sg Zip 230V Moveable Power Connector Instruction Manual

May 15, 2024
sg

sg Zip 230V Moveable Power Connector

sg-Zip-230V-Moveable-Power-Connector-product

Specifications

Certifications CE, UK
Voltage 220-240V
Current Max 10A

Product Installation Information

  1. Ensure the power is off before installing.
  2. Strip the cable according to the specifications: 0.5 – 1.0 mm² cables should have 8 mm stripped off, and 1.5 – 2.5 mm² cables should have 12 mm stripped off.
  3. Connect the cables to the corresponding ports, ensuring that the installation is done at an angle of approximately 10° (max. 20°).
  4. Secure the connector, following the depicted sequence: first the bottom part (1), then the top part (2), followed by the side screws (3), and finally the cover (4).

Warning:  The installation should be carried out by a certified electrician. It is the user’s responsibility to ensure electrical, mechanical, and thermal compatibility between the track system and luminaires attached to it.

Important Notes

  • Do not install or maintain while the power is on.
  • Installation and maintenance must be done by a certified electrician.
  • Ensure compatibility between the track system and attached luminaires.

FAQ

  • What is the voltage specification for the Zip 230V Moveable Power Connector?
    • The Zip 230V Moveable Power Connector operates at a voltage of 220-240V.
  • Who should install the Zip 230V Moveable Power Connector?
    • The connector should only be installed and maintained by a certified electrician.
  • What should be ensured before installing the connector?
    • It is crucial to ensure the power is off before installing and to verify the electrical, mechanical, and thermal compatibility between the track system and the luminaires that will be attached to it.

Installation Instructions

sg-Zip-230V-Moveable-Power-Connector-fig-2 sg-
Zip-230V-Moveable-Power-Connector-fig-3

sg-Zip-230V-Moveable-Power-Connector-fig-4

  • Only to be installed and maintained by an authorized electrician.
  • Turn off power before installing.
  • It is the user’s responsibility to ensure electrical, mechanical and thermal compatibility between the track system and luminaires attached to it.

Specification

  • 220-24OV, Max 10A

Contact Information

Norway

Sweden

Denmark

Germany

Finland

United Kingdom

Benelux

International

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

sg User Manuals

Related Manuals