LONGi LR5-54HTB-435W Hi-MO Soler Explorer
Safety Note
- This manual elaborates on installation and safety use information for PV power generating modules (hereinafter referred to as module) of LONGi Green Energy Technology Co., Ltd.(hereinafter referred to as LONGi). Please abide by all safety precautions in this guide and local regulations.
- Installation of modules requires professional skills and knowledge and is to be carried out by qualified personnel. Please read this manual carefully before install-ing and using this module. Installation personnel shall get familiar with mechanical and electrical requirements of this system. Please keep this manual readily available as reference for future maintenance or upkeep or for sales and testing or handing of modules.
- If you have any doubts, please contact LONGi customer service personnel for further interpretation
Specifications
- Product: LONGi Photovoltaic Modules of DG
- Installation Manual: PV Module Installation Manual
Product Usage Instructions
Introduction
This installation manual provides electrical and mechanical installation
information for LONGi Photovoltaic Modules. It is important to read and
understand this information before installing the modules. The manual also
contains crucial safety information that you should be familiar with. Failure
to comply with the requirements in this manual will invalidate the limited
warranty provided to customers. The suggestions in this manual are designed to
improve the safety of module installation and have been tested and proven
through years of experience. Please provide this manual to PV system users for
reference and inform them about operation and maintenance requirements.
Electrical and mechanical installation information will be introduced in this
installation manual, so please read and understand the information before
installing LONGi modules. In addition, this manual also contains important
safety information that you should be familiar with. All contents in this
manual are intellectual properties of LONGi which originates from long term of
technical exploration and experience accumulation of LONGi. This installation
manual does not entail any explicit or implicit quality warranty and does not
stipulate on compensation schemes for losses, module damages or other costs
caused by or related to module installation, operation, utilization and
maintenance process. LONGi will not take any responsibility if patent rights
or the third party rights are infringed by use of modules. LONGi reserves the
rights for modifying product manual or installation manual without advanced
notice. It is recommended to visit our website regularly at
www.longi.com for the latest version of this
installation manual. If customers fail to install modules as per requirements
set forth in this manual, the limited warranty provided for customers will be
invalid. In addition, suggestions in this manual are to improve safety of
module installation, which are tested and proved through years of experience.
Please provide this manual to PV system users for reference and inform the
advises on operation, maintenance requirements etc.
Laws and Regulation
The mechanical and electrical installation of photovoltaic modules must comply
with applicable regulations, including electrical laws, construction laws, and
electrical connection
requirements. These regulations may vary depending on the installation site,
such as building roof installation or vehicle applications. Requirements may
also vary based on the installed
system voltage (DC or AC). It is important to contact local authorities for
specific terms and regulations.
General Information
Modules Identification
The module contains several labels providing important information:
- Frame: Indicates the frame of the module.
- Glass: Represents the glass component of the module.
- EVA: Stands for Ethylene Vinyl Acetate, a material used in module construction.
- Junction Box: Indicates the location of the junction box.
- Backsheet: Represents the backsheet component of the module.
- Silica Gel: Refers to the silica gel used in module construction.
- Cable: Represents the cable used for electrical connections.
- Connector: Indicates the connector used for module wiring.
- Drain Hole: Represents the drain hole in the module.
- Mounting Hole: Indicates the location of mounting holes.
- Grounding Hole: Represents the grounding hole in the module.
- Solar Cell Name Plate: Indicates the nameplate of the solar cell.
- Bar Code: Represents the barcode of the module.
Three labels on the module contain the information below:
- Nameplate: product type, rated power, rated current, rated voltage, open circuit voltage, short circuit current under testing conditions, certification indicator, maximum system voltage, etc.
- Current classification label: Rated working current. (H indicates High, M indicates Medium, L indicates Low)
- Serial Number label: A unique serial number which is laminated inside the module permanently which can be found in the front of the module. There is another same serial number beside the module nameplate.
1 | Frame | 2 | Glass | 3 | EVA | 4 | Solar Cell |
---|---|---|---|---|---|---|---|
5 | Back sheet | 6 | Silica Gel | 7 | Junction Box | 8 | Name Plate |
9 | Cable | 10 | Connector | 11 | Mounting Hole | 12 | Grounding Hole |
13 | Drain Hole | 14 | Bar Code |
Typical Mechanical Drawing of Mono-facial Modules
Please refer to section 3.2 for the location of the junction box. The specific
version is subject to the corresponding specification.
1 | Frame | 2 | Front Glass | 3 | EVA/POE | 4 | Solar Cell |
---|---|---|---|---|---|---|---|
5 | Back Glass | 6 | Sealant | 7 | Junction Box | 8 | Name Plate |
9 | Mounting Holes | 10 | Grounding Holes | 11 | Drain Holes | 12 | Bar Code |
Typical Mechanical Drawing of Bifacial Modules
(Please refer to section 3.2 for the location of the junction box. The
specific version is subject to the corresponding specification.)
Junction box style and wiring method
Regular Safety
The application level of LONGi Solar module is Class Ⅱ, which can be used in
systems operating at > 50 V DC or >240 W, where general contact access is
anticipated;
When the modules are for rooftop application, it is necessary to take the
overall fire rating of the finished structure as well as operation and
maintenance into account. The roofing PV system shall be installed after being
evaluated by construction experts or engineers and with official analysis
results for the entire structure. It shall be proved capable of supporting
extra weight of system racking structures and PV modules. For your safety,
please do not work on the roof without required safety PPE(Personal Protective
Equipment) which includes but not limited to fall protection, ladder or stair
and personal protective measures. For your safety, please do not install or
handle modules in unsafe conditions including but not limited to strong wind
or gust, damp or sandy roofs.
Electrical Performance Safety
PV modules can produce DC current under sunlight. Any contact of exposed metal
at module’s wiring parts may result in electrical shock or burn. Any contact
of 30 V or larger DC Voltage can be fatal. In case of no connected load or
external circuits, modules can still produce voltage. Please use insulation
tools and wear rubber gloves when operating modules in the sunlight. No switch
is on the PV modules. Operating of PV modules can only be stopped when they
are kept from sunlight or covered by hard board or UV-proof materials. To
avoid electric arc or electric shock hazards, please do not break down
electric connection in loaded conditions. Incorrect connections will also lead
to electric arc or shock. Keep connectors dry and clean and make sure that
they are in good operating condition. Do not Never insert other metals into
the connectors or carry out electric connection by whatever means. Snow, water
or other reflective medium in surrounding environments that intensify light
reflection will increase output current and power, and module voltage and
power will increase under low temperature condition. If module glass or other
sealing materials are damaged, please wear PPE(personal protective equipment)
and then isolate modules from the circuit. Do not operate when modules are wet
unless you wear PPE(personal protective equipment). Please follow the cleaning
requirements in this manual when cleaning modules. Do not contact connectors
with the following chemicals: Gasoline, White Flower oil , wood lock oil, Mold
temperature oil, Engine oil (such as KV46), Grease( such as Molykote EM-50L),
Lubricating oil, Rust-proof oil, Stamping oil, Diesel, Cooking oil, Acetone,
alcohol, essential balm, Bone-setting liquid, Banana oil, release agent (such
as Pelicoat S-6), adhesive and potting materials capable of generating oxime
gas (such as KE200、CX-200、chemlok), TBP, cleaning agent etc.
Operation Safety
Open modules outer package when installation. Do not damage the package and do
not drop packaged modules on the ground. Do not exceed the indicated maximum
layer limit on the packaging carton when piling stacking modules up. Put
packaging carton in the ventilated, water-proof and dry places before
unpacking modules.
Follow unpacking instructions when opening packaging carton. Carrying modules with the junction box or wires are strictly forbidden. Do not stand or walk on modules. To avoid glass damage, heavy objects are not allowed on modules. Be careful when placing modules at corners in particular. Do not try to dismantle the module or remove nameplate or parts of modules. Do not paint or apply any other adhesive on modules. Do not damage or scratch back sheet of modules.
Do not drill holes on the frame of module, which may reduce frame loading capacity and lead to frame corrosion and invalidation of the limited warranty provided for customers. Do not scratch anodic coating of aluminum alloy frame except for grounding connection. Scratch may lead to frame corrosion and reduce frame loading capacity and long-term reliability.
Do not repair problematic modules on your own.
Fire Safety
Please refer to local laws and regulations before installing modules and abide
by requirements on building fire protection. According to the corresponding
certification standards, the fire rating of LONGi Mono-facial modules is UL
Type 1 or 2 or IEC Class C, the fire rating of LONGi bifacial modules is UL
Type 29 or IEC Class C. The roof should be coated by a layer of fireproof
materials with suitable fire protection rating for roofing installation and
make sure that the back sheet and the mounting surface are fully ventilated.
Different roof structures and installation modes will affect fireproof
performance of buildings. Improper installation may lead to the risk of fire.
To guarantee roof fire rating, the distance between module frame and roof
surface must be ≥10 cm. (0.39 inch) Adopt proper module accessories such as
fuse, circuit breaker and grounding connector according to local regulations.
Please do not apply modules in where exposed inflammable gases are nearby.
Installation Conditions
Installation Site and Working Environment
The modules cannot be used in space. Do not manually focus sunlight with
mirrors or magnifying glass onto modules. LONGi modules shall be installed on
proper buildings or other appropriate places (such as ground, garage, building
outer wall, roof, PV tracking system) but shall not be installed on any
vehicles. Do not install modules at places that are possible to be flooded.
LONGi suggests that modules be installed in the working environment with the
temperature of -40 ℃ to 40 ℃ of which is the monthly average highest and
lowest temperature of the installation sites. The extreme working environment
temperature for modules is -40 ℃ to 85 ℃. Make sure that installed modules do
not suffer wind or snow pressure that exceeds the permissible maximum load
limit. Modules shall be installed in places free from shadows throughout the
year. Make sure there are no light-blocking obstacles in the installation
sites. Carry out lightning protection for modules installed in places with
frequent lightning and thunder. Do not install modules in places with possible
inflammable gases. Modules cannot be used in environments with too much hails,
snows, flue gas, air pollution and soot or in places with strong corrosive
substances such as salt, salt mist, saline, active chemical steam, acid rain,
or other substances corroding modules, affecting modules’ safety or
performance. Please take protective measures to ensure reliable and safe
installation of modules in severe environments such as heavy snow, cold and
strong wind or islands close to water and salt mist or deserts. LONGi modules
passed the IEC 61701 salt spray corrosion test, but the corrosion may still
occur where the modules frame is connected to the bracket or where the
grounding is connected. LONGi modules can be installed ≥50 m away from the
ocean side, and related parts and components should be protected with anti-
corrosion measures.
Selection of Tilt Angles
Tilt angle of PV modules refer to the included angle between module surface
and horizontal ground.
The module will obtain the maximum power output when directly facing the
sunlight.
Modules are preferred to be south-facing in the north hemisphere and north- facing in the south hemisphere. Please refer to standard modules installation guideline or suggestions from experienced PV module installer, for the specific installation angle. LONGi suggests that the modules be installed at a large angle, so module surface dust can be washed away easily by rainfall and frequency of cleaning can be reduced; For small Angle installation, it is recommended to increase the cleaning frequency according to the actual situation to avoid long-term accumulation of large amounts of dust, which will affect the appearance and performance of the modules. LONGi modules connected in string should be installed with the same orientation and tilt angle. Different module orientation and tilt angle may result in different levels of solar irradiation and also power generation. In order to achieve the maximum annual generating capacity, the optimal orientation and inclination of PV modules in the installed area should be selected to ensure that sunlight can still reach to modules even on the shortest day of the year. If LONGi modules are used in off-grid System, the tilt angle should be calculated based on seasons and irradiation to maximize the output power. If the modules output power meets the acquired load under the period of the worst irradiation in the year, the modules should be able to meet the load of the whole year. If the LONGi modules are used in grid-connected system, the tilt angle should be calculated based on the principle to maximize the yearly output power.
Mechanical Installation
Regular Requirements
Make sure that installation method and mounting structure are solid enough to
meet the expected load-bearing requirement, which is requisite assurance from
PV system installer. Installation bracket system shall be tested and inspected
by the third party testing institution with static mechanical analysis
capacity in accordance with local national standards or international
standards. Mounting structure shall be made from durable, corrosion resistant,
UV-proof materials. Modules shall be fixed on the bracket solidly. In regions
with heavy snowfall in winter, adjust the height of the mounting system so
that the lower edge of the module is not covered by snow. In addition, ensure
the lower part of module is not in the shadow of plants, trees or damaged by
flying sand and stone. If modules are installed on brackets parallel to the
roof or wall, the minimum gap between the module frame and the roof/wall shall
be 10cm which is good for air circulation to achieve better performance of
module. Make sure the building is suitable for installation before installing
modules on roof. Moreover, seal properly to prevent leakage. The module frames
can encounter thermal expansion and cold contraction. So the minimum distance
between two adjoining modules shall be no less than 10 mm (0.39 inch). Make
sure the back sheet of modules will not be in contact with bracket or building
structures that can pierce into the inside of the modules, especially when the
module surface is imposed by pressure. Maximum static load of the PV module is
downforce 5400 Pa and uplift force 2400 Pa, which can vary from different
mounting methods of the modules (please refer to the following installation
guidance), the described load in this manual is for the test load.
Note: on the basis of IEC 61215-2016 installation requirements, when
computing the corresponding maximum design load, a safety factor of 1.5 need
to be considered in compliance with the local laws or regulations. (Test load
= design load *1.5 times safety factor)
Modules can be installed horizontally or vertically. When installing the
components, be cautious not to block the drain hole of the frame.
Module Mechanical Installation
Module and bracket system connection can be realized by mounting holes, clamps
or embedded systems. Installation shall follow the demonstration and
suggestions below. If installation mode is different, please consult LONGi
customer service personnel and obtain approval. Otherwise, modules may be
damaged and limited warranty will be invalid.
Bolts Mounting
The LONGi’s module has mounting holes matching M6 and M8 bolts. See Figure 4
for installation details and corresponding hole positions.
Installation hole positions of modules
Apply bolts to fix modules on the bracket through mounting holes on the back-
side frame. See details in Figure 5.
Bolt Installation of Mono-facial Modules
Recommended accessories are as below:
Accessories | Model | Material | Note |
---|---|---|---|
Bolt | M8 | M6 | Q235B/SUS304 |
application environment.
Washer| 2pcs, thickness ≥1.5 mm and outside diameter =16 mm| 2pcs, thickness
≥1.5 mm and outside diameter =12-18 mm| Q235B/SUS304
Spring Washer| 8| 6| Q235B/SUS304
Nut| M8| M6| Q235B/SUS304
Suggestion 1:
M8 bolt tightening torque range: 12-16 N•m
M6 bolt tightening torque range: 8-12 N•m
Suggestion 2: When using LONGi 30 mm height frame module, it is
recommended to select L ≤ 25mm length fasteners. (If there is a special model,
consult LONGi customer service personnel).
Clamps Mounting
The module can be mounted by a dedicated clamp, as shown in Figure 6.
Clamp Installation of Mono-facial Modules
Under no circumstances should the clamp touch the glass or deform the frame.
The interface of the clamp to the front of the frame must be smooth and flat
to prevent frame or other components from being damaged. Make sure that these
are no shadow caused by clamps. The drain holes of module cannot be blocked by
clamps. For framed PV module, it is recommend that the length of the clamp be
at least 50mm, the clamp must maintain an overlap of 10-12 mm with the frame
of the module (For Clamp installation with an overlap of less than 10mm, LONGi
technicians need to be consulted for assessment). The applied value of torque
should refer to mechanical design standard and the bolt type customer is
using, for example: M8: 14-18 N•m.
Installation and Mechanical Load of Mono-facial Module
Mono-facial modules can be mounted by bolts or clamps. The mounting method and
maximum test load are shown as follow (The unit of distance and length in the
table below is millimeter (mm), and the unit of pressure is Pascal (Pa)).
Mono-facial Module Installation Position
The maximum test load of framed mono-facial modules:
Installation Method/ Module Type | Bolts Mounting | Clamps Mounting |
---|---|---|
Mounting rails cross the long frame | Mounting rails cross the long frame | |
Mounting rails cross the short frame | Clamps are mounted at the corners of |
short frame
Outer Four-hole| Inner Four-hole| 250≤D≤350| 350≤D≤450| 450≤D≤550| 150≤E≤250
54/66-cell
Framed Mono-facial Modules| LR5-54HPH-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400|
/| /| ±2400| ﹢2400,-1800
LR5-54HPB-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400| /| /| ±2400| ﹢2400,-1800
LR5-54HNB-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400| /| /| ±2400| ﹢2400,-1800
LR5-54HTH-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400| /| /| ±2400| ﹢2400,-1800
LR5-54HTB-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400| /| /| ±2400| ﹢2400,-1800
LR5-66HPH-xxxM| ﹢5400,-2400| ±2400| /| ﹢5400,-2400| /| ±1800| ±1600
72-cell Framed
Mono-facial Module| LR5-72HPH-xxxM| ﹢5400,-2400| ±2400| /| /| ﹢5400,-2400| /|
/
LR5-72HTH-xxxM| ﹢5400,-2400| ±2400| /| /| ﹢5400,-2400| /| /
LR5-72HPH-xxxM| ﹢5400,-2400| /| /| /| ﹢5400,-2400| /| /
LR5-72HTH-xxxM| ﹢5400,-2400| /| /| /| ﹢5400,-2400| /| /
The above data is based on the static load requirements of IEC61215 standard (Tested by LONGi or third party certification institution)
Installation and Mechanical Load of Bifacial module
Bifacial modules can be mounted by bolts or clamps. The mounting method and
maximum test load are shown as follow. (The unit of distance and length in the
table below is millimeter (mm), and the unit of pressure is Pascal (Pa)).
Bifacial Module Installation Position
The maximum test load of framed Bifacial modules:
Installation Method/
Module Type| Bolts Mounting| Clamps Mounting
---|---|---
Mounting rails cross the long frame| Mounting rails cross the long frame|
Mounting rails cross the short frame| Clamps are mounted at the corners of
short frame
Outer Four-hole| Inner Four-hole| 250≤D≤350| 150≤E≤250| /
54-cell
Framed Bifacial Module| LR5-54HABD-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400|
±2400| +2400,-1800
LR5-54HABB-xxxM| ±2400| ﹢5400,-2400| ﹢5400,-2400| ±2400| +2400,-1800
Installation Method/ Module Type| Bolts Mounting| Clamps Mounting
---|---|---
Mounting rails cross the long| Mounting rails parallel the long frame|
Mounting rails cross the long frame| Mounting rails parallel the long frame
Outer Four-hole| Outer Four-hole| Inner Four-hole| 250≤D≤350| 450≤D≤550|
350≤D≤450| 450≤D≤550
66/72/-cell
Framed Bifacial Module| LR5-66HBD-xxxM| ﹢5400,-2400| ﹢3600, -2400| ±2400|
﹢5400,-2400| ﹢5400,-2400| ﹢3600, -2400| /
LR5-72HBD-xxxM| ﹢5400,-2400| ﹢3600, -2400| ±2400| /| ﹢5400,-2400| /|
﹢3600,-2400
LR5-72HND-xxxM| ﹢5400,-2400| ﹢3600, -2400| ±2400| /| ﹢5400,-2400| /|
﹢3600,-2400
LR5-72HTD-xxxM| ﹢5400,-2400| ﹢3600, -2400| ±2400| /| ﹢5400,-2400| /|
﹢3600,-2400
LR5-72HBD-xxxM| ﹢5400,-2400| ﹢3600, -2400| /| /| ﹢5400,-2400| /| ﹢3600,-2400
LR5-72HGD-xxxM| ﹢5400,-2400| ﹢3600, -2400| /| /| ﹢5400,-2400| /| ﹢3600,-2400
The above data is based on the static load requirements of IEC61215 standard (Tested by LONGi or third party certification institution).
Electrical Installation
Electrical Performance
The electrical characteristics are within ±3% of the indicated values of Isc,
Voc and Pmax under STC (1000 W/m2 Irradiance, a cell temperature of 25 ℃ and
an AM1.5 spectrum).
When modules are in series connection, the string voltage is sum of every
individual module in one string. When modules are in parallel connection, the
current is sum of the individual module as shown in below figure 9. Modules
with different electric performance models cannot be connected in the same
string.
Series Connection and Parallel Connection Circuit Diagram
The maximum allowed quantity of modules in string connection shall be
calculated according to relative regulations. The open circuit voltage value
under the expected lowest temperature shall not exceed the maximum system
voltage value allowed by modules and other values required by DC electric
parts. (LONGi modules maximum system voltage is DC1000 V/DC1500 V—actually
system voltage is designed based on the selected module and inverter model)
The correction value of VOC can be calculated by the following formula.
CVoc=1-βVoc×(25-T)
T: The expected lowest temperature of the installation site.
β: VOC temperature coefficient (% /℃) (Refer to module datasheet for further
detail)
If there has reverse current exceeding the maximum fuse current flowing
through the module, use overcurrent protection device with the same
specifications to protect the module. If quantity of parallel connection is
more than 2, there must be an overcurrent protection device on each string of
module.
Cables and Wiring
PV Module’s junction boxes with the IP67 protective level, can provide the
safety protection for cable and wiring connection, also for contact protection
of non-insulating electric parts. Each module has two individual wires
connecting the junction box, one is negative pole and the other is positive
pole. Two modules can be in series connection by inserting the positive pole
at one end of wire of one module into the negative pole of the adjoining
module. According to local fire protection, building and electrical
regulation, apply proper cable and connector; ensure the electrical and
mechanical property of the cables (the cables should be put in a catheter with
anti-UV aging properties, and if exposed to air, the cable itself should have
anti-UV aging capability). The installer can only use single-wire cable, ≥ 4
mm2 (12 AWG), 90 ℃ , with proper insulation capability to withstand the
maximum open circuit voltage (such as EN50618 approval). Need to select
appropriate wire specifications to reduce voltage drop. LONGi requires that
all wiring and electrical connections comply with the appropriate National
Electrical Codes. When cables are fixed on the bracket, avoid mechanical
damaging cables or modules. Do not press cables by force. Adopt UV resistant
cable ties and clamps to fix cables on the bracket. Though cables are UV
resistant and water proof, it is still necessary to prevent cables from direct
sun light and water immersion. The minimum allowed bending radius of cables
should be 43 mm. (1.69 inch)
Connector
Please keep connectors clean and dry. Make sure connector caps are fastened
before connection. Do not connect connectors under improper conditions of
damp, dirty or other exceptional situations. Avoid connectors from direct sun
light and water immersion or falling onto ground or roof. Incorrect connection
may lead to electric arc and electric shock. Please make sure that all
electric connection is reliable. Make sure all connectors are fully locked.
Only connectors as the compatible model from same vendor can be mated
together. Any doubt, please consult LONGi customer service personnel.
Bypass Diode
LONGi solar module junction box contains bypass diode which is in parallel
connection with the cell string. If hot spot occurred, the diode will come
into operation to stop the main current from flowing through the hot spot
cells in order to prevent module over-heated and performance loss. Note, a
bypass diode is not the overcurrent protection device. If the diode is
definite or suspected to be defective, the installer or system maintenance
supplier shall contact LONGi. Please do not try to open the module junction
box on your own.
PID Protection and Inverter Compatibility
PV modules may appear Potential Induced Degradation (PID) under high humidity,
high temperature and high voltage condition.
Modules may appear Potential Induced Degradation (PID) under the conditions below:
- PV modules install under hot and humid weather condition.
- PV modules installation site is under long-term humid environment such as water floating application.
To reduce the risk of PID, on the modules DC connection site, it is recommended to connect the negative to ground. The PID protection measures on system level are recommended as follow
- For isolated PV inverter, the negative of the PV modules DC connection side can be directly grounded.
- For non-isolated PV inverter, isolated transformer is needed to be equipped before applying virtual grounding method for inverter.
Grounding
In design of modules, the anodized corrosion resistant aluminum alloy frame is applied for rigidity support. For safety consideration and to protect modules from lightning and electrostatic damage, the module frame must be grounded. The grounding device must be in full contact with inner side of the aluminum alloy and penetrate surface oxide film of the frame. Do not drill additional grounding holes on module frame. The grounding conductor or wire may be copper, copper alloy, or any other material acceptable for application as an electrical conductor per respective National Electrical Codes. The grounding conductor must then make a connection to ground with a suitable ground electrode. There are grounding holes with the diameter of Ø4.2 mm at the edge location of module’s back-side frame. The grounding hole on the frame is marked with typical grounding symbol ( ) according to IEC 61730-1 standard, which can only be used for grounding, not for module installation. Grounding between modules shall be confirmed by qualified electricians and grounding devices shall be manufactured by qualified electric manufacturer. The copper core wire used for the grounding clamp is recommended to be 12 AWG. And copper wires cannot be pressed during installation in case of damaging.
The following is one of the recommended grounding methods of LONGi modules:
-
Align grounding clamp to the frame grounding hole. Use grounding bolt to go through the grounding clamp and frame.
-
Put the tooth side of the washer on the other side and fasten the nuts.
-
Put grounding wires through the grounding clamp and grounding wire material and dimension shall meet requirements in local national and regional law and regulations.
-
Fasten bolts of grounding wires and then installation is completed.
Mounting holes on modules that are not occupied can be used for installing grounding devices. The third party grounding device can be used for grounding of LONGi modules but such grounding method shall be proved to be reliable. Grounding device shall be operated in line with stipulations of the manufacturer.
Operation and maintenance
It is the users’ responsibility to carry out regular inspection and maintenance for modules, especially during the period of limited warranty. To inform the LONGi customer service personnel within two weeks when modules are found broken or other significant abnormality. Refer to the 《LONGi PV Module Operation and Maintenance Manual》 for details on module maintenance.
Cleaning
Accumulated contaminants on module surface glass will reduce the power output
and lead to local hot spot, such as dust, industrial wasted water and birds’
droppings. The severity of influence is determined by transparency of wastes.
Small amounts of dust will affect the intensity and evenness of received solar
irradiation but are not dangerous and power will not be reduced remarkably
generally. During operation of modules, there shall be no environmental
factors to shade modules fully or partially. These environment factors
including other modules, module mounting system, birds dwelling, dust, soil or
plants. These will significantly reduce output power. LONGi suggests that the
module surface should not be shadowed in any case. Frequency of cleaning
depends on dirt accumulation speed. In normal situations, rainwater will clean
the module surface and reduce the cleaning frequency. It is suggested to use
sponge dipped with clean water or soft cloth to wipe the glass surface. Do not
use acid and alkaline detergents to clean modules. Do not use tool with rough
surface to clean in any case. In order to avoid potential risk of electrical
shock or burn, LONGi suggests cleaning the modules during early morning or
evening with low irradiance and low modules temperature especially for the hot
regions. In order to avoid potential risk of electrical shock, do not try to
clean the modules with glass damage or expose wires.
Module Appearance Inspection
Check module cosmetic defects with naked eyes, especially:
- Module glass cracks.
- Corrosion at welding parts of the cell main grid (caused by moisture into the module due to damage of sealing materials during installation or transportation).
- Check whether there are traces of burning mark on the module back sheet.
- Check PV modules if any signs of aging including rodent damage, climate aging, connectors tightness, corrosion and grounding condition.
- Check if any sharp objects in contact with PV modules’ surface
- Check if any obstacles shading the PV modules
- Check if any loose or damage screws between the modules and mounting system. If so, adjust and fix in time.
Inspection of Connectors and Cables
It is suggested to carry out the following preventive inspection twice a
year:
- Check the tightness of the connectors and cables.
- Check if any crack or gap of silicone nearby the junction box.
Applicable Module Type
Applicable Module Type | Certification Status | Module Structure |
---|---|---|
**** Mono-facial Module | LR5-54HPH-xxxM | / |
LR5-54HPB-xxxM | / | IEC、UL |
LR5-54HNB-xxxM | LR5-72HPH-xxxM | IEC、UL |
LR5-54HTH-xxxM | LR5-72HPH-xxxM* | IEC、UL |
LR5-54HTB-xxxM | LR5-72HTH-xxxM | IEC、UL |
LR5-66HPH-xxxM | LR5-72HTH-xxxM* | IEC、UL |
**** Biacial Module | LR5-54HABD-xxxM | LR5-72HBD-xxxM |
LR5-54HABB-xxxM | LR5-72HBD-xxxM* | IEC、UL |
LR5-66HBD-xxxM | LR5-72HGD-xxxM* | IEC、UL |
/ | LR5-72HND-xxxM | IEC、UL |
/ | LR5-72HTD-xxxM | IEC、UL |
- The “*” identifier behind the module model indicates that the height of the module frame is 30mm.
- LR4-xxx-xxxM module and LR5-xxxHIH/HIB/HIBB/HIBD-xxxM module installation load and certification information are shown in the V16 version of LONGi PV Module Installation Manual.
FAQ (Frequently Asked Questions)
-
Q: What should I do if I fail to install the modules as per the requirements in the manual?
A: If you fail to install the modules as per the requirements set forth in this manual, the limited warranty provided for customers will be invalid. It is important to carefully follow the installation instructions provided. -
Q: Are there any specific regulations I need to consider for my installation site?
A: Yes, the mechanical and electrical installation of photovoltaic modules must comply with applicable regulations, whichmay vary depending on factors such as the installation site, system voltage, and local authorities. Contact local authorities for specific terms and regulations.
LONGi Green Energy Technology Co., Ltd.
No.8369 Shangyuan Road, Xi’an Economic And Technological Development Zone,
Xi’an, Shaanxi, China.
Web: www.longi.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>