will have small gaps in between them to allow for drainage.
- Slide post caps onto legs to complete the planter.
THE DIAGRAMS AND INSTRUCTIONS IN THIS BROCHURE ARE FOR ILLUSTRATION PURPOSES ONLY AND ARE NOT MEANT TO REPLACE A LICENSED PROFESSIONAL. ANY CONSTRUCTION OR USE OF THE PRODUCT MUST BE IN ACCORDANCE WITH ALL LOCAL ZONING AND/OR BUILDING CODES. THE CONSUMER ASSUMES ALL RISKS AND LIABILITY ASSOCIATED WITH THE CONSTRUCTION OR USE OF THIS PRODUCT. THE CONSUMER OR CONTRACTOR SHOULD TAKE ALL NECESSARY STEPS TO ENSURE THE SAFETY OF EVERYONE INVOLVED IN THE PROJECT, INCLUDING, BUT NOT LIMITED TO, WEARING THE APPROPRIATE SAFETY EQUIPMENT. EXCEPT AS CONTAINED IN THE WRITTEN LIMITED WARRANTY, THE WARRANTOR DOES NOT PROVIDE ANY OTHER WARRANTY, EITHER EXPRESS OR IMPLIED, AND SHALL NOT BE LIABLE FOR ANY DAMAGES, INCLUDING CONSEQUENTIAL DAMAGES.
©2023 UFP Retail Solutions, LLC. Outdoor Essentials is a registered trademark
of UFP Industries, Inc. All rights reserved.
2801 East Beltline NE, Grand Rapids, MI 49525
844-529-5882 14787_3/23
OutdoorEssentialProducts.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>