TENTANDTABLE BT-FWAST126 West Coast Frame Tent Instruction Manual

May 15, 2024
TENTANDTABLE

TENTANDTABLE BT-FWAST126 West Coast Frame Tent

TENTANDTABLE BT-FWAST126 West Coast Frame Tent

DIMENSION

Dimension

West Coast Frame Tent (OVERVIEW)

Pole and Bar Diameter:

West Coast Frame Tent \(Overview\)

West Coast Frame Tent \(Overview\)

West Coast Frame Tent (SPECIFICATIONS: 15×15)

Width 15 ft. / 4.6m
Length 15 ft. / 4.6m
Area 225 ft² / 21.2m²
Eave Height 7′ / 2.1m (opt. 8’/ 2.4m)
Overall Height 10′ 9″/ 3.3m (opt. 11.75’/ 3.6m)
Pitch 3′ 9″ / 1.1m
Complete Weight 193 Lbs./88 Kg. (197 Lbs./89 Kg.)
Series West Coast
Class Frame
Center Pole No
Style / Shape Traditional Tent
Expandable No (sectional tops only)
Custom Printing
Available Yes
Fabric Material PVC Coated Polyester
Fabric Material Weight 16 oz. / yd2 / 540 gsm
Fabric Translucency Block-out
Water Repellency Waterproof
Snow Load None
Flame Resistant Yes
UV Resistant Yes
Mold and Mildew
Resistant Yes
Frame / Pole Material Aluminum
Longest Component 14’4″ / 4.4m
Persons required for setup 2–3
Occupancy 23 Sit Down Dinner

38 Cathedral Seating

STEP 1 CHECK ITEM LIST (15ft. x 15ft.)

Item| Illustration (all parts available for replacement)| Size| Quantity
---|---|---|---
Hip Rafters (yellow/red)| Check Item List

SKU: BT-FWAST126

| 15×15| 4
Rafters (green/red)| | | None
Spreaders (white/red)| Check Item List

SKU: BT-FWAST172

| 15×15| 4
Leg Poles (black) /
Base Plates| Check Item List

SKU: BT-FWBP

SKU: BT-FWBP

| 15×15| 4
Corner Fittings|

SKU: BT-FWCRN

| 15×15| 4
Side Tee Fittings| | | None
6-Way Crowns| | | none
8-Way Crowns| | | none
Ridge Crowns| | | none
(Crowns)|

4-WAY CROWN SKU: BT-FW4WC

| 15×15| 1
Rope- 12ft.,
w/ loop| Check Item List

SKU: BT-TAROPE

| 15×15| 4
‘R’ Pins|

SKU: BT-FWRP25

| 15×15| 24
Single Head Stakes
(3/4˝x 30˝)|

SKU: BT-34SH30

| 15×15| 4
Canopy Top| Check Item List

SKU: BT-34SH30

| 15×15| 1
(see appendix for more info)
This item is very important in the process, Frame Tent Jack (sold separately).
Some West Coast Frame tents require frame tent jacks—and larger tents require multiple jacks.
General rules are; work on the long side, one side at a time, and never place jack in the middle of a spreader bar.
(set-up and use can be found on internet)Check Item
ListSKU: WCF-JACK-12| Tent Size| Estimated Quantity| Recommended Tools
---|---|---|---
10 x 10| none|

  • 6ft. step ladders
  • Sledge Hammer
  • Tape Measure
  • Work boots
  • Stake Driver
    (for larger tents)

Check Item List

SKU: K-DE-D25980K

10 x 20| none
15 x 15| none
15 x 30| 2
20 x 20| none
20 x 30| 2
20 x 40| 3
20 x 60| 4

WARNING

Tent products are manufactured for use as temporary structure and do not meet structural code, unless specified. Since weather is unpredictable, the customer must incorporate their own good judgment, common sense & knowledge of local conditions with the installation instruction guidelines.
The customer is responsible to anticipate weather severity for proper time and method of construction.

BEFORE YOU DIG

(hammer stakes)

By Law you are required to contact your local “Call before you dig” number before you plan to dig. After calling, your local utility company will mark the location of underground utility lines. Laws from state to state vary on how far in advance you must call.
Planning ahead and checking with your state’s program is always a smart idea. Failure to obtain a line location before digging can result in a substantial fine. Please find your local “call before your dig number” by going to call811.com.

  • When building or assembling anything above shoulder height, wear a hard hat

  • Steel toe boots are recommended

  • Inspect the site, look for overhead and underground obstructions— such as utilities

  • Call your local utility to have utility lines marked (call 3–5 days ahead)— call811.com is a good resource— ‘click’ 811 in Your State

  • Inspect all ropes and tie lines

  • Inspect poles, making sure there are no bends or breaks

  • Replace or repair any items in poor condition.
    Before You Dig

  • Place all tent poles and fittings on the ground in the location you have selected for the finished tent

  • This layout is illustrates a 20 x 40 tent see (appendix A) for your specific size, layout and pole sizes
    1) Start with the crown and its connecting poles—the drawing shows the correct postion of the crown—secure these parts using 
    2
    ) ‘R’ pins per pole

  • See (figure A.) for ‘R’ pin usage
    Before You Dig

  • Stand these two end assemblies up, to connect the ridge parts next
    Before You Dig

  • All connection will be made using this method—2 pins needed

  • Insert a pin, halfway, into the alignment hole—this will act as stop, for spreader and rafter bars

  • Slide pole (spreader, rafter etc.), onto the appropriate connector—touch the alignment pin, as a guide

  • The pin holes are now lined up—insert the second ‘R’ pin, all the way, until it locks in place
    Reminder:
    Frame plans and connector positions, for your tent, appear in the appendix
    Before You Dig

  • 2) Connect the ridge line next (15×30 or larger), crowns and spreaders

  • While standing on a ladder(s) make all connections from end to end

  • If you are short of people, use a tent jack to hold horizontal poles 3) Lastly, connect all perimeter bars to the upper spreaders and rafter bars

  • When working around the perimeter, the last connection should be at a corner, not a side tee

  • The frame should now be complete
    Before You Dig

  • Now that the frame portion is complete and while the frame is still on the ground, double check the ‘R’-pins

  • Also, with plenty of hands on deck, lift and adjust frame position if needed, at this point

  • Always lift at a side or corner fitting
    Before You Dig

  • While frame is still on the ground, tie anchor ropes to the frame

  • The ropes will be secured to the tent stakes at the end of the assembly

  • One rope per leg pole

  • The ropes go under and over, to prevent them from sliding away from leg— see (drawing)
    Note: this step can occur after the leg poles have been installed and the frame is elevated
    Before You Dig

  • Once again, while frame is still on the ground, lay down a tarp(s), to protect canopy—arrange canopy along one of the long sides of the tent

  • Place a ladder(s) next to ridge spreaders —as many as it takes to easily to pull canopy over ridge

  • One person needed for every 10ft of tent
    1) In unison, pull canopy up one side ‘flapping’ in the beginning, to create lift then stop
    2) Have most people stay on the ground, and a couple people on ladders—pull canopy over the ridge
    3) Pull down the other side—’flapping’ for all three steps
    Before You Dig

  • After canopy is pulled over frame and and corners are pulled into position, velcro corner seams together, loosely— tighten after legs are installed

  • The canopy should be attached to the frame, before legs are connected— secure some of the spring buckle straps, to keep canopy in place— start near corners and center fittings

  • Spring buckle straps are located on the underside of canopy

  • Secure the remaining straps after legs are installed on one side and secure— it’s easier at this height— Final tightening happens after legs are installed (step 10)
    Before You Dig

  • Before the tent is raised, prepare the leg poles

  • Place poles on top of base plate and secure with ‘R’ pins

  • Do this for all the leg poles
    Before You Dig

  • For smaller tents, (10×10, 10×20, 15×15, 20×20) three or four people should be able to raise the frame and install the leg poles

  • Locate one of the long sides of the frame—this will be raised first, while the opposite side remains on the ground

  • Important: Lift the entire side of the frame at once (not one corner)

  • Install all the legs on this side—secure with ‘R’ pins—

  • Repeat for opposite side, then install legs for the remaining two sides

  • Double check the canopy corners—pull them down tight and straight

  • Important: tighten spring buckle straps— for security and to help pull canopy corners into place
    Before You Dig

  • For larger tents, (15×30 and larger) frame tent jacks should be used to raise the frame and install the leg poles

  • Locate one of the long sides of the frame—this will be raised first, while the opposite side remains on the ground

  • Important: Lift the entire side of the frame at once (not one corner)—crank jacks in unison General rules are; work on the long side, one side at a time, and never place jack in the middle of a spreader bar

  • Install all the legs on this side—secure with ‘R’ pins

  • Repeat for opposite side, then install legs for the remaining two sides

  • Important: tighten spring buckle straps— for security and to help pull canopy corners into place
    Before You Dig

  • Double check leg poles—making sure each pole is straight and lined up correctly, while tent jacks are still handy

  • Once the tent is vertical and all the leg poles are attached, begin the process of staking the tent—with plenty of hands on deck, lift and adjust tent position if needed, first

  • Measure 4 ft. out from each leg pole and place a stake in the ground

  • Stakes should look uniform, around the tent—and 6 inches above ground see (figure B)

  • Stakes should then be hand hammered or for larger installs, use a stake driver
    Before You Dig

  • Ground stakes should be hammered in vertical, not angled (sledge hammer required)

  • Complete the hammering process by driving the stakes in and leaving 6 inches showing

  • Connection of ropes to ground stakes, can be made with a few different secure knots (see figure C, page 8) for one of the more commonly used knots
    Before You Dig

  • As the assembly nears completion it is time to tighten all ropes/ratchet straps

  • Keep an eye any lean that might be caused by the tightening process

  • Go around the tent, make adjustments for any leg pole and tent lean

  • Smaller tents use ropes to secure the tent to the stakes— see (figure C)

  • Finally, secure any remaining spring buckle straps, under the canopy, that were not secured in step 8
    Before You Dig

  • A commonly used knot for securing a rope to stake is the clove-hitch
    1.) Make two loops
    2.) Cross loops by placing second loop over the first
    3.) Place the combined loops over stake
    Option: loops can be form directly on stake
    4.) Pull on both ends to tighten rope
    Note: outward force tightens and inward force loosens the knot—when making adjustments
    5.) Excess line should be pulled half- way up the rope and tied off
    Before You Dig
    Before You Dig

WIND / RAIN / SNOW – IMPORTANT INFORMATION

WIND!

Wind can cause the ratchet assemblies and stakes to loosen, or cause the poles to sink or shift through constant movement and vibration the tension of the tent will be negatively altered.

Follow these steps to provide extra security and safety during windy conditions:

  • Very important, do routine maintenance checks — be sure to check proper tension regarding the ratchet assemblies, throughout the day/event. This is critical, if your tent must stay up, in moderate windy conditions.
  • In the case of strong winds, remove any sidewalls. This will allow the wind to pass through the tent, diminishing major upward pressure on the tent top.
  • Additional security can be achieved by adding additional stakes and ropes/straps to corners— and to the ‘wind side’ of the tent.
  • When anticipating windy conditions, perform a soil test to determine proper staking:
    1. drive a large steel stake approx. 20 in. into soil, vertically
    2. measure the distance from the ground to the top of stake
    3. with a 16lb. sledge hammer, strike stake with an average blow (don’t over hit)
    4. measure the movement/hold strength: (0.2in./2500lbs) (0.3–.5in./1600lbs) (0.6–1.5in./800lbs) (1.6–3in./400lbs) (3–6in./200lbs) (> 6in./100lbs) Double or triple staking might be necessary, 10in. behind primary stake **(see figure D).

** [search web for: tent. IFAI tent staking handbook for detailed information]

  • When SEVERE WEATHER is approaching, the TENT SHOULD BE EVACUATED— and TAKEN DOWN!
  • Proper Setup Note:
    Make sure all poles are vertical and form a ‘squared up’ rectangle. (30 wide and larger: use a Mason’s string — attach at the base of one corner pole, go around all 4 corners to form a box. Tighten the string — then align all side poles by having them touch the string). Proceed by bringing these poles vertical and applying proper tension to each strap — start at the middle of one of the short sides (2 people, same speed) and work around the tent, ending with the middle of the other short side (see figure E). The person on the ‘wind side’ goes first. Lastly, re-check the corner poles.

RAIN

When rainwater collects on the tent canopy it causes ‘ponding’— occurring in heavy weather conditions. If the tent is not tensioned correctly, this issue will be made worse. Additional weight from the water will cause the tent to sag — this may cause the poles and base plates to sink into the soil. In addition, water saturated soil will cause the stakes to lose their holding power. When you combine loosened stakes, added weight on the canopy and reduced tension on ratchet assemblies, the structure becomes a safety hazard. IT IS THE TENT OWNERS RESPONSIBILITY TO ASSURE THE SAFETY OF ALL INVOLVED.

SNOW WARNING: As weather can be unpredictable, the installer/end user must incorporate sound judgment regarding weather conditions. The owner is responsible for anticipating weather severity for safe usage. We do not recommend leaving our event tents set up in windy or adverse weather conditions. Do not allow WATER or SNOW to accumulate on your tent top , as this weight can destroy the tent fabric, reduce the holding power of stakes, or collapse the tent. Tents, canopies and temporary shelters are not designed to carry any type of snow load. These products should not be used if snow of any kind is present, and must be evacuated immediately.

STRIKE PROCEDURE

(basically, reverse order from assembly)

  1. Undo ratchet strap assemblies/untie ropes
  2. Unfasten spring buckle straps, under canopy
  3. Remove leg poles, on one long side (use tent jacks for larger tents)
  4. Remove adjacent center, leg poles, on short sides
  5. Lower first long side to the ground
  6. Repeat, remove leg poles, on remaining long side
  7. Lower rest of frame to ground
  8. Lay tarp next to a long side of frame
  9. Loosen canopy corners
  10. Slowly slide canopy off frame flapping, in unison, as you go
  11. Fold and bag canopy (dry canopy)
  12. Disassemble poles and connectors
  13. Remove ground stakes

Folding Canopy:

  • Fold to center
    Strike Procedure

  • Fold those halves to center
    Strike Procedure

  • Roll tightly
    Strike Procedure

  • Release handle, crank until slot is pointing up

  • Close handle

  • Pass strap underneath and through the slot (as shown)

  • While holding the whole strap assembly attach both ends (eg. tent to stake)

  • Remove slack, before tightening

  • Push ‘release’— lift handle and tighten ratchet

  • Roll-up any excess strap, put under handle

  • Close handle
    Strike Procedure

Appendix A.

  • Tent Plan— showing details (spreader/rafter reference below)
    Strike Procedure

(example, not size specific)
Strike Procedure

Logo

Documents / Resources

| TENTANDTABLE BT-FWAST126 West Coast Frame Tent [pdf] Instruction Manual
BT-FWAST126 West Coast Frame Tent, BT-FWAST126, West Coast Frame Tent, Coast Frame Tent, Frame Tent
---|---

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals