RULON 810 Endure Linear Installation Guide
- June 17, 2024
- RULON
Table of Contents
- RULON 810 Endure Linear
- Installation Guide
- Tools and Equipment
- Rulon Suspended Endure Linear 810 8” Module Ceiling Install Guide
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
- 810 Ceiling Strips
- 860 Spacers (optional)
- 872 4 Floating trim (optional)
- 875 Expansion Joint (if needed)
- 880 or #885 Carriers
- 890 or #895 Carrier Connectors
- 850S Splicing Material
- 870 Perimeter Trim
- 810 Ceiling Strips
- 860 Spacers (optional)
- 872 4” Floating trim (optional) -#875 Expansion Joint (if needed) -#880 or #885 Carriers
- 890 or #895 Carrier Connectors -#850S Splicing Material
- 870 Perimeter Trim
- 12 Gauge Hanger Wire
- 872 Perimeter Trim may be used for floating conditions if specified. Please
RULON 810 Endure Linear
Specifications
- Product Name: Endure Linear 810 8 Module Suspended Ceiling
- Manufacturer: Rulon
- Model: 810
- Number of Modules: 8
- Installation Guide Revision Date: September 21, 2023
Receipt and Storage
Upon delivery, ensure that all materials are in their original, labeled,
and unopened packages. Store the materials flat and level in a secure
location, preferably in the room where they will be installed. Take care while
handling to avoid damage.
Before You Begin Installation
- Ensure that all necessary tools are available:
- Standard leveling devices
- Hacksaw/Tin snips
- Power miter saw with a reversed fine-tooth blade
- Fast-acting adhesive (avoid getting adhesive on woodgrain)
- Standard contractor’s tools
- Check the ceiling components to ensure that all required items are available:
-
810 Ceiling Strips
-
860 Spacers (optional)
-
872 4 Floating trim (optional)
-
875 Expansion Joint (if needed)
-
880 or #885 Carriers
-
890 or #895 Carrier Connectors
-
850S Splicing Material
-
870 Perimeter Trim
-
- Review the installation guide in its entirety and consult the shop drawings if required for the installation.
- Note that some projects may receive multiple lengths of material to optimize yield and minimize waste. Check the strip location on the drawings.
Installation Guide
Rulon Suspended Endure Linear 810 8” Module Ceiling Install Guide
Receipt and Storage
- All material shall be delivered to the project site in the original, labeled, unopened packages.
- Material shall be stored flat and level in a secure location, preferably in the room in which they are to be installed.
- Care in handling must be exercised to avoid damage.
Before You Begin the Installation
- Ensure that all necessary tools are available (see below)
- Check Ceiling components to ensure all items required are at hand (see Page 2)
- Review this guide in its entirety.Review shop drawings if they are required for the installation.
- Some projects receive more than one length of material to optimize yield and minimize waste. Please be sure to check strip location on the drawings.
If You Need Further Assistance
- If you have any questions, or if you encounter a situation not covered by this installation guide, contact the Rulon Engineering Department.
Tools and Equipment
- Standard leveling devices
- Hacksaw/Tin snips
- Power miter saw w/ reversed fine tooth blade.
- Fast acting Adhesive
- (NOTE: Take care not to get Adhesive on Woodgrain
- Standard Contractor’s tools
Ceiling Components: Supplied by Rulon
-
810 Ceiling Strips
-
860 Spacers (optional)
-
872 4” Floating trim (optional) -#875 Expansion Joint (if needed) -#880 or #885 Carriers
-
890 or #895 Carrier Connectors -#850S Splicing Material
-
870 Perimeter Trim
Supplied by others
-
12 Gauge Hanger Wire
- Hanger inserts
- Fasteners, as needed
- Acoustical Blanket
- When specified)
- Fast Acting Adhesive
- Down Struts (As Required)
Rulon Suspended Endure Linear 810 8” Module Ceiling Install Guide
-
Step 1: Perimeter Installation
Establish the ceiling height with laser, water-level, or other appropriate method. Mark location. Install #870 Perimeter Trim at ceiling height with appropriate fastener.
-
Step 2: Carrier Placement (Interior)
Mark carrier locations as specified. Refer to Step 8 for Expansion Joint carrier placement (if required). Carrier spacing should not exceed 2′ [810 mm] O.C. Spacing differs for exterior applications or special conditions such as pools or gymnasiums. (Refer to shop drawings or Rulon Engineering Department). Carriers shall be suspended starting 6″ [152 mm] from one wall, and ending within 6″ [152 mm] of the opposite wall. Carriers shall run perpendicular to the direction of the Endure ceiling strips.
Step 3: Attaching Hangers (Interior) -
Install hanger inserts (i.e., screw eyes, star anchors, or eye pins shot or hammered into] structure or clips attached to beam flanges) at 4’ [1219 mm] O.C. (Interior); 3’ [914mm] O.C.
(Exterior). Hang #12-Gauge wire hangers from the inserts. Hanger wires need to be hung directly from the building structure, unless otherwise covered in the Rulon shop drawings or reviewed and approved by the Rulon Engineering Department. Struts are also utilized on Exterior Ceilings. -
Step 4: Carrier Suspension
-
Hang carriers from ceiling hangers. Level. Interior ceiling carriers are suspended by 12-Gauge Hanger wire on 4’ centers along carrier (unless otherwise denoted on Rulon Shop Drawings)
Step 4E(Exterior): -
For exterior ceiling such as soffits, drive-thrus, etc., wind uplift necessitates the use of down-struts on maximum 3’ centers along carrier. Call Rulon for any questions and refer
to Rulon Shop Drawings if applicable.
-
-
Step 5: Extending Endure Carriers
At junctions between carriers, insert one #890 carrier connector. Attach carrier connector inside carriers as shown. Stagger locations of splice. Note:
Carrier connector is for alignment only. Support carrier as needed near splice. -
Step 6: Ceiling Strip Attachment
Beginning at one wall, connect the #810 Ceiling Strips to the carrier, in sequence. If acoustical blankets are to be installed, they should be placed above the ceiling, as the installation progresses. Light cutouts should also be made as the ceiling is installed.
Note:
It will be necessary to apply downward pressure to the ceiling carriers when snapping strips onto carrier. -
Step 7: Spacer Installation (If needed)
Install #860 spacers between the ceiling strips. Push filler strips between ceiling strips until they snap into place. Refer to project-specific shop drawings for spacer orientation (flat side up or down).
-
Step 8: Ceiling Strip Splices
When it is necessary to continue ceiling strips, align strip ends by placing 1 piece of #851S splice strip inverted, behind the #810 ceiling strips. This should be done on a flat level surface when the strip is installed, prior to the installation of adjacent strips. Fast acting cement shall be used to secure the splice pieces. Ensure adhesive does not contact visible surfaces.
Note: Field cut all strips with a power miter saw. Use a fine-tooth blade for best results. Field check all strips
(INCLUDING FULL LENGTH STRIPS) for a 90-degree cut end. Trim as necessary to ensure flush butt joints. For best results, overlap strips and cut at the same time before splicing two strips together. -
Step 9: Allowance for Expansion
Trim Endure strips at perimeter to allow for expansion and contraction. Dimension ‘A’ varies between ¼” [6 mm] and ½” [13 mm] for an 18’ [5486 mm] long Endure ceiling, depending upon installation temperature. Contact the Rulon Engineering Department for Clarification.
Please use Expansion Joints when required for exterior and pool applications. Please apply the same ¼” [6mm] to ½” [13mm] space to allow for expansion and contraction.
-
Step 10: Ripping a strip
Care should be taken to complete a project with full strips, but if ripping a strip in the field becomes a necessity, refer to the detail to the left for how to secure the final strip. -
Step 11: Optional Floating Trim
872 Perimeter Trim may be used for floating conditions if specified. Please
see detail to the left for installation. Trim furnished in nominal lengths for cutting to fit in field.
-
Step 12: Adjustment, Cleaning, and Repair
- The contractor shall make final adjustments to level or contours.
- Upon completion of the ceiling installation, the contractor shall clean all Endure strips and borders of dirt, dust, grease, oils, fingerprints, etc. using warm, soapy water – followed by a rinse.
- All work that cannot be successfully cleaned and repaired shall be removed & replaced.
REV: September 21, 2023