ROCKIT Complete Rail Less Racking System Installation Guide

June 16, 2024
Rockit

Complete Rail Less Racking System

Product Information

Specifications

  • Leveling Range: Slide dependent 3-7 inches
  • North-South Slide Range: 25 year material and workmanship
  • Warranty: 300 series stainless steel, 6000 series aluminum
  • Finish: Black anodization/Mill finish

Components

The RockIt system consists of the following components:

  • RockIt Mount

  • Coupling

  • Skirt & End Cap

  • Comp Roof Attachments

  • Other Roof Attachments

  • Comp Slide & Flashing

  • Smart Slide

  • Lag Screw

  • GF-1 Flashing

  • Smart Screw

  • Flat Roofs: SimpleGrip

  • Standing Seam Roofs: SimpleBlock-U

  • Corrugated Metal Roofs: Steel Slide

  • Tile Roofs: Self-Piercing Screw, Tile Base, Tile Slide, Tile
    Flashing (Flat, S & W)

  • System Accessories: Frame MLPE Mount, Junction Box, Conduit
    Bracket – Comp, Conduit Bracket – Tile

Ratings

  • Fire Ratings: Class A* and B** System Fire Rating

  • Max System Voltage: 1500V

  • Max Fuse Rating: 40A

  • Certification: Conforms to UL STD 2703 and UL SUBJECT
    2703A

  • Markings: Product listing label is located on RockIt Mount

  • Roof Pitch: 0 to 21:12 (0 to 60 degrees)

  • UL 2703 Allowable Design Load Rating: 30 psf downward, 30 psf
    upward and 20 psf lateral

  • Max Module Size: 25.6 sq. ft.

  • Maximum Cantilever: 1/3 of span

  • Maximum Span: 6 ft Landscape, 4 ft Portrait

  • Multiple use Rated Components (Position Independent): RockIt
    Mount, RockIt Coupling & MLPE Module Mount

  • Conforms to UL SUBJECT 2703A

Torque Specifications

  • Smart Screws: N/A
  • Mount: 200 in-lb
  • Coupling: 200 in-lb
  • Steel Slide Screw: N/A
  • MLPE Module Mount: 144 in-lb
  • Ground Lug: N/A
  • RockIt Pedestal Screw: 150 in-lb

Product Usage Instructions

Placement

Before installing the RockIt system, ensure that the placement
meets the following requirements:

  • The roof pitch should be between 0 to 21:12 (0 to 60
    degrees).

  • The maximum module size should not exceed 25.6 sq. ft.

  • Ensure proper clearance for installation and maintenance.

Installation

Follow the steps below to install the RockIt system:

  1. Review the module and any third-party manufacturer’s
    documentation for compatibility and compliance with warranty terms
    and conditions.

  2. Ensure you have the necessary tools listed below:

Tool List

  • Review module and any third-party manufacturer’s documentation
    for compatibility and compliance with warranty terms and
    conditions.

  • WARNING: This product must be installed and used according to
    this written instruction. Any installation or use of this product
    not in accord with or not authorized by this written instruction
    shall void any and all warranties, expressed or implied, on the
    product or the use of the product and may cause failure, property
    damage and personal injury. EcoFasten is not liable for any
    unauthorized use. Install and use only with other EcoFasten
    products to ensure proper fit and function.

Supplemental Guides

For specific installation guides based on different roof types,
refer to the supplemental guides available on the website.

Metal Roofs

For metal roofs, use the appropriate roof attachments, such as
Comp Slide, Smart Slide, Lag Screw, GF-1 Flashing, and Smart
Screw.

Grounding Compatible Modules

For grounding compatible modules, use the Frame MLPE Mount,
Junction Box, Conduit Bracket – Comp, and Conduit Bracket –
Tile.

FAQ

Q: What is the warranty for the RockIt system?

A: The RockIt system comes with a 25-year warranty for material
and workmanship.

Q: What is the maximum system voltage supported by the RockIt

system?

A: The RockIt system supports a maximum system voltage of
1500V.

Q: What is the maximum module size that can be used with the

RockIt system?

A: The maximum module size that can be used with the RockIt
system is 25.6 sq. ft.

Q: What are the torque specifications for the RockIt system

components?

A: The torque specifications for the RockIt system components
are as follows:

  • Mount: 200 in-lb
  • Coupling: 200 in-lb
  • MLPE Module Mount: 144 in-lb
  • RockIt Pedestal Screw: 150 in-lb

COMPLETE RAIL-LESS RACKING SYSTEM

INSTALLATION GUIDE

REVISION DATE: 06/28/23

VERSION: v3.3

ECOFASTENSOLAR.COM

REVISION DATE: 06/28/23 VERSION: v3.3

TABLE OF CONTENTS

INSTALLATION GUIDE

Clicking the page name will take you to that page

TABLE OF CONTENTS

PAGE 01

FEATURES & BENEFITS

PAGE 02

SYSTEM SPECIFICATIONS

PAGE 03

COMPONENTS

PAGE 04

RATINGS

PAGE 05

PLACEMENT

PAGE 06

INSTALLATION

PAGE 08

SUPPLIMENTAL GUIDES

PAGE 17

METAL ROOFS

PAGE 18

GROUNDING COMPATIBLE MODULES

PAGE 19

PAGE 21

PAGE
01

INSTALLATION GUIDE

REVISION DATE: 06/28/23 VERSION: v3.3

FEATURES+ BENEFITS

ROCKIT
The RockIt system conforms to UL 2703 and is the industry’s premier rail-less PV racking system for composition shingle, tile, and metal pitched and flat rooftops. Designed in conjunction with installers, RockIt quickly & easily installs with a single tool. It features an easy-to-position mount alignment and a top-down leveling system. RockIt is logistically intelligent with no need to ship or transport long rails. Components are available in a black finish that compliments both commercial and residential applications.
FEATURES
· Patented Watertight Technology · Fully integrated bonding · Top-down leveling system · North-South adjustability · Single tool install

PAGE
02

INSTALLATION GUIDE

REVISION DATE: 06/28/23 VERSION: v3.3

SYSTEM SPECS

Leveling Range
North-South Slide Range
Warranty

ROCKIT SYSTEM SPECIFICATIONS

3.25″­ 4.5″ above the roof Materials

Slide dependent 3-7 inches
25 year material and workmanship

Finish

300 series stainless steel, 6000 series aluminum
Black anodization/Mill finish

TOOL LIST

Comp Slide & Flashings · 7/32″ Drill bit · ½” Deep-well socket (not thick wall impact) · Chalk line · String line (optional)

Smart Slide · ½” Deep-well socket (not thick wall impact) · 5/16″ Nutdriver for impact with 2″ extension · Chalk line · String line (optional)

PLEASE NOTE: Review module and any third-party manufacturer’s documentation for compatibility and compliance with warranty terms and conditions.

WARNING: This product must be installed and used according to this written instruction. Any installation or use of this product not in accord with or not authorized by this written instruction shall void any and all warranties, expressed or implied, on the product or the use of the product and may cause failure, property damage and personal injury. EcoFasten is not liable for any unauthorized use. Install and use only with other EcoFasten products to ensure proper fit and function.

PAGE
03

REVISION DATE: 06/28/23 VERSION: v3.3

COMPONENTS

INSTALLATION GUIDE

SYSTEM COMPONENTS

ROCKIT SYSTEM
MOUNT

COUPLING

SKIRT & END CAP

COMP ROOF ATTACHMENTS

OTHER ROOF ATTACHMENTS
FIND INSTALLATION GUIDES ON WEBSITE

COMP SLIDE & FLASHING

COMP SLIDE
SMART SLIDE

LAG SCREW

GF-1 FLASHING

SMART SLIDE

SMART SCREW

FLAT ROOFS

SIMPLEGRIP
STANDING SEAM ROOFS
SIMPLEBLOCK-U

COMP SLIDE COMP SLIDE

CORRUGATED METAL ROOFS

STEEL SLIDE
TILE ROOFS

SELF-PIERCING SCREW

TILE BASE

TILE SLIDE

TILE FLASHING
(FLAT, S & W)

SYSTEM ACCESSORIES

FRAME MLPE MOUNT

JUNCTION BOX

CONDUIT BRACKET – COMP

CONDUIT BRACKET – TILE

PAGE
04

REVISION DATE: 06/28/23 VERSION: v3.3

RATINGS

INSTALLATION GUIDE

RATINGS

Fire Ratings

Class A* and B** System Fire Rating

Max System Voltage

1500V

Max Fuse Rating

40A

Certification

Conforms to UL STD 2703 and UL SUBJECT 2703A

Markings

Product listing label is located on RockIt Mount

Roof Pitch

0 to 21:12 (0 to 60 degrees)

UL 2703 Allowable Design Load Rating

30 psf downward, 30 psf upward and 20 psf lateral

Max Module Size

25.6 sq. ft.

Maximum Cantilever

1/3 of span

Maximum Span

6 ft Landscape, 4 ft Portrait

Multiple use Rated Components (Position Independent)

RockIt Mount, RockIt Coupling & MLPE Module Mount

Conforms to UL SUBJECT 2703A

Smart Slide on Steep Slope Asphalt Shingle Roof

Class A System fire rating with Steep and Low Slope Roofs and Type 1, 2, and 29 PV modules with no skirt required. Class A System fire rating with Steep Slope Roofs and Type 4 and 5 modules with south edge skirt required. Any roof-to-module gap is permitted. This rating is applicable with any roof attachment. Class B System fire rating with Steep Slope Roofs and Type 4 and 5 modules, no skirt required. Any roof-to-module gap is permitted. This rating is applicable with any roof attachment. Mounts and couplings cannot be installed on module frames with flanges less than 22mm wide

UL 2703 MARKING EXAMPLE:

ROCKIT SYSTEM
MFG ID CODE: SSS-QQ-YYYY
XXXXXXX

Conforms to UL STD 2703

TORQUE SPECIFICATIONS

Component

Torque (in-lb)

Smart Screws

N/A

Mount

200

Coupling

200

Steel Slide Screw

N/A

MLPE Module Mount

144

Ground Lug

N/A

RockIt Pedestal Screw

150

Notes Fully Seat. Use visual indicator of the black EPDM ring around the bonded washer for torquing.
Fully Seat. Use visual indicator of the black EPDM ring around the bonded washer for torquing.
Refer to specific ground lug manufacturer’s installation manual

System components should be periodically re-inspected for loose components, loose fasteners, and corrosion such that if found, the affected components are to be immediately replaced.

PAGE
05

REVISION DATE: 06/28/23 VERSION: v3.3

PLACEMENT

INSTALLATION GUIDE

SLIDE PLACEMENT

N

N

N

S

S

Max 48′

S Max 72′

Array Skirt

Array Skirt

Y X

Distance Between Rows = Y + 1 5/16″

Distance Between Rows = X + 1 5/16″

STRUCTURAL ATTACHMENT POINTS
· Find the required structural attachment points.
SLIDE SPACING
· Spacing may vary depending upon project specific structural requirements: i.e. high snow and wind load areas may require lesser bracket spacing in the East-West axis vs. the maximum spacing.
· Max spacing is 48″ OC for portrait orientation and 72″ OC for landscape orientation.
· Consult project layout diagram for project specific slide spacing on the roof.
· Install slides to predetermined mount spacing.
ARRAY SKIRT SECTIONS
· Use the array skirt as a guide to lay out module placement.
ROW SPACING
· The distance between the rows of mounts is calculated by the module dimension NorthSouth plus 1 5/16″.
PAGE
06

INSTALLATION GUIDE
SLIDE PLACEMENT
Cantilever

REVISION DATE: 06/28/23 VERSION: v3.3
LAYOUT WITH STAGGERED SLIDES
· To reduce the load on an individual rafter, slides can be mounted in a staggered configuration
· Reference each project layout RockIt Mount
RockIt Coupling
CANTILEVER & OFFSET
· CANTILEVER: Maximum cantilever is 1/3 attachment spacing.
· OFFSET: Offset from all roof edges depends on wind speed, snow loads, local fire and building codes per location.

PLACEMENT

Offset

PAGE
7

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION

INSTALLATION GUIDE

COMP SHINGLE INSTALLATION
COMP SLIDE & FLASHING

1 SNAP LINES
1
Snap chalk lines based on module dims + 1 5/16″ spacing and then locate rafters
2 PILOT HOLE
Drill a 7/32″ pilot hole into the rafter or structural member for the lag screw. Backfill with sealant compatible with the roof type.

2

3 CUT SHINGLE (IF NECESSARY)

To position the slide in the correct location, it is

acceptable to cut out a portion of the shingle

4 INSERT LAG BOLT
· Line up pilot hole with flashing hole. · Using only the EcoFasten provided lag screw*,
insert the lag through the RockIt Comp Slide, the gasketed hole in the flashing and into the rafter.
3
Position the slide with the date stamp facing south. · Torque: The range is between 100-140 inchpounds depending on the type of wood and time of year. The visual indicator for proper torque is when the EPDM on the underside of the bonded washer begins to push out the sides as the washer compresses. If using an impact wrench to
4
install the fasteners be careful not to over torque the fastener. You may need to stop and use a ratchet to finish the install.

  • It is important to only use the lag screws provided by EcoFasten because they have longer thread lengths to increase the pull-out force

PAGE
8

REVISION DATE: 06/28/23 VERSION: v3.3
INSTALLATION GUIDE
COMP SHINGLE INSTALLATION
SMART SLIDE
ARRAY POSITIONING
Use the shingle overlap as your starting position to snap your first chalk line (See image below). We recommend snapping chalk lines at every row to make sure every installation is completed with confidence and easy. After chalk lines have been snapped for each row, being as precise as possible, locate the rafters within the array making sure to follow the span chart and cantilevers. NOTE: For landscape module orientation, the north-south distance between each chalk line is equal to the module width plus 1-5/16″. For portrait, the distance is the module length plus 1-5/16″.

INSTALLATION

Figure 1
PLACING THE SLIDE
Once the general location of each rafter is marked, clean the mounting location with a nylon brush for proper sealing. Before peeling off the release liners, please note the Smart Slide is designed to straddle the two shingle courses. It is important to make sure the bottom foot is flush and pushed up against the shingle course edge above (see figure 1). When you locate the rafter, peel off the two release liners and place the center of the slide over the rafter.
NOTE: Only install on clean roofs free of snow , ice and debris in ambient temperatures between 5º F and 118º F. If installing on Presidential shingles of rare thickness over 1/8″, cut off the shingle tabs to ensure the slide lies flat.

PAGE
9

REVISION DATE: 06/28/23 VERSION: v3.3
INSTALLATION GUIDE
COMP SHINGLE INSTALLATION
SMART SLIDE
SCREW PLACEMENT & DRIVING THE SCREWS
NOTE: Once the slide is in position, it will be difficult to remove cleanly without leaving any sealant on the roof. When rafter mounting, for any screws that miss the rafter, do not remove those screws. Smart Slide is designed to give the installer multiple opportunities to find the rafter. Do not remove any screws that have missed the rafter. Smart Slide is designed to give the installer multiple opportunities to find the rafter making installation quick.
EPDM TORQUE GUIDE

INSTALLATION

CORRECT

INCORRECT

INCORRECT

INCORRECT

LEVEL

TILTED

NOT ENOUGH TORQUE

TOO MUCH TORQUE*

  • If too much torque is used it could damage the EPDM washer. Damaged or blown out EPDM washers should be replaced with a new washer as needed.

PAGE
10

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION

INSTALLATION GUIDE

COMP SHINGLE INSTALLATION
SMART SLIDE
SCREW PLACEMENT – DECK MOUNTED
INSTALLATION When installing direct to the roof deck without regard to rafter locations, all 8 screws must be installed. (Be sure to reference the direct to deck span tables.)
SCREW PLACEMENT – RAFTER MOUNTED
1. INSTALLATION ­ FIRST ATTEMPT Drive screw in Hole B. If a rafter is hit with the first screw, the second screw can immediately be driven through Hole F. No additional screws are needed if the first 2 screws hit the rafter.
2. INSTALLATION ­ SECOND ATTEMPT If the rafter is missed with the first screw as shown below with a red circle, drive a second screw through Hold C. If the rafter is hit with the second screw, the third screw can immediately be driven through Hole G.

HOLE DESIGNATIONS

FIRST ATTEMPT

SECOND ATTEMPT

1

B

A

D

C

2

F

E

H

G

1

2

RAFTER

RAFTER HIT

RAFTER MISS

ATTEMPT NUMBER

3

NOTE: If a rafter is missed completely within the slide, you must add another slide to the previous rafter.

PAGE
11

REVISION DATE: 06/28/23 VERSION: v3.3
INSTALLATION GUIDE
COMP SHINGLE INSTALLATION
SMART SLIDE
SCREW PLACEMENT
3. INSTALLATION ­ THIRD ATTEMPT If the rafter is missed in both Holes B & C, then try Hole A and Hole D. If a rafter is hit through either of those holes, all 8 screws must be installed.
THIRD ATTEMPT
RAFTER RAFTER HIT RAFTER MISS

INSTALLATION

4. INSTALLATION ­ FOURTH ATTEMPT If the rafter is missed completely within the slide, you must add another slide to the previous rafter. You may then continue with your job specific attachement spans.
FOURTH ATTEMPT

PAGE
12

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

COMP SHINGLE INSTALLATION
SMART SLIDE

COMPOSITION SHINGLE INFORMATION

1 SHINGLE BUTT JOINT*
1
2 SHINGLE STEP

3 SHINGLE COURSE

2

*Composition shingles either come in 36″ or

1M length sheets. a butt joint is Where two

adjacent sheets come together in a course.

3
SHINGLE BUTT JOINTS
Apply a bead of roof sealant over any exposed shingle butt joints north (upslope) of a mounting foot. Please reference our approved sealant list posted on our website.

INSTALLATION

PAGE
13

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION

INSTALLATION GUIDE

SYSTEM INSTALLATION

1 MOUNTS & ALIGNMENT
1
· Begin with the row that will get Skirt which is usually the far south row. On the far east and far

west Slides, install a Mount about ½” from the

south end of the Slide. · Tighten side bolts to 200 in-lbs.

· Run a string line across the north edge of the base

of the two Mounts. · Add a Mount to each of the other Slides, position

them up against the string line, and tighten the side bolts to 200 in-bs.

2
2 SKIRT POSITION

· Rotate the top of the Mount so that the long,

stepped shelf is facing north. Depending on the

PV module thickness, use the appropriate A, B, or C Skirt.

· Set the Skirt on the south side of the Mount

as shown. TOP POSITION

40MM A SKIRT

38MM B SKIRT

3

CHANNEL POSITION

35MM A SKIRT 32MM B SKIRT

NOTE: There are ridges inside the small channel on the B Skirt whereas the channel is smooth on the A Skirt.
3 SKIRT TIGHTENING
Tighten top bolt in Mount to secure the Skirt
4
4 SKIRTS END CAPS
Press fit End Caps at every Skirt connection and on the ends.

NOTE: The End Caps makes it easier to align the Skirts and is required for strength.

PAGE
14

INSTALLATION

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

SYSTEM INSTALLATION

5 COUPLINGS ON SKIRTS
5
· Everywhere two modules will meet, install a Coupling on the Skirt with the long, stepped shelf facing north.
· Torque to 200 in-lbs.

NOTE: There must be at least one Mount or one Coupling connecting every Skirt section.

6 ALIGN & STRAIGHTEN SKIRTS

6

(OPTIONAL)

· If the row of Skirts is not straight in the north-south

direction, loosen appropriate side bolts, slide the

Mount and retighten to 200 in-lbs

· If the row of Skirts is not straight in the up-down

direction, adjust the leveling nut inside the Mount

· Align skirts with module edge

7 INSTALL FIRST ROW OF PV MODULES

7

· Place the modules into the first row of Mounts and

Couplings at a 45 degree angle. While applying

pressure against the Mounts and Couplings, lower

the modules until parallel to the roof ensuring the

modules are fully seated.

· Space the modules in the east/west direction ½”

to ¾”.

PAGE
15

INSTALLATION

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

SYSTEM INSTALLATION

9 INSTALL SECOND ROW
9
OF COUPLINGS
· At the intersection of the north side of two modules, install a Coupling with the two bonding pins facing south.
· Coupling can be positioned off center to avoid running into a Mount, but the two bonding pins must clamp different modules.
· Torque to 200 in-lbs.

10

10 INSTALL SECOND

ROW OF MOUNTS

· Lift the modules slightly and install the Mounts

on the Slides to engage the north side of the

module.

· Tighten to 200 in-lbs.

11 LEVELING (OPTIONAL)

& WIRE MANAGEMENT

11

· Before installing next row of modules, level the

row (if needed) by turning the leveling nut.

· Manage wires after each row of modules

is installed (see Tips & Tricks video on wire

management on the EcoFasten website)

12 COMPLETE THE ARRAY
Repeat steps above for all other rows in the array.

PAGE
16

SUPPLIMENTALS

ROOF ATTACHMENTS

REVISION DATE: 06/28/23 VERSION: v3.3
INSTALLATION GUIDE
OTHER INSTALLATION OPTIONS
SUPPLIMENTAL GUIDES
TILE MOUNTING SYSTEM INSTALLATION
Click here to view guide
SIMPLEBLOCK-U INSTALLATION
Click here to view guide
SIMPLEGRIP INSTALLATION
Click here to view guide
TILE CONDUIT MOUNT INSTALLATION
Click here to view guide
CONDUIT MOUNT INSTALLATION
Click here to view guide
FRAME MLPE INSTALLATION
Click here to view guide
J-BOX INSTALLATION
Click here to view guide
PAGE
17

ACCESSORIES

INSTALLATION

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

OTHER INSTALLATION OPTION
METAL ROOFS
The RockIt Steel Slide can be installed on steel trapezoidal, R-panel or PBR roof panels that are at least 26 gage thick and have a flat peak of at least 1/4″ wide. They fasten directly to the metal deck without the need to attach to any substructure.

1 EAST-WEST ROOF MARKING
1
Snap horizontal lines to mark the installation position for each row of Steel Slides. For landscape module orientation, the North-South distance between each chalk line is equal to the module width plus 1 5/16″. For portrait, the distance is the module length plus 1 5/16″.
2
2 STEEL SLIDE POSITIONING
Position the Steel Slides over the chalk lines and over the center of the flat peaks of the metal roof ribs.

3 STEEL SLIDE FASTENING

3

Using only the screws provide by EcoFasten,

drive 4 screws through the holes in the Steel

Slide an into the rook panel. Use a ¼” socket

with a 2″ extension.

*A WATERTIGHT SEAL HAS BEEN FORMED WHEN THE RUBBER ON THE WASHER CREATES A VISIBLE RING AROUND THE SCREW HEAD.

CORRECT

INCORRECT

INCORRECT

INCORRECT

LEVEL

TILTED

NOT ENOUGH TORQUE

TOO MUCH TORQUE*

  • If too much torque is used it could damage the EPDM washer. Damaged or blown out

EPDM washers should be replaced with a new washer as needed.

PAGE
18

REVISION DATE: 06/28/23 VERSION: v3.3

GROUNDING

INSTALLATION GUIDE

BONDING AND GROUNDING

Bonding Path Direction Grounding Lug Equipment Grounding Conductor (EGC) Skirt Bonding Path

HARDWARE RockIt Coupling

RockIt Mount

RockIt Skirt

THERMAL EXPANSION & BONDING
· A thermal expansion gap is required per each continuous 70′ length of modules.
· Omit a coupling and leave a 2″ gap in the RockIt array skirt and also between the modules at that point.
· Bonding across the thermal gap should be accomplished with an approved ground lug for each array and an equipment grounding conductor.

Bonding Path Direction Grounding Lug Equipment Grounding Conductor (EGC) Skirt Bonding Path

HARDWARE RockIt Coupling

RockIt Mount

RockIt Skirt

BONDING PATH & ASSEMBLY
· RockIt mount bonds North-South rows of modules.
· RockIt coupling bonds East-West rows of modules.
· RockIt array skirt is bonded to the array via the RockIt mount.
· One approved ground lug is required per continuous PV array.
· Ilsco SGB-4 Approved for Mounting to Rockit Mount or Rockit Slides as alternate grounding location
PAGE
19

REVISION DATE: 06/28/23 VERSION: v3.3
INSTALLATION GUIDE
BONDING AND GROUNDING
NECESSARY COMPONENTS
One of the following grounding lugs (or any UL 2703 Compliant ground Lug): · Burndy CL50-1TN Ground Lug
(UL2703 – E3514343 / UL 467 E9999) · ILSCO SGB-4 Ground Lug (UL2703 E354420/ UL 467 – E34440) · ILSCO GBL-4DBT (UL2703 E354420 / UL 467 – E34440) · ILSCO GBL-4DBTH (UL2703 E354420 / UL 467 – E34440) · ILSCO GBL-4SS (UL2703 – E354420 / UL 467 – E34440)

GROUNDING

Above: Optional Locations for grounding lug on last row upslope of array
*Equipment grounding wire should be sized in accordance with the National Electrical Code, NFPA70 and a minimum of 1/4″ clearance is required between bare copper wires and aluminum components.

PAGE
20

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

COMPATIBLE MODULES
The Rockit System has been tested and evaluated to UL 2703 for bonding, grounding, mechanical loading and fire classification, and may be used to ground and/or mount PV modules listed to UL 1703 or UL 61730. A list of approved modules is included below.

Unless otherwise noted, “xxx” refers to the module power rating and both black and silver frames are included in the certification.

*Class A System fire rating with Steep and Low Slope roofs and Type 1, 2, and 29 PV modules with no skirt required. NOTE: Modules with flange widths shorter than 22mm cannot be installed in portrait.

TYPE 1, 2 & 29 MODULES

MANUFACTURER Adani
AIONRISE Aptos Solar Astronergy
Solar Auxin
Axitec

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Adani modules with 35 and 40 mm frames ASX-Y-ZZ-xxx Where “X” can be B, M or P, “Y” can be 6 or 7, and “ZZ” can be blank, PERC, B-PERC, or AB-PERC Aionrise modules with 35 and 40 mm frames AIONyyG1-xxx Where “yy” can be 60 or 72 Aptos modules with 35 and 40 mm frames DNA-yy-zzaa-xxx Where “yy” can be 108, 120 or 144; “zz” can be MF or BF; and “aa” can be 10, 23 or 26 Astronergy modules with 35 and 40 mm frames CHSMbbyyC/zz-xxx Where “bb” can be 60, 66, or 72; “yy” can be blank, 10 or 12; “C” can be M, M(BL), M-HC, P, P(BL) or P-HC ; and “zz” can be blank or HV Auxin modules with 40 mm frames AXNYMzYYMxxxB Where “Y” can be 6 , 10 or G1; “z” can be blank or 6; “YY” can be blank, 10 or 12; “B” can be blank, A, B, C or W Axitec Modules with 30 and 35 mm frames AC- xxxY/aaZZ “Y” can be M, P, MH or MBT; and “aa” can be blank, 125 or 156; and “ZZ” can be 60S, 108V, 108VB, 120S, 120V or 120VB

PAGE
21

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

MANUFACTURER Bluesun Solar Boviet
Canadian Solar
CertainTeed Crossroads Solar
CSUN Dehui
ET Solar
Freedom Forever Freevolt Goldi
Grape Solar

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Bluesun modules with 30 and 35 mm frames BSMxxxM-AAA Where “AAA” can be 60HPH or 72HBD Boviet modules with 35 and 40 mm frames BVM66aaYY-xxxBcc Where “aa” can be 9, 10 or 12; “YY” is M, or P; and “B” can be blank, L or S; and “cc” can be blank, H, H-BF, H-HC or HC-BF Canadian Solar modules with 35 and 40 mm frames CSbY-xxxZ Where “b” can be 1, 3 or 6; “Y” can be H, K, L, N, P, R, V or Y; and “Z” can be M, MS, M-SD, MS-HL, MS-SD, P, PX, or P-SD CertainTeed modules with 30, 35 and 40 mm frames CTBBxxxYZZ-AA Where “BB” can be blank or M10; “Y” can be M or HC; “ZZ” can be 00, 10 or 11; and “AA” can be 04, 06, 08 or 09 Crossroads Solar modules with 40 mm frames Crossroads Solar xxx CSUN modules with 35 and 40 mm frames CSUNxxx-zzAbb Where “zz” is 60 or 72; and “A” is M or MM; “bb” is blank or 5BB Dehui modules with 35 and 40 mm frames DH- MYYYZ-xxx Where “YYY” can be 760, 772, 860, 872; and “Z” can be B or W ET Solar modules with 35 and 40 mm frames ET-YZZZxxxAA Where “Y” can be P, L, or M; “ZZZ” can be 660, 660BH, 672, 672BH, or 754BH; and “AA” can be TB, TW, WB, WW, BB, WBG, WWG, WBAC, WBCO, WWCO, WWBCO or BBAC Freedom Forever modules with 35 mm frames FF-MPa-BBB-xxx Where “a” can be blank or 1 Freevolt modules with 35 mm frames ECP-PVGRAF-144HC-xxx Goldi modules with 35 mm frames GS10-B108 -TF-xxx Grape modules with 35 mm frames GS-M120-xxx-FAB1

PAGE
22

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

MANUFACTURER
Hanwha Q CELLS
Heliene HT-SAAE Hyperion Solar (Runergy) Hyundai
Itek

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Hanwha Q CELLS Modules with 32, 35 and 40 mm frames aaYY-ZZ-xxx where “aa” can be Q. or B.; “YY” can be PLUS, PRO, PEAK, LINE PRO, LINE PLUS, PLUS DUO or PEAK DUO; and “ZZ” can be G3, G3.1, G4, G4.1, L-G2, L-G2.3, L-G3, L-G3.1, L-G3y, L-G4, L-G4.2, L-G4y, LG4.2/TAA, BFR-G3, BLK-G3, BFR-G3.1, BLK-G3.1, BFR-G4, BFR-G4.1, BFR G4.3, BLK-G4.1, G4/SC, G4.1/ SC, G4.1/TAA, G4.1/MAX, BFR G4.1/TAA, BFR G4.1/MAX, BLK G4.1/TAA, BLK G4.1/SC, EC-G4.4, G5, G5/SC, G5/TS, BLK-G5, BLK-G5/SC, BLK-G5/TS, L-G5, L-G5.1, L-G5.2, L-G5.2/H, L-G5.3, G6, G6/SC, G6/TS, G6+, G6+/TS, BLK-G6, G7, BLK-G6+, BLK-G6+/AC, BLK-G6+/HL, BLK-G6+/SC, BLK-G6/TS, BLK-G6+/TS, BLK-G7, G7.2, G8, BLK-G8, G8+, BLK-G8+ L-G7, L-G7.1, L-G7.2, L-G7.3, BLK ML-G9, ML-G9+, BLK ML-G9+, ML-G9, BLK-G10+, BLK-G10+/AC, ML-G10, BLK ML-G10, ML-G10+, BLK ML-G10+, ML-G10.a, BLK ML-G10.a, ML-G10.a+, BLK ML-G10.a+, BLK ML-G10 +/t and BLK ML-G10+/TS Heliene modules with 35 and 40 mm frames YYZZxxxA Where “YY” can be 60, 72, 108 or 120; “ZZ” can be HC, M or P; and “A” can be blank, M10-SL, M10-SL-BLK or M10-SL-Bifacial HT-SAAE modules with 35 and 40 mm frames HTyy-aaaZ-xxx Where “yy” can be 60 or 72, “aaa” can be 156 or 166, “Z” can be M, M(V), M(S), M(VS), M-C, M(V)-C, P or P(V) Hyperion modules with 35 mm frames HY-DH108Y8-xxxB Where “Y” can be N or P; and “B” can be blank or B Huyndai modules with 32, 35 and 40 mm frames HiY-SxxxZZ Where “Y” can be A or S; “S” can be M or S; and “ZZ” can be HG, KI, MF, MG, PI, SG, RG, RG (BK), TG or YH(BK) or XG(BK) Itek Modules with 40 mm frames IT-xxx-YY “YY” can be blank, HE, or SE

MODULES

PAGE
23

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

MANUFACTURER JA Solar
Jinko
LG Longi Maxeon Meyer Burger Mission Solar (mSolar) Mitrex

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
JA Solar modules with 30, 35 and 40 mm frames JAyyzz-bbww-xxx/aa Where “yy” can be M, P, M6 or P6; “zz” can be blank, (K), (L), (R), (V), (BK), (FA), (SE), (TG), (FA)(R), (K)(SE), (K)(TG), (L)(BK), (L)(TG), (R)(BK), (R)(TG), (V)(BK), (BK) (TG), or (L)(BK)(TG); “bb” can be 54, 60 or 72; “ww” can be blank, D30, S01, S02, S03, S09, S10, S17, S30 or S31; and “aa” can be MR, SI, SC, PR, RE, 3BB, 4BB, 4BB/RE, 4BB/1500V, PR/1500V, 5BB Jinko modules with 35 and 40 mm frames JKMYxxxZZ-aa Where “Y” can either be blank or S; “ZZ” can be M, P, PP, or -V; and “aa” can be blank, 60, 60B, 60H, 60HB, 60L, 60BL, 60HL, 60HBL, 60-J4, 60B-J4, 60BEP, 60(Plus), 60-V, 60-MX, 72H, 72H-V, 72HL-V, 72HBL-V, 72L-V, 6RL3, 6RL3-B or 6TL3-B LG modules with 40 mm frames LGxxxyaz- bb “y” can be A, E, M, N, Q, or S; “a” can be A, 1, 2 or 3; “z” can be C, K or W; and “bb” can be G4, A5, A6, B6, E6, E6.AW5, L5, N5, v5, V6 Longi modules with 35 and 40 mm frames LRa-YYZZ-xxxM Where “a” can be 4, 5 or 6; “YY” can be 54, 60 or 66 “ZZ” can be blank, BK, PB, PE, PH, HPB, or HPH Maxeon modules with 35, 40 and 46 mm frames SPR-AAAY-xxx-zzz Where “AAA” can be MAX or X; “Y” can be 3, 5, 6, 21 or 22; and “zzz” can be R, BLK or COM Meyer Burger Modules with 35 mm frames Meyer Burger Black, White or Glass Mission Solar modules with 35, 40 mm frames YYYbb-xxxZZaa Where “YYY” can be MSE, TXI or TXS; “bb” can be blank, 6, 10 or 60A; “ZZ” can be blank, SO, SQ, SX, 108, 120 or 144; and “aa” can be blank, BB, BW, 4J, 4S, 5K, 5R, 5T, 8T, 8K, 9R or 9Z Mitrex modules with 30, 35 and 40 mm frames Mxxx-XYZ Where “X” can be A, B, I or L; “Y” can be 1 or 3; and “Z” can be F or H

PAGE
24

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

MANUFACTURER Next Energy Alliance NE Solar
Panasonic (HIT) Panasonic (EverVolt)
Philadelphia Solar
Phono Solar Prism Solar
REC
Recom Renesola

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Next Energy Alliance modules with 35 and 40 mm frames yyNEA-xxxZZ where “yy” can be blank or US; “ZZ” can be M, MB or M-60 NE Solar modules with 30, 35 and 40 mm frames NESExxx-zzMHX-yy Where “zz” can be 54, 60 or 72; “X” can be blank or B; and “yy” can be M6 or M10 Panasonic modules with 40 mm frames VBHNxxxYYzzA “YY” can be either SA or KA; “zz” can be either 03, 04, 17 or 18; and “A” can be blank, E or G Panasonic modules with 30 mm frames EVPVxxxA Where “A” can be blank or H, K, HK or PK Philadelphia modules with 30, 35 and 40 mm frames PS-YzzAA-xxxW Where “Y” can be M or P; “zz” can be 60, 72, 108 or 144; “AA” can be blank, (BF), (HC) or (HCBF); and “W” can be blank or W Phono Solar modules with 30 and 35 mm frames PSxxxY-ZZ/A Where “Y” can be M4, M4H, M5GF, M5GFH, M6, M6H, M8GF or M8GFH; “ZZ” can be 18, 20 or 24; and “A” can be TH, UHB, VH or VHB Prism Solar modules with 35 mm frames PST-xxxW-M72Y Where “Y” can be H, HB or HBI REC modules with 30 and 38 mm frames RECxxxYYZZ Where “YY” can be AA, M, NP, NP2, NP3, PE, PE72, TP, TP2, TP2M, TP2SM, TP2S, TP3M or TP4; and “ZZ” can be blank, Black, BLK, BLK2, SLV, 72, Pure or Pure-R Recom modules with 35 and 40 mm frames RCM-xxx-6yy Where “yy” can be MA, MB, ME or MF ReneSola 60-cell modules with 40 mm frames JCxxxY-ZZ “Y” can be F, M or S; and “ZZ” can be Ab, Ab-b, Abh, Abh-b, Abv, Abv-b, Bb, Bb-b, Bbh, Bbh-b, Bbv, Bbv-b, Db, or Db-b

PAGE
25

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

MANUFACTURER Renogy S-Energy
Seraphim USA SEG Solar
Shinsung E&G Silfab
Solar4America Solarever Solaria SolarTech

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES
Renogy Modules with 35 mm frames RSPxxxD-YY-ZZZ Where “YY” can be BB or BK; and “ZZZ” can be 108 or 120 S-Energy modules with 35 and 40 mm frames SABB- CCYYY-xxxZ Where “A” can be C, L or N; “BB” can be blank, 20, 40 or 45; “CC” can be blank, 60 or 72; “YYY” can be blank, MAE, MAI, MBE, MBI, MCE or MCI; and “Z” can be V, M-10, P-10 or P-15 Seraphim modules with 35 and 40 mm frames SRP-xxx-YYY-ZZ Where “YYY” can be 6MA, 6MB, 6PA, 6PB, or BMD; “ZZ” is blank or HV SEG Solar Modules with 35 and 40 mm frames SEG-xxx-YYY-ZZ Where “YYY” can be BMB, BMD or 6MA; “ZZ” can be BB, BW, HV, TB, WB or WW Shinsung Modules with 35 mm frames SSVxxx-144MH Silfab Modules with 35 and 38 mm frames SYY-Z-xxxAb Where “YY” can be IL, SA, LA, SG or LG; “Z” can be blank, M, P, or X; “A” can be blank, B, H, M, N; and “b” can be A, C, C+, G, K, L, M, N, T, U or X Solar4America modules with 30, 35 and 40 mm frames S4Axxx-ZZyyAA Where “ZZ” can be 72 or 108; “yy” can be MH5 or MH10; and “AA” can be BB or SW Solarever modules with 35 mm frames SE-zzz
yy-xxxM-aaa Where “zzz” can be 166 or 182; “yy” can be 83 or 91; and “aaa” can be 108 or 144 Solaria modules with 35 and 40 mm frames PowerA-xxxR-ZZ Where “A” can be XT or X; and “ZZ” can be blank, AC, BD, BX, BY, PD, PL, PX, PZ, WX or WZ SolarTech modules with 40 mm frames AAA-xxx Where “AAA” can be PERCB-B, PERCB-W, HJTB-B or HJTB-W

PAGE
26

REVISION DATE: 06/28/23 VERSION: v3.3

MODULES

INSTALLATION GUIDE

MANUFACTURER Sonali
Star Solar Sunmac Solar
Sunpower Sunpreme Sunspark
Suntech Talesun
Tesla Thornova
Trina

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Sonali Modules with 35 mm frames SS-M-xxx Star Solar modules with 35 mm frames Star-xxxYYY-ZZZ Where “YYY” can be M60H or M60HB; and “ZZZ” can be blank or M10 Sunmac modules with 30 and 35 mm frames SMxxxMaaaZZ-BB Where “aaa” can be 660 or 754; and “ZZ” can be NH or SH Sunpower modules with 35 and 40 mm frames SPR-A-xxx-YY Where “A” can be A or M; and “YY” can be blank , COM, G-AC, BLK-G-AC, H-AC or BLK-H-AC Sunpreme Modules with 40 mm frames GxB-xxxT Sunspark modules with 40 mm frames SYY-xxxZ-A Where “YY” can be MX or ST; and “Z” can be M, MB, M3, M3B, P or W; and “A” can be 60 or 72 Suntech Modules with 35 mm frames STPxxxS-zz/aa Where “zz” can be B60 or B72; and “aa” can be Vnh or Wnhb Talesun modules with 30 and 35 mm frames TD6yZZA-xxx Where “D” can be D or P; “y” can be G, I or L; “ZZ” can be 60 or 72; and “A” can be M or M(H) Tesla modules with 40 mm frames TxxxY Where “Y” can be H or S Thornova Modules with 30 and 35 mm frames TS-YYZZ(xxx)-X Where “YY” can be BB or BG; “ZZ” can be 54 or 60; and “X” can be blank or X Trina modules with 30, 35 and 40 mm frames TSM-xxxYYZZ “YY” can be DD05, DD05A, DD06, DE05, DE09, DX05A, DE06X, PA05, PC05, PD05, PE14 or PX05; and “ZZ” can be blank or A, .05, .05(II), .08, A.05, A.08, A(II), A.05(II), A.08(II), C.05, C.07, C.05(II), C.07(II), H, H.05, H.08, H.05(II), H.08 (II), M, M(II) or M.05(II)

PAGE
27

REVISION DATE: 06/28/23 VERSION: v3.3

INSTALLATION GUIDE

MANUFACTURER Universal
URE
Vikram
VSUN Waaree
Yingli Yotta Zeus ZN Shine

LIST OF UL 2703 APPROVED TYPE 1, 2 & 29 PV MODULES*
Universal Solar Modules with 35 mm frames UNI-xxx-yyyZZZ-aa Where “yyy” can be 108, 120 or 144; “ZZZ” can be M, MH or BMH; and “aa” can be blank, BB or DG URE modules with 35 mm frames DyMxxxaa Where “D” can be D or F, “y” can be A, B, 6 or 7; “M” can be K, or M; and “aa” can be C8G, H3A, H4A, H8A, E7G-BB, MFG-BB or M7G-BB Vikram solar modules with 35 and 40 mm frames XVSyy.ZZ.AAA.bb Where “X” can be blank, Paradea, Prexos or Somera; “yy” can be MDH, MDHT, MH or MHBB; “ZZ” can be 54, 60 or 72; “AAA” is the module power rating; and “bb” can be 05 VSUN modules with 30, 35 and 40 mm frames VSUNxxx-YYz-aa Where “YY” can be 108 or 120; “z” can be BMH or M; and “aa” can be blank, BB or BW Waaree modules with 40 mm frames WSyy-xxx where “yy” can be blank, M or MB Yingli modules with 30, 35 and 40 mm frames YLxxxZ-yy Where “Z” can be D or P; “yy” can be blank, 29b, 30b, 34d, 35b, 36b, 37e 1/2, 37e 1500V 1/2, 40d, 49e 1/2 or 49e 1500V 1/2 Yotta modules with 30 mm frames YSM-Bxxx-06-72-1 Zeus Solar Modules with 40 mm frames ZxxxM-HB ZN Shine modules with 35 mm frames ZXMY- AAA-xxx/M Where “Y” can be 6 or 7; “AAA” can be 72, NH120, NHDB144 or SH108

MODULES

PAGE
28

INSTALLATION GUIDE

REVISION DATE: 06/28/23 VERSION: v3.3

TYPE 4 MODULES

**Class A System fire rating with Steep Slope Roofs and Type 4 modules with south edge skirt required. Class B System fire rating with Steep Slope Roofs Type 4 modules, no skirt required. Any roof-to-module gap is permitted. This rating is applicable with any roof attachment.

MANUFACTURER Bluesun Solar Emmvee
Saatvik Sirius PV Solarever Talesun

LIST OF UL 2703 APPROVED TYPE 4 PV MODULES*
Bluesun modules with 35 mm frames BSMxxxM10-54HPH Emmvee modules with 35 mm frames Exxx-YYZZZ-B Where “YY” can be M, P and HCM; “ZZZ” can be 72 or 120 Saatvik Modules with 35 mm frames SGExxx-108ZZZ Where “ZZZ” can be MHC, MBHC or MHCB Sirius PV Modules with 35 mm frames ELNSM54M-HC-xxx Solarever modules with 35 mm frames SE-166
83-450M-144N Talesun modules with 30 mm frames TP7G54M(H)xxx

MODULES

PAGE
29

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals