TRIM-TEX 2 Hour Fire Bead Installation Guide

June 15, 2024
TRIM-TEX

TRIM-TEX 2 Hour Fire Bead Installation Guide

Fast, simple and cost-effective, Fire Bead is the new go-to standard for firestopping in wall joints. Fire Bead provides protection for up to 1⁄2″ of building deflection with cutting-edge firestopping technology to halt the passage of smoke, fire and sound.

Installation Guide

  • Technical Specs

  • Scan Below for Installation Video

Before Installation:

Install drywall and leave a ½” gap between ceiling/adjacent structure and drywall. Measure, cut and dry fit the bead.

Step 1:
Coat both the bead and edge of drywall with Trim-Tax 847 Spray Adhesive.

Step 2:
Pressure the bead into place while ensuring that the bubble gasket is touching the ceiling/adjacent structure and is slightly compressed. Do not over compress the bubble gasket.

Step 3:
Staple every 6”-8” using ½” staples.

Step 4:
Finish with drywall compound. Remove tear-o strips prior to sanding.

Note:
There should be no gaps left in joints between pieces. Additional sealant may be used at butt joint to ensure seamless joints.