ICP DAS M-3133-240-CAN Power Meter Utility User Guide

June 4, 2024
ICP DAS

M-3133-240-CAN Power Meter Utility
User Guide
[Version 1.3]

M-3133-240-CAN Power Meter Utility

Warning
ICP DAS Inc., LTD. assumes no liability for damages consequent to the use of this product. ICP DAS Inc., LTD. reserves the right to change this manual at any time without notice. The information furnished by ICP DAS Inc. is believed to be accurate and reliable. However, no responsibility is assumed by ICP DAS Inc., LTD. for its use, or for any infringements of patents or other rights of third parties resulting from its use.
Copyright and Trademark Information
© Copyright 2012 by ICP DAS Inc., LTD. All rights reserved worldwide.
Trademark of Other Companies
The names used for identification only may be registered trademarks of their respective companies.
License
The user can use, modify and backup this software on a single machine. The user may not reproduce, transfer or distribute this software, or any copy, in whole or in part.

System Description

This document is intended to provide guidelines for the ICP DAS Power Meter Utility software tool that applies to ICP DAS Power Meter (e.g., PM-213x /PM- 311x / PM-213x-MTCP). This software tool has to be installed on a PC and it enables the retrieval and displays the power measurement values that are measured by a power meter via COM Port or Ethernet. The users will be able to read the power measurement values and perform parameter settings of the meter.
When connecting with PM-213x / PM-311x by RS-485 communication protocol interface, it requires converting RS-232 or USB on PC to the RS-485 communication interface, converter modules (such as ICP DAS I-7561, I-7520) might be required; When connecting with PM-213x-MTCP by Ethernet interface, it must set up the correct IP address to retrieve the power measurement values easily!
Features:

  • By Modbus RTU or Modbus TCP protocol, it enables connecting with ICP DAS Power Meter and data retrieving.
  • Real-time monitor power measurement values of the meter.
  • Real-time setting up parameters of the meter.
  • Restore the parameters of the meter to default factory settings.

Before Installation

Before installing ICP DAS Power Meter Utility, please finish installation of the ICP DAS Power Meter hardware, and make sure all wiring connections are accurate (e.g., please refer to the user manual for PM-213x / PM-311x / PM- 213x-MTCP). The Power Meter Utility requires the .NET framework version 2.0 to be installed on the target computer.
Please follow the link below to get the framework package directly from Microsoft, if required.

Software Installation

Please contact the ICP DAS service or visit the ICP DAS Intelligence Power Meter product Web site to obtain the latest version of the ICP DAS Power Meter Utility installer. Double-click the ICP DAS Power Meter Utility installer to run the installation. Click [Next] to continue.ICP DAS M 3133 240 CAN Power
Meter Utility - Fig 1

On the [Select Installation Folder] page, input the path or browse through the file dialog box to select the destination folder and select the software user option, click [Next] to continue.![ICP DAS M 3133 240 CAN Power Meter Utility

Make sure the settings are accurate. Click [Next] to start the installation.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
3

When the installation process is completed, click [Close] to finish installing the program.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
4

After the installation is completed, you will find the Power Meter Utility Shortcut on the desktop and in the program menu: [Start]→[All Programs]→[ICPDAS]→[ Power Meter] (icon ).ICP DAS M 3133 240 CAN Power Meter
Utility - Fig 5

User Interface Introduction

Power Meter Utility software tool Interface is shown as follows:

  • Languages: Select your preferred language for the software interface. (English, Traditional Chinese, Simplified Chinese).
  • Connection Setting: Set up related connection parameter settings for connecting with the power meter.
  • Real-Time Power Measurements: Display power meter measurement values in real time.
  • Status information: Display power meter status information.ICP DAS M 3133 240 CAN Power Meter Utility - Fig 6

Utility Operation Procedure

Power Meter Utility makes it easy to retrieve power measurements and modify parameters for systems in real-time when connecting with meters.
Power Meter Utility enables:

  • Change the Language interface for the utility user interface.
  • Establish connection or perform disconnection of the power meter.
  • Modify the parameters of the power meter.
  • Restore the parameters of the meter to default factory settings.

5.1 Change language
The preferred language can be set by the following steps:
i. Execute Power Meter Utility, and the language change option will appear on the right upper area of the window.

ii. Click on the preferred language, currently there are 3 language options: English, Traditional Chinese, and Simplified Chinese.
5.2 Establish connection or perform disconnection with the meter
5.2.1 Establish COM Port connection with PM-213x
i. Because PM-213x support Modbus RTU protocol, select “Modbus RTU (for PM- 213x / PM-311x)” in the Meter Communication Interface.ICP DAS M 3133 240 CAN
Power Meter Utility - Fig 8

ii. Under the Connection Setting section, select the COM Port that is going to connect with the power meter, input the Timeout interval (unit: ms) and input the Meter ID number. The default Timeout interval will be 1000 ms; this value can be modified according to the quality of the signal in the field.ICP DAS
M 3133 240 CAN Power Meter Utility - Fig 9

Note: The user can click on the “Refresh” button to renew the available COM Port of the PC system, and then select the COM Port from the dropdown list.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
10 iii. Make sure the parameters you input are all accurate and click on the “Connect” button.ICP DAS M 3133 240 CAN Power
Meter Utility - Fig 11

iv. When the system is trying to connect with the power meter, the status information will show the message: “Try connecting”. It will try to connect with the power meter by default factory parameter settings such as Baud Rate:19200 and Stop Bits: 1.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
12

v. If the system fails to establish the connection with the power meter by default factory parameter settings. The system will try other combinations of the Baud Rate and Stop Bits. The status information will show the Baud Rate and Stop Bits information.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
13

vi. After the utility connects with the meter, the Meter Parameter Information section will be renewed (as shown below). And the real-time power measurements will be displayed under the section of Power Measurements (as shown below).ICP DAS M 3133 240 CAN Power Meter Utility - Fig
14ICP DAS M 3133 240 CAN Power Meter Utility -
Fig 15

vii. After the connection has been established and the power measurements have been read into the system, the status information will show the time interval the system requires to read all power measurements. This value can be used as a reference for connection quality evaluation.ICP DAS M 3133 240 CAN Power
Meter Utility - Fig 16

5.2.2 Establish COM Port connection with PM-311x
i. Because PM-311x support Modbus RTU protocol, select “Modbus RTU (for PM- 213x / PM-311x)” in the Meter Communication Interface.ICP DAS M 3133 240 CAN
Power Meter Utility - Fig 17

ii. Under the Connection Setting section, select the COM Port that is going to connect with the power meter, input the Timeout interval (unit: ms) and input the Meter ID number. The default Timeout interval will be 1000 ms; this value can be modified according to the quality of the signal in the field.ICP DAS
M 3133 240 CAN Power Meter Utility - Fig 18

Note: The user can click on the “Refresh” button to renew the available COM Port of the PC system, and then select the COM Port from the dropdown list.

iii. Make sure the parameters you input are all accurate and click on the “Connect” button.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
20

iv. When the system is trying to connect with the power meter, the status information will show the message: “Try connecting”. It will try to connect with the power meter by default factory parameter settings such as Baud Rate:19200 and Stop Bits: 1.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
21

v. If the system fails to establish the connection with the power meter by default factory parameter settings. The system will try other combinations of the Baud Rate and Stop Bits. The status information will show the Baud Rate and Stop Bits information.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
22

vi. After the utility connects with the meter, the Meter Parameter Information section will be renewed (as shown below). And the real-time power measurements will be displayed under the section of Power Measurements (as shown below).ICP DAS M 3133 240 CAN Power Meter Utility - Fig
23

The PM-311x DO channel attribute setting, allows the user to modify the DO Relay value and Power On value individually by clicking on the “ON/OFF” button of a specific channel (as shown below).ICP DAS M 3133 240 CAN Power Meter
Utility - Fig 24

vii. After the connection has been established and the power measurements have been read into the system, the status information will show the time interval the system requires to read all power measurements. This value can be used as a reference for connection quality evaluation.ICP DAS M 3133 240 CAN Power
Meter Utility - Fig 25

5.2.3 Establish TCP/IP Connection with PM-213x-MTCP
i. Because PM-213x-MTCP support Modbus TCP protocol, select “Modbus TCP (for PM-213x-MTCP)” in the Meter Communication Interface.ICP DAS M 3133 240 CAN
Power Meter Utility - Fig 26

ii. Under the Connection Setting section, input the Timeout interval (unit: ms) and input the Meter ID number. The default Timeout interval will be 1500 ms; this value can be modified according to the quality of the signal in the field.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
27

iii. Click “Search” to enter the “Communication Interface Setting” window, and click the” Search” button to search the available power meter.ICP DAS M 3133
240 CAN Power Meter Utility - Fig 28

iv. Select the power meter which you want to modify parameters from the meter list, then click the” Configuration” button to set up the meter parameters. After completing all settings, click “OK”, and return to the meter list windows.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
29

v. Select the power meter that which utility will connect, then click the “OK” button.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
30

vi. Make sure the power meter parameters are all accurate and click the “Connect” button.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
31

vii. When the system is trying to connect with the power meter, the status information will show a “Try connecting” message.ICP DAS M 3133 240 CAN
Power Meter Utility - Fig 32

viii. After the utility connects with the meter, the Meter Parameter Information section will be renewed (as shown below). And the real-time power measurements will be displayed under the section of Power Measurements (as shown below).ICP DAS M 3133 240 CAN Power Meter Utility - Fig
33ICP DAS M 3133 240 CAN Power Meter Utility -
Fig 34

ix. After the connection has been established and the power measurements have been read into the system, the status information will show the time interval the system requires to read all power measurements. This value can be used as a reference for connection quality evaluation.ICP DAS M 3133 240 CAN Power
Meter Utility - Fig 35

5.2.4 Perform Disconnection
To disconnect the power meter, click on the “Disconnect” button to stop reading power measurements and interrupt the connection.ICP DAS M 3133 240
CAN Power Meter Utility - Fig 36

5.3 Modify parameters of the power meter
After successfully connecting with the meter via Power Meter Utility, the user can modify the parameters of the meter. The new settings will take effect next time when the system tries to establish a connection with the meter.
To modify the connection parameters, please follow the steps below:
(Using COM Port connection with PM-213x as an example):
i. After successfully connecting with the meter, some parameters input panel such as Baud Rate, Stop Bits, PT Ratio, and CT Ratio will appear to be available to input.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
37• Select appropriate values from the dropdown list of the Baud Rate and Stop Bits.
• For PT Ratio and CT Ratio, the user can select appropriate values from the dropdown list or input the value into the panel directly.
ii. After finishing setting up the parameters of the meter, click on the “Modify” button to modify the values. The new parameter settings will take effect in real-time. The status information will show “Modifying Power Meter Parameters…” when performing parameter modification.ICP DAS M 3133 240 CAN
Power Meter Utility - Fig 38

Please Note:

  1. There are only PT Ratio and CT Ratio settings for the COM Port connection with PM-311x.
  2. There are only PT Ratio and CT Ratio settings for the TCP/IP connection with PM-213x-MTCP.
  3. After finishing the modification of the PM-213x connection parameters (Baud Rate and Stop Bits), the system will temporarily interrupt the connection with the meter and will reconnect with the meter again with the new parameter settings. If the connection is established, the system will real-time retrieve and display all power measurement values. If the system fails to connect with the meter, it will continue to try to establish the connection by other Baud Rate and Stop Bits combination.

5.4 Restore the parameters of the meter to default factory settings
After successfully connecting with the meter via Power Meter Utility, the user can restore the parameters of the meter to default factory settings.

  • The default factory settings of the PM-213x parameters will be: Baud Rate: 19200, Stop Bits: 1, PT Ratio: 1, and CT Ratio: 1
  • The default factory settings of the PM-311x parameters will be: PT Ratio: 1 and CT Ratio: 1
  • The default factory settings of the PM-213x-MTCP parameters will be: PT Ratio: 1 and CT Ratio: 1

Follow the steps below to restore the parameters to default factory settings:
i. After successfully connecting with the meter, click on the “Default” button to restore the parameters of the meter to default factory settings. After the reset takes effect, the PM-213x parameters such as Baud Rate, Stop Bits, PT Ratio, and CT Ratio will appear to be default factory settings; The PM-311x / PM-213x-MTCP parameters such as PT Ratio and CT Ratio will appear to be default factory settings.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
39

ii. The status information will show “Return to Default Values” when the system is trying to restore the parameters of the meter to default factory settings.ICP DAS M 3133 240 CAN Power Meter Utility - Fig
40

Please Note:

  1. After finishing the modification of the PM-213x connection temporarily interrupt the connection with the meter and will reconnect with the meter again by the new parameter settings. If the connection is established, the system will real time retrieve and display all power measurement values. If the system fails to connect with the meter, it will continue to try to establish the connection by other Baud Rate and Stop Bits combination.

ICP DAS M 3133 240 CAN Power Meter Utility - Fig

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals