DOLD RN 5897-020 AC Network Insulation Monitor User Guide
- June 14, 2024
- DOLD
Table of Contents
- Product Description
- Circuit Diagram
- Connection Terminals
- Approvals and Markings
- Applications
- Function
- Function Diagram
- Flashing Codes Status LED
- Indicators
- Error Indication
- Technical Data
- UL-Data
- CCC-Data
- Standard Types
- Ordering Example for variants
- Accessories
- Connection Examples
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
DOLD RN 5897-020 AC Network Insulation Monitor User Guide
Product Description
The insulation monitor RN 5897/320 of the VARIMETER IMD family provides best
and up to date insulation monitoring of modern IT systems in an optimum and
state of the art way fulfilling the relevant standards.
The device can be used in the most flexible way for AC, DC and AC/ DC
systems. Mains areas of applications are non-earthed DC charging stations for
electric vehicles with mains voltages up to DC 1000 V, that need an extended
temperature range. The connection to the monitored voltage system is done via
one of the coupling units. The setting of the parameters and the switching
values is done by simple and operator friendly rotational switches on front of
the device. The operating status is indicated user friendly via a multicolour
LED. With a sealable transparent cover the device is protected against
manipulation.
Circuit Diagram
Connection Terminals
Your Advantages
- Suitable for DC charging stations for electric vehicles acc. to IEC/EN 61851-23:2014/AC:2016-06
- Insulation monitoring according to IEC/EN 61557-8
- Connection of an external coupling device RL 5898 for voltages up to AC 400 V / DC 500 V or RP 5898 for voltages up to AC 690 V / DC 1000 V
- Extended operating temperature range of – 40 … + 70 °C
- Very fast reaction time ≤ 1 s
- Optimised insulation resistance monitoring also during mains voltage variation
- Self-test every full operating hours
- Preventive fire and system protection
- Detection of symmetric and asymmetric insulation faults
- Universal application in non-earthed AC, DC, AC/DC networks
- Easy adjustment of response values and setting parameter via rotational switch
- Suitable for large leakage capacitances up to 5 µF
- Monitoring also with voltage-free mains
- Measuring circuit L1(+)/L2(-) with broken wire detection (can be switched off)
- Protective conductor PE1/PE2 with broken wire detection (can’t be switched off)
Features
- 2 separate adjustable response thresholds (using e.g. for pre-alarm and Alarm)
- Setting range of 1st response value (Pre-alarm): 20 kΩ … 500 kΩ
- Setting range of 2nd response value (alarm): 1 kΩ … 100 kΩ
- 1 changeover contacts each for insulation failures-Pre-alarm and -alarm
- Energized or de-energized on trip can be selected for indicator relay
- With multicolour status LED to indicate the state of operation.
- Automatic and manual device self-test
- Alarm storage selectable
- Protection against manipulation by sealable transparent cover
- External control input for combined test- / reset-button with additional Stop of the measuring function
- 3 wide voltage input for auxiliary voltage
- Additional coupling device is necessary
- Width 52.5 mm
Approvals and Markings
Applications
Insulation monitoring of:
- Non-earthed AC, DC, AC/DC networks
- DC charging stations for electric vehicles
- UPS systems
- Networks with frequency inverters
- Battery networks
- Networks with direct current drives
- Hybrid and battery-powered vehicles
- Mobile generator sets
Function
The device is supplied with DC auxiliary voltage via terminals A1(+) / A2. Switching on the auxiliary voltage (Power-On) is followed by an internal self- test for 12 s (see „Device test functions“). The test process is visible with the status LED. After this, measurement of the insulation resistance in the measuring circuits begins and the status LED changes into green.
Measuring circuit
(Insulation measurement between terminals L1(+) / L2(-) on the coupling device
and PE1/PE2 on the insulation monitor)
The insulation monitor RN 5897/320 can only be used with a coupling To
connect the insulation Monitor RN5897/320 to a coupling device the terminals
with identical designations are connected (VSG1, VSG2, L(+), L(-)) .The votage
system to be monitored is connected to L1(+) und L2(-) of the coupling device.
A broken wire detection that can be disabled provides a fault signal if both
terminals L1(+) and L2(-) are not linked by the connected network.
Broken wire between coupling device and insulation monitor cannot be directly
detected but the the measured value of the insulation resistance when one or
more connections are interrupted, is much lower then the real insulation value
which will cause a tripping of the alarm relays.
The type of the voltage system or the connection method (AC, DC, 3NAC) has to
be correctly adjusted on the rotational switch “UN” Also the terminals PE1 and
PE2 have to be connected with 2 separate wires to the protective earth. An
interruption of a wire also causes a fault signal (see section ”Behavior on
faulty connection”). The monitoring of the PE connection cannot be de-
activated.
To measure the insulation resistance an active measuring voltage with changing
polarity is connected between L1(+) and L2(-) and PE1/PE2. and indicated. The
relays for alarm K1 and pre-alarm K2 switch when dropping under the adjusted
response values. In addition the status LED changes to orange color on pre-
alarm or to red color on alarm.
Manual reset of fault message
With the 2-section rotational switch “UN”, manual or auto reset of the alarm
can be selected. If manual reset is activated the insulation fault signals of
the measuring circuit are stored when dropping under the adjusted response
values also if the insulation resistance goes back to healthy state. Pressing
the „Reset“ button on the front side for 2 s, the alarm signal is reset if the
actual insulation resistance is in healthy state.
Indicator relay for insulation fault signal
The function of the relaysK1 (contacts 11-12-14 for alarm) andK2 (contacts
21-22-24) can be altered between energised on trip (relay n.o.) or deenergized
on trip (relay n.c.). When energised on trip the relays energize when the
value drops below the setting, when de-energised on trip, the relays de-
energize when the value drops below the setting.
Disable the measuring function
Using the external control input X1/X2 the measuring function of the RN
5897/320 can be disabled. This could be used when several isolated voltage
systems with individual insulation monitors need to be coupled.
The measuring voltage is set to -90V (negative measuring phase) and the
evaluation of the measurement is stopped. The status of the output relays is
frozen and not changed any more. If the measurement is disabled the status LED
flashes continuously orange. Please be aware, only the evaluation of the
measurement is stopped and the measuring pulse is interrupted! A high
resistive disconnection to PE does not take place (see internal resistance).
Broken wire detection
As described in section “Measuring circuit”, the measuring circuits L(1+)/
L2(-) and the protective conductors PE1/PE2 are constantly monitored for wire
breaks – not only at Power-On or a manual or occasional automatic test. The
response time of PE1/PE2 monitoring is only a few seconds.
The response time of monitoring of L1(+)/L2(-) can be up to approx. 2 min.
Broken wire detection between L1(+) and L2(-) is performed via coupled
alternating voltage. This alternating voltage is short-circuited if the
terminals are connected to the connected mains at low-resistance.
The device detects that the mains to be monitored is properly connected.
capacitances should be avoided between L1(+) and L2(-), since the capacitive
reactance of these capacitances also short-circuits this alternating voltage.
The device would no longer detect a connection fault on L1(+)/L2(-).
Especially parallel lines should be prevented over larger distances.
IflargercapacitancesbetweenL1(+)/L2(-)alternating voltage interferes with the
system, the broken wire detection can be de-activated on the 2-section
rotational switch for alarm “RA”. It can be altered between continuously
disabled (Broken Wire Detect OFF), or continuously enabled (Broken Wire Detect
ON) for 10 seconds every 2 minutes. If the broken wire detection on
L1(+)/L2(-) is de-activated no AC voltage is injected. The broken wire
detection on PE1/PE2 cannot be de-activated.
Device test functions
Principally, 2 different test functions are implemented: The “self-test” and
the “expanded test”:
The self-test of the device is performed automatically after Power-On and
every full operating hours. It can also be triggered manually at any time by
pressing the “Test” button at the device front for 2s.
With the self-test, contrary to the expanded test, the status of the Indicator
relays is not affected; the sequence is as follows:
First the negative measuring pules is activated for about 5 s and the internal
measuring circuit is checked on failures. Then the positive measuring pulse is
activated for about 5 s and more internal tests are performed. If no failures
are detected, the normal measurement continuous. The extended test is started,
when during or at the end of above procedure (12 s) the button “Test” is
pressed again for 2 s.
The procedure is the same as above (2 measuring phases with 5 sec each) but in
addition the output relays K1 and K2 go into alarm state. The Status LED shows
flash code 2 in orange colour. The test phases will be continuously repeated.
The extended test can be finished after the first complete sequence (approx.
10 sec) by pressing the “reset” button for 2 seconds. The device starts the
insulation monitoring again.
- Test signal: Button Test > 2 s or X1/X2 > 1,5 s and < 10 s 2
- Reset signal: Button Reset > 2 s or X1/X2 < 1,5 s 3
- To initiate the extended test (Test 2) the test signal must be operated within the self test (Test 1) again.
- The reset signal has here no function, as the first complete sequence of extended test (Test 2) is not finished.
Behaviour with internal device faults
If internal device faults were detected during the test function, the status
LED flashes permanently red. The indicator relays K1 and K2 switch to the
alarm state.
Behavior on faulty connection
When detecting broken wire on terminals L1(+)/L2(-), the measurement is
disabled. The reaction time could be up to 2 min. The monitoring relays K1 and
K2 go in alarm state, the status LED shows flash code 1 in red colour. After
removing the interruption the fault is automatically reset (max. reaction time
up to 2 min) and the measurement of the insulation of the protective earth
connections PE1/PE2 causes the same reaction as interrupting the measuring
circuit, only the status LED shows flash code 2 in red colour.
External control input
To terminals X1/X2 an external combined Test-/Reset button can be connected.
If the terminals X1/X2 are bridged for approx. > 1,5 s and < 10 s the test
mode is started. This has the same function as pressing the internal test
button. When bridging X1/X2 for < 1,5 s, a stored alarm will be reset. This
has the same function as pressing the internal reset button.
If X1/X2 is activated for > 10 s, the measuring function is stopped.
The measuring function remains suspended for the duration of the control of
X1/X2.
Programming/setting of parameters/set-up of the insulation monitor
All settings are made via 3 rotational switches on the front of the device.
To avoid unauthorised manipulation of the settings, the unit has a sealable
transparent cover on the front.
With the first rotational switch “RA” the response value for Alarm is
selected.
In addition the rotational switch has 2 sections. If the rotational switch is
in the first section the broken wire detection of the measuring circuit is
continuously on. If the rotational switch is in the second section it is
continuously off. The second rotational switch “RpA” has also 2 sections and
selects the pre alarm value as well as the output function. in section 1 the
unit is de-energised on trip (n.c.) in section 2 on energised on trip (n.o.).
Thethirdrotationalswitchselects”UN”selectsthevoltagesystemconnection and
manual or auto reset it has also 2 sections. In section one the unit is on
auto reset, in section 2 it is on manual reset. Changes of the setting the
unit accepts immediately without restart.
Function Diagram
Flashing Codes Status LED
Indicators
Error Indication
⚠ Risk of electrocution!
Danger to life or risk of serious injuries.
- Disconnect the system and device from the power supply and ensure they remain disconnected during electrical installation.
- Determine voltage free status by using appropriate instruments
- The terminals of the control input X1-X2 have no galvanic separation to the measuring circuit L1(+) and L2(-) and are electrically connected together, therefore they have to be controlled by volt free contacts or bridge. These contacts ore bridges must provide a sufficient separation depending on the mains voltage on L1(+)-L2(-).
- Please do not connect external voltage to terminals X1/X2. The control must only be made by bridging X1 and X2.
- The coupling unit RL 5898 or RP 5898 must only be used in conjunction with the RP5897/320 on a voltage system and not just by itself.
! Attention!
- Before checking insulation and voltage, disconnect the monitoring device RN 5897/320 from the power source!
- In one voltage system only one insulation monitor can be used. This has to be observed when interconnecting two separate systems..
- Device terminals PE1 and PE2 must always be connected via separate lines to different terminal points of the protective-conductor system.
- The device must not be operated without PE1/PE2 connection!
ℹ Attention!
- The Main Measuring Circuit can be connected with its terminalsL1(+)and L2(-) both to the DC and also AC side of a mixed network; it is done most practically where the primary incoming power supply takes place e.g. with battery networks with connected inverters on the DC side, with Generators/Transformers with connected Rectifiers or inverters on the AC-side. To monitor a 3NAC system the device can be connected single pole, (L(+) and L(-) are bridged, to the neutral of the 3p4w system. The 3 phases have a low-Ωic (approx. 3 – 5 Ω) connection via the transformer windings so also insulation failures of the not directly connected phases are detected. Via the rotary switch “UN” the correct type of network needs to be selected (see „Connection Examples“).
- If a monitored AC system includes galvanically connected DC circuits (e.g. via a rectifier), an insulation failure on the DC side can only be detected correctly, when a current of min 10 mA can flow via the semiconductor connections.
- If a monitored DC system includes galvanically connected AC circuits (e.g. via an inverter), an insulation failure on the AC side can only be detected correctly, when a current of min 10 mA can flow via the semiconductor connections.
- The insulation monitor RN 5897/320 can only be used together with a coupling device.
Technical Data
UL-Data
CCC-Data
Switching capacity
To AC 15
NO contact: 3 A / AC 230 V
NC contact: 1 A / AC 230 V
ℹ Technical data that is not stated in the CCC-Data, can be found in the technical data section.
Standard Types
Ordering Example for variants
Accessories
Connection Examples
1) Auxiliary voltage UH (A1(+)/A2) ) can also be sourced from the monitored voltage system.
The voltage range of the auxiliary supply has to be taken into account.
2) Control input X1/X2 for external combined Test-/Reset-button with Stop of the measuring function:
• Control 1.5 s < t < 10 s: Test function
• Control < 1.5 s: Reset function
• Control > 10 s: Stop of measuring function