legrand XEVPED1 EV Charger Pedestal User Manual
- June 14, 2024
- Legrand
Table of Contents
- legrand XEVPED1 EV Charger Pedestal User Manual
- IMPORTANT:
- SINGLE PEDESTAL PIÉDESTAL UNIQUE PEDESTAL INDIVIDUAL
- PACKING LIST
- MAKING DRILL HOLES
- RÉALISATION DE TROUS DE FORAGE **REALIZACIÓN DE AGUJEROS
- FEED IN SUPPLY POWER CONDUIT
- Read More About This Manual & Download PDF:
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
legrand XEVPED1 EV Charger Pedestal User Manual
IMPORTANT:
Please read all instructions before beginning installation
Legrand electrical systems conform to and should be properly grounded in
compliance with requirements of the current National Electrical Code or codes
administered by local authorities.
All electrical products may present a possible shock or fire hazard if
improperly installed or used. Legrand electrical products may bear the mark of
a Nationally Recognized Testing Laboratory and should be installed in
conformance with current local and/or the National Electrical Code.
SINGLE PEDESTAL PIÉDESTAL UNIQUE PEDESTAL INDIVIDUAL
BACK-TO-BACK PEDESTAL CAISSON DOS-À-DOS PEDESTAL ADOSADO
USE OF THIS MANUAL
This installation manual is intended for qualified personnel only. The information and instructions in the manual about selecting the location, installation and connection of the charging station must be adhered to.
PACKING LIST
#
| Item Name/Description Nom de l’article/Description
Denominación/Descripción del elemento
| Single Version Quantity (pcs) Version unique Quantité (pcs) Cantidad,
versión individual (piezas)| Back-to-back Version Quantity
(pcs) Version dos à dos Quantité (pcs) Cantidad, versión adosada
(piezas
---|---|---|---
1
| Pedestal Socle Pedestal| ****
1
| ****
1
2
| Connector Holster & Hook
Étui et crochet pour connecteur Funda y gancho del conecto
| **Connector Holster & Hook come inside the EV Charger carton(s) L’étui et le crochet pour connecteur s’insèrent à l’intérieur du ou des cartons du chargeur EV
La funda del conector y el gancho vienen dentro de la(s) caja(s) del cargador del VE.
3| M5*22mm Screw| 4+1| 8+2
4
| M8*100mm Expansion Anchor Bolt
Boulon d’ancrage à expansion M8 100 mm Perno de anclaje de expansión M8 100 mm
| ****
4
| ****
4
5
| M820mm Bolt Boulon M8 20 mm Perno M8*20 mm| ****
4+1
| ****
8+2
6
| Installation Manual Manuel d’installation Manual de instalación| ****
1
| ****
1
EV Charger(s) must be purchased separately
Le ou les chargeurs EV doivent être achetés séparément.
*Los cargadores para VE deben adquirirse por separado.
Optional items. These items are not included and must be purchased separately. Articles en option. Ces articles ne sont pas inclus et doivent être achetés séparément.
Elementos opcionales: Estos elementos no están incluidos y deben adquirirse por separado.
7
| Base Cover Couverture de la base Tapa de la base|
1
|
1
MAKING DRILL HOLES
RÉALISATION DE TROUS DE FORAGE **REALIZACIÓN DE AGUJEROS
TALADRADOS**
Mark the 4 holes on the concrete foundation using the base- plate of the pedestal. Make sure that the power feed conduit is located precisely underneath the opening in the base- plate. Drill the 4 mounting holes: 13/32″ (10mm) in size, minimum depth of 3 1/2″ (84mm). Hammer the M8*100mm expansion anchor bolts in place.
FEED IN SUPPLY POWER CONDUIT
CONDUIT D’ALIMENTATION DE L’ALIMENTATION INSTALACIÓN DEL CONDUCTO DE ALIMENTACIÓN
-
Feed the conduit from the bottom through the pedestal upwards through the cable opening.
. -
Position the pedestal directly over the anchor bolts. Attach the pedestal to the foundation using the flat washers and spring washers that were included with the anchor bolts
-
Release the 8pcs of M5*12mm screws of the wiring access panel at the back
-
Optional:
Slide base cover halves around pedestal and secure with 4pcs M5*12mm screws -
*** Remove 2 pcs security screws from EV charger. Set screws aside for Mounting the Charging Station – Step 5.
Takeoff the wall-mounted bracket of the charger, and fix it in the corresponding position on the pedestal with 4 pcs of M820mm bolts for single pedestal. Repeat one more time on the back for Back-to-back version. -
Feed the conductors from the EV charger unit into the conduit and elbow fitting. If necessary, guide the conductors down into the pedestal by reaching inside the wiring access opening.
-
First, secure the top of the EV charger unit by holding the unit at an angle and placing it onto the hook at the top of the bracket
-
Rotate the EV charger unit down into place while at the same time placing the other end of the conduit into the fitting on the EV charger unit.
-
If necessary, tighten the nut on the fitting on the EV charger unit and the elbow fitting.
-
Feed source power conductors into the wiring access panel area. Make wiring connection in accordance with the instructions of the EV Charger unit.
Replace the access panel and screw -
Remove Connector Holster & Hook from the EV Charger carton(s). Use 4pcs of M5*22mm screws to fix the connector base and hook in the corresponding position. Repeat one more time on the back for Back-to-back version
Read More About This Manual & Download PDF:
References
- Legrand CA | Delivering and Managing Power, Light, and Data
- Legrand US | Delivering and Managing Power, Light, and Data
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>