SALA JJSNL0021ASL-BK X-Large 12 Pack Shoe Storage Box User Manual

June 16, 2024
SALA

SALA JJSNL0021ASL-BK X-Large 12 Pack Shoe Storage Box

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-Box-product-
image

What’s Included

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(1\)

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(2\)

Steps to Assemble

  • Step 1: Fold against the creases to make the box into the shape of straight rectangle.

Tip: Folded into a right-angle rectangle for easy access to the groove of lids.

  • Step 2: Fold inwards four tabs that help each lid click into place.

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(6\)

Tip: The folded tabs are to prevent the lid from falling off.

  • Step 3: Install rear lid first. Slide the shoe box body into the groove of rear lid. You will hear a “click” when finished.

Tip A
Make sure the folded box is the same rectangular shape as the groove.

Tip B
The short side of the rectangle is recommended to be inserted first.

Tip C
When the short side is aligned press the Tab firmly into the Tab Slot.

  • Step 4: Make sure the stacking clips line up on the same side with rear lid, then slide the shoe box body into the groove of front lid. You will hear a “click”when finished.

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(8\)

Tip A
Align the short side of lid with the box body, then press It into the box body.

TipB
Make sure the four folded labs are exactly against the door frame. If not, the shoe boxes will easily pop out.

Steps for Connecting

  • Step1 : Align the installed shoe boxes and place them on the ground.

  • Step 2: Took out the connecting sheets.

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(11\)

  • Step 3: Pinch one side of the Connecting Sheet to bend it and insert it into the corresponding card slot. Then repeat it to insert the other side.

SALA-JJSNL0021ASL-BK-X-Large-12-Pack-Shoe-Storage-
Box-\(12\)

Tips A: We recommend that you install the connecting sheet to the bottom shoe box and the top shoe box. This is enough to secure the shoe box. Tips B: Do not pinch the connecting sheet too hard to prevent damage.

Steps to Stack

Tips: Be sure to install the right shoe box first, so as not to block the installation of the left shoe box.

  • Step 1: Tum the front lid towards you. Then align and insert four small cylinders of upper shoe box to the concaves or the lower box.

  • Step 2: Push the upper shoe box to the right to stack.

  • Step 3: Repeat the above operation to complete the stacking

Steps to Disassemble

Tips: Start to remove from the shoe box on the left.

  • Step 1 : Remove the Connecting Sheet on the top of the shoe box.(As shown in the picture)

  • Step 2: Tum the front lid towards you. Push the upper left shoe box to the left to disassemble.

  • Step 3: After the shoe box is loose, hen lift it up to complete the disassembly.

  • Step 4: Disassemble rear lid first. Press on the folded tab firmly and push it down to slide the box body out of the groove .

  • Step 5: Disassemble the front lid. Open the door first. Press on the folded tab firmly and pull the door frame outward to make the groove wider.

  • Step 6: Push the folded lab down to slide the box body out of the groove while doing step 5.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals