FLEURCO BTLY6631 LYS Rectangular Free Standing Solid Surface Soaking Bathtub User Guide

June 17, 2024
Fleurco

FLEURCO BTLY6631 LYS Rectangular Free Standing Solid Surface Soaking Bathtub

FLEURCO BTLY6631 LYS Rectangular Free Standing Solid Surface Soaking
Bathtub

Read all instructions carefully before proceeding.
Record the serial number on the back page and save this guide for future reference.

THANK YOU

We can assure you that FLEURCO has used the best materials and has applied the strictest quality control measures to ensure that each and every unit meets the highest quality standards. This booklet contains general informations about the unit as well as step-by-step installation instructions.

BEFORE BEGINNING

  • Carefully read the instructions before beginning the installation.
  • Observe all local plumbing and building codes.
  • To protect the unit during installation, we recommend that you lay a piece of cardboard underneath the bathtub.
  • Place the unit in the bathroom before you start working. If the unit is covered with a polyethylene protective film, do not remove it until the installation is complete for maximum protection. However, remove film where two surfaces will be in permanent contact.
  • It is strongly recommended that this installation be performed by a professional plumber or contractor.
  • A minimum of three people are needed to perform this installation.
  • Provide a minimum of 1800 lbs (816.5 kg) floor support under the bathtub.
  • The bathtub is designed for a freestanding installation only

WARNING !

DO NOT SIT ON THE LEDGE OF THE BATHTUB
This may cause serious injury. FLEURCO is not responsible for defects and/ or problems incurred under these circumstances.
Warning

TOOLS AND MATERIALS REQUIRED

  • Level
    Tools And Materials Required

  • Tape measure
    Tools And Materials Required

  • Pencil

  • Silicone
    Tools And Materials Required

COMPONENT IDENTIFICATION

Component Identification

# Part Qty
1 Bathtub 1
2 Overflow 1
3 Drain Assembly 1
4 1½” Tailpiece 1
5 Adjustable leveling feet 4

SPECIFICATIONS

Model| A| B| C| D| E| F| G| H| I| J| K| L
---|---|---|---|---|---|---|---|---|---|---|---|---
BTLY6631| 66 1/2″ 169cm| 33 1/4″ 84.5cm| 31″ 79cm| 15 1/2″ 42cm| 23 1/4″ 59cm| 16″ 40.5cm| 116°| 35 7/16″ 90cm| 47 1/4″ 120cm| 20 7/8″ 53cm| 18 1⁄2” 47cm| 22 1/16” 56cm

Dimension

BATHTUB INSTALLATION

  1. LEVELING
    Before the unit is in position, ensure your floor is leveled for proper draining.
    The floor must be able to support the bathtub and person, when filled.
    Bathtub Installation

  2. PLUMBING
    Install all plumbing and drainage before securing the unit. It is always recommended to have a competent, professional plumber to do the plumbing installations. Before drilling a hole in the floor for the drainpipe, make sure there are no hidden elements underneath (pipes, floor joists, heating ducts, electrical wires, etc.).

  3. SPACE VERIFICATION
    Bathtub should be placed at least 1/2 inch (12.7mm) away from walls.
    For bathtub dimensions refer to page 3.
    Bathtub Installation

  4. TUB PREPARATION
    Turn bathtub upside down and rest it on a blanket, cardboard, or other soft surface to prevent scratching the rim.Use caution when turning the bathtub upside down as the product is heavy and may require assistance to rotate.
    Bathtub Installation

  5. ATTACH TAILPIPE WHILE TUB IS FLIPPED.
    Apply teflon tape or silicone to the threaded area of the tailpiece.
    Bathtub Installation

  6. LEVEL ADJUSTABLE FEET OF THE TUB
    Place a level across the bottom of the tub to represent floor level. Raise adjustable leveling feet to touch the level. Then, raise the supports an additional 3/16” to ensure the bathtub is supported by the support feet and not by the tub’s bottom edge.
    Bathtub Installation

  7. CONNECTING TO THE WASTE OUTLET
    Return and align the tub drain tailpiece into the waste outlet to connect.
    Proceed to fasten the tailpiece.
    Bathtub Installation

  8. OBLIGATORY TEST
    The bathtub must be tested before installation is completed. Fill the tub to the overflow and inspect it for leaks.
    Tighten any loose connections.
    Bathtub Installation

  9. APPLY A SILICONE SEAL AROUND THE BOTTOM OF THE BATHTUB
    Bathtub Installation

  10. CLEANING
    Now that the tub is installed, clean up the surrounding area to ensure that no sharp pieces are around to cause any injuries.
    Bathtub Installation

MAINTENANCE

In order to protect the surface of your tub, never use scouring powder, pads or other strong solvents.
Only clean it with a mild detergent diluted in water.
Test products on a small inconspicuous surface prior to use.
Use a melamine foam sponge to clean.

TROUBLESHOOTING

Water accumulates around the drain and the bathtub does not empty completely.

  • Check that the installation is level and that the bathtub sits firmly on its base. Shim if necessary.

SAFETY

  • DANGER ! Do not permit children to use bathtubs unless they are closely supervised by an adult at all times.
  • Bathtubs are heavy. Do not risk personal injury; get sufficient help to carefully lift or move your bathtub.
  • Use this bathtub only for its intended purpose as described in this manual. Do not use attachments not recommended by the manufacturer.
  • Never use or handle electrical devices while in or near a filled bathtub.
  • Never drop or insert any objects into any of the bathtub openings.

Save this manual for future reference

Purchase date

Paste packaging label or note the PO number that you can find on the box or under the product.

MULTIPLE PEOPLE REQUIRED


Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals