APsystems DS3-S Solar Microinverter User Manual
- June 4, 2024
- APsystems
Table of Contents
- Important Safety Instructions
- APsystems Microinverter System Introduction
- APsystems Microinverter DS3 series Introduction
- APsystems Microinverter System Installation
- APsystems microinverter system operating instructions
- Troubleshooting
- Replace a microinverter
- Technical Data
- Wiring Diagram
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
DS3-S Solar Microinverter
**User Manual
**
APsystems Microinverter User Manual
APsystemAsPsDySs3teMmiscrDoSin3vseerrtieers
(DS3-S, DS3-L, DS3) Microinverters
(For Australia / New Zealand)
ALTENERGY POWER SYSTEM Inc. Aunz.APsystems.com
APsystems Australia Suite 502, 8 Help Street, Chatswood NSW 2067 Australia
TEL: 61 (0)2-8034-6587 EMAIL:
info.aunz@apsystems.com
http://q-r.to/1OrC
Please scan this QR code to have access to our APPs and Products information
© All Rights Reserved
Important Safety Instructions
This manual contains important instructions to follow during the installation and maintenance of the APsystems Photovoltaic Grid-connected Microinverter. To reduce the risk of electrical shock and ensure a safe installation and operation of the APsystems Microinverter, the following symbols appear throughout this document to indicate dangerous conditions and important safety instructions. Specifications are subject to change without notice. Please ensure you are using the most recent update found at https://aunz.apsystems.com/resources/library/
WARNING
This indicates a situation where failure to follow instructions may cause a
serious hardware failure or personnel danger if not applied appropriately. Use
extreme caution when performing this task.
NOTICE
This indicates information that is important for optimized microinverter
operation. Follow these instructions closely.
1.1 Safety Instructions
-
Only qualified professionals should install and/or replace APsystems Microinverters.
-
Perform all electrical installations in accordance with local electrical codes.
-
Before installing or using the APsystems Microinverter, please read all instructions and cautionary markings in the technical documents and on the APsystems Microinverter system and the solar array.
-
Do NOT disconnect the PV module from the APsystems Microinverter without first disconnecting the AC power.
-
Be aware that the body of the APsystems Microinverter is the heat sink and can reach a temperature of 80°C. To reduce risk of burns, do not touch the body of the Microinverter.
-
Do NOT attempt to repair the APsystems Microinverter. If the microinverter is suspected to be faulty, please contact your local APsystems Technical Support to start troubleshooting and obtain a RMA (Return Merchandise Authorization) number to start the replacement process if needed. Damaging or opening the APsystems
Microinverter will void the warranty. -
Caution! When connecting a microinverter, it is recommended to first connect the AC Bus cable to the ground then connect the AC connector to ensure proper earthing of the microinverter, then do the DC connections. When disconnecting a microinverter disconnect the AC by opening the branch circuit breaker first but maintain the protective earthing conductor in the branch circuit breaker connected to the microinverter, then disconnect the DC inputs.
-
Please install AC breakers on the AC side of the inverter.
1.2 Radio Interference Statement
EMC Compliance: The APsystems Microinverter can radiate radio frequency
energy. If not installed and used in accordance with the instructions, it may
cause harmful interference to radio communication.
APsystems Microinverter complies with EMC regulations, which are designed to
provide reasonable protection against harmful interference in a residential
installation.
Nonetheless, if the Microinverter does cause harmful interference to radio or
television reception, you are encouraged to try to correct the interferences
by one of more of the following measures:
A) Reorient or relocate the receiving antenna
B) Increase the separation between the Microinverter and the receiver
C) Connect the Microinverter into an outlet on a circuit different from that
to which the receiver is connected
If none of the recommendations suggested above bring significant improvement
in terms of interferences, please contact your local APsystems Technical
Support.
1.3 Symbols replace words on the equipment, on a display, or in manuals
| Trademark
---|---
| Caution, risk of electric shock.
| Caution, hot surface.
| NOTICE, danger! This device is directly connected with electricity
generators and public grid.
| Refer to the operating instructions.
Qualified personnel| Person adequately advised or supervised by an
electrically skilled person to enable him or her to perceive risks and to
avoid hazards which electricity can create. For the purpose of the safety
information of this manual, a “qualified person” is someone who is familiar
with requirements for safety, electrical system and EMC and is authorized to
energize, ground, and tag equipment, systems, and circuits in accordance with
established safety procedures. The inverter and photovoltaic system may only
be commissioned and operated by qualified personnel.
APsystems Microinverter System Introduction
The APsystems Microinverter is used in utility-interactive grid-tied applications, comprised of three key elements:
- APsystems Microinverter
- APsystems Energy Communication Unit (ECU)
- APsystems Energy Monitor and Analysis (EMA) web-based monitoring and analysis system
This integrated system improves safety; maximizes solar energy harvest;
increases system reliability, and simplifies solar system design,
installation, maintenance, and management.
Safety with APsystems Microinverters
In a typical string inverter installation, PV modules are connected in series.
The voltage adds up to reach a high voltage value (from 600Vdc up to 1000Vdc)
at the end of the PV string. This extreme high DC voltage brings a risk of
electrical shocks or electrical arcs which could cause a fire. When using an
APsystems microinverter, PV modules are connected in parallel. The voltage at
the back of each PV module never exceeds PV modules Voc, which is lower than
60Vdc for most PV modules used with APsystems microinverters. This low voltage
is considered “safe to touch” by fire departments and negates the risk of
electrical shock, electrical arcs, and fire hazards.
APsystems Microinverters maximize PV energy production
Each PV module has individual Maximum Peak Power Tracking (MPPT) control,
which ensures that the maximum power is produced to the utility grid
regardless of the performance of the other PV modules in the array. When PV
modules in the array are affected by shade, dust, different orientation, or
any situation in which one module underperforms compared with the other units,
the APsystems Microinverter ensures top performance from the array by
maximizing the performance of each module individually within the array.
More reliable than centralized or string inverters
The distributed APsystems Microinverter system ensures that no single point of
system failure exists across the PV system. APsystems Microinverters are
designed to operate at full power at ambient outdoor temperatures of up to 65
deg C (or 149 F). The inverter case is designed for outdoor installation and
complies with the IP67 environmental enclosure rating.
Simple to install
APsystems Microinverters is compatible with most of 60 and 72 cell PV modules
or 120 and 144 half-cut cells PV modules. (In order to confirm the
compatibility of PV module with APsystems microinverter, feel free to check
our online “E-decider” module compatibility tool or contact your local
APsystems Technical Support). Installation requires a minimum number of
accessories and microinverters offer a lot of versatility to the installer:
microinverters can indeed be installed on different roofs with different
orientations or with modules having different orientations. In the same way,
end-users can expand their system whenever they want with microinverters.
Smart system performance monitoring and analysis
The APsystems Energy Communication Unit (ECU) is installed by simply plugging
it into any wall outlet and providing an Ethernet or Wi-Fi connection to a
broadband router or modem. After installing and setting the ECU (see ECU
Instruction Manual), the full network of APsystems Microinverters
automatically reports to the APsystems Energy Monitor and Analysis (EMA) web
server.
APsystems Microinverter DS3 series Introduction
APsystems 3rd generation of dual microinverters are reaching unprecedented
power outputs of 625VA, 750VA or 880VA to adapt to today’s larger power
module. With 2 independent MPPT, encrypted Zigbee signals, the DS3-S, DS3-L,
and DS3 benefit from an entirely new architecture and are fully backward
compatible with the QS1 and YC600 microinverters. The innovative and compact
design makes the product lighter while maximizing power production. The
components are encapsulated with silicone to reduce stress on the electronics,
facilitate thermal dissipation, enhance waterproof properties, and ensure
maximum reliability of the system via rigorous testing methods including
accelerated life testing. A 24/7 energy access through Apps or web-based
portals facilitates remote diagnosis and maintenance.
The DS3 series is interactive with power grids through a feature referred to
as RPC (Reactive Power Control) to better manage photovoltaic power spikes in
the grid. With a performance and an efficiency of 97%, unique integration with
20% fewer components, APsystems DS3-S, DS3-L and DS3 are a game changer to
residential and commercial PV. Key Product Feature:
- One microinverter connects to two PV modules
- Maximum output power reaching 625VA(DS3-S), 750VA (DS3-L) or 880VA (DS3)
- Two input channels with independent MPPT
- Reactive Power Control
- Maximum reliability, IP67
- Encrypted Zigbee communication
- Safety protection relay integrated
Single phase microinverter. Possible to install in a balanced 3-phase system
APsystems Microinverter System Installation
A PV system using APsystems Microinverters is simple to install. Each Microinverter easily mounts on the PV racking, directly beneath the PV module(s). Low voltage DC wires connect from the PV module directly to the Microinverter, eliminating the risk of high DC voltage. Installation MUST comply with local regulations and technical rules. Special Statement: we advise the installation of an RCD breaker only if required by the local electrical code.
WARNING
- Perform all electrical installations in accordance with local electrical codes.
- Be aware that only qualified professionals should install and/or replace APsystems Microinverters.
- Before installing or using an APsystems Microinverter, please read all instructions and warnings in the technical documents and on the APsystems Microinverter system itself as well as on the PV array.
- Be aware that the installation of this equipment includes the risk of electric shock.
- Do not touch any live parts in the system, including the PV array, when the system has been connected to the electrical grid.
NOTICE
Even if not required by the local electrical code, we strongly recommend to
install surge protection devices in the dedicated AC box.
4.1 Additional accessories supplied by APsystems
- AC Y3 Bus cable
- AC Y3 Bus Cable End Cap
- AC Y3 Bus Cable Y-CONN Cap
- AC Y3 Bus Cable Unlock Tool ECU
- AC connectors male/female
4.2 Other required accessories not supplied by APsystems
In addition to your PV array and its associated hardware, you may need the
following items:
- An AC connection junction box
- Mounting hardware suitable for module racking
- Sockets and wrenches for mounting hardware
4.3 Installation Procedures
4.3.1 Step 1 – Verify that grid voltage matches the microinverter rating
4.3.2 Step 2 Y3 AC Bus Cable distribution
a. Each connector drop of the AC Bus cable matches the position of the
microinverter.
b. One end of the AC bus cable is used to access the junction box into the
power grid.
c. Wire the conductors of the AC bus: L – BROWN; N – BLUE – YELLOW GREEN.
WARNING
Wiring color codes can be different according to local regulations. Check
all the wires of the installation before connecting to the AC bus to be sure
they match. Improper cabling can irreparably damage the microinverters: such
damage is not covered by the warranty.
WARNING
It is strictly prohibited to hand carry the microinverter by its AC cable.
4.3.3 Step 3 – Attach the APsystems Microinverters to the Racking
a. Mark the location of the microinverter on the rack, with respect to the PV
module junction box or any other obstructions.
b. Mount one microinverter at each of these locations using hardware
recommended by your module racking vendor.
Figure 2
WARNING
Install the microinverters (including DC and AC connectors) under the PV
modules to avoid direct exposure to rain, UV or other harmful weather events.
Allow a minimum of 1.5 cm (3/4”) below and above the casing of the
microinverter to allow proper airflow. The racking must be properly grounded
as per the local electrical code.
4.3.4 Step 4 – Ground the system
Y3 AC Bus cable has an embedded PE wire: this might be sufficient to ensure
proper grounding of the whole PV array. However, in areas with special
grounding requirements, external grounding work may still be needed, using the
grounding lug supplied with the Microinverter.
Figure 3
4.3.5 Stpe 5 – Connect the APsystems microinverter to AC bus cable
Insert the microinverter AC connector into the trunk cable connector. Make
sure to hear the “click” as proof of a robust connection.
Figure 4
Best Practice: Use the AC Bus Cable Unlock Tool to disconnect the connectors.
Figure 5
NOTICE
Check the microinverter technical data page 19 to confirm the maximum
allowable number of microinverters on each AC branch of the circuit.
AC connector interfaces as from left to right. Figure 6
Cover any unused connectors with Bus Cable Y-CONN Cap to protect the unused
connectors.
Figure 7
4.3.6 Step 6 – Install a Bus Cable End Cap at the end of AC bus cab le
Figure 8
4.3.7 Step 7 – Connect APsystems Microinverters to the PV Modules
Figure 9
NOTICE
When plugging in the DC cables, the microinverter should immediately blink red
one time and green ten times. This will happen as soon as the DC cables are
plugged in and will show that the microinverter is functioning correctly. This
entire check function will start and end within 10 seconds of plugging in the
unit, so pay careful attention to these lights when connecting the DC cables.
WARNING
Double check to make sure all of the AC and DC wiring has been correctly
installed. Ensure that none of the AC and/or DC wires are pinched or damaged.
Make sure that all of the junction boxes are properly closed.
WARNING
Each PV panel must be carefully connected to the same channel. Make sure to
not split positive and negative Dthe C cables into two different input
channels: microinverter will become damaged and the warranty will not apply.
4.3.8 Step 8 – Complete the APsystems installation map
a. Each APsystems Microinverter has 2 removable serial number labels.
b. Complete the installation map by sticking the ID label of each
microinverter in the right location.
c. The second serial number label could be stuck on the solar module frame,
which could help later to confirm the position of the microinverter without
dismantling the PV module. Figure 10
NOTICE
- The layout of the microinverters’ serial numbers installation map is only suitable for typical installation
- The installation Map is available in the last page appendix of this manual.
- Use ECU_APP (available in the EMA Manager) to scan the serial numbers on the map when setting up the ECU (see ECU instruction manual for more info).
4.3.9 Step 9 – Warning Notice
A warning notice must be placed in such a way that anyone with access to live
parts is warned in advance of the need to switch off these parts. It is
imperative to verify that the power supply, measurement circuits (sense lines)
and other parts are not isolated from the network when the interface
protection switch is open. As a minimum, warning labels shall be placed:
- On the switchboard (DNO panel and consumer unit) that has the PV generator connected to it;
- On all switchboards in between the consumer unit and the PV generator itself;
- On, or in the PV generator itself;
- At all points of isolation for the PV generator
APsystems microinverter system operating instructions
To operate the APsystems microinverter PV system:
- Turn ON the AC circuit breaker on each microinverter AC branch circuit.
- Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after approximately one minute of waiting time.
- Microinverter data will be available in the EMA Manager APP or in the EMA web portal.
Alternatively, LED sequences could be an indicator of microinverters status (see section 6.1)
NOTICE
Once the ECU has been commissioned properly, the APsystems Microinverters
will start to send performance data to the ECU. The time required for all of
the Microinverters in the system to report to the ECU will vary depending on
the number of Microinverters in the system.
Troubleshooting
Qualified personnel can use the following troubleshooting steps if the PV
system does not operate correctly:
6.1 Status Indications and Error Reporting
Assuming they are easily accessible and visible, Operation LEDs can give a
good indication of the microinverter’s status
6.1.1 Startup LED
One short red and ten short green blinks when DC power is first applied to the
Microinverter indicates a successful Microinverter startup.
6.1.2 Operation LED
Flashing Slow Green (5 sec. gaps) – Producing power and communicating
with ECU
Flashing Slow Red (5 sec. gaps) – Not producing power
Flashing Fast Green (2 sec. gap) – Not communicating with ECU over
60mins, but still producing power.
Flashing Fast Red (2 sec. gaps ) – Not communicating with ECU over 60mins
and not producing power.
Steady Red default, DC side ground fault protection, see 6.1.3
6.1.3 GFDI Error
A solid red LED indicates the Microinverter has detected a Ground Fault
Detector Interrupter (GFDI) error in the PV system. Unless the GFDI error has
been cleared, the LED will remain red and the ECU will keep reporting the
fault. Please contact your local APsystems Technical Support.
6.2 ECU_APP
APsystems ECU_APP (available in the EMA Manager APP) is the recommended tool
to do on-site troubleshooting. When connecting the ECU_APP to the ECU hotspot
(please check ECU User Manual for more detailed information), the installer
can check every microinverter status (production, communication) but also
Zigbee signal strength, grid profile, and other insightful data helping the
troubleshooting.
6.3 Installer EMA (web portal or EMA Manager APP)
Before going on-site for troubleshooting, the installer can also check all
information remotely using his installer account, either on the web or using
the EMA Manager APP (see EMA Manager APP User Manual for more detailed
information). Having access to module data (DC, AC, voltages, and currents)
gives the first indication on potential issues.
6.4 Trouble Shooting Guide
Professional installers can also refer to our Troubleshooting Guide
(https://aunz.apsystems.com/resources/library/, section libraries) for more
in-depth guidelines on how to troubleshoot and fix PV installations powered by
APsystems microinverters.
6.5 APsystems Technical Support
The APsystems local Technical Support team is available to support
professional installers in becoming familiar with our products and to
troubleshoot installations when needed.
WARNING”
Do not attempt to repair APsystems Microinverters. Please contact your
local APsystems Technical Support.
WARNING
- Never disconnect the DC wire connectors under load. Ensure that no current is flowing in the DC wires prior to disconnecting.
- Always disconnect AC power before disconnecting the PV module wires from the APsystems Microinverter.
- The APsystems Microinverter is powered by PV module DC power. AFTER disconnecting the DC power, when reconnecting the PV modules to the Microinverter, be sure to watch for the quick red light followed by ten short green LED flashes.
6.6 Maintenance
APsystems microinverters do not require any specific regular maintenance.
Replace a microinverter
Follow the procedure to replace a failed APsystems Microinverter
A. Disconnect the APsystems Microinverter from the PV Module, in the order
shown below:
- Disconnect the AC by turning off the branch circuit breaker.
- Disconnect the inverter AC connector from the AC Bus.
- Disconnect the PV module DC wire connectors from the microinverter.
- Remove the Microinverter from the PV array racking.
B. Install a replacement Microinverter to the rack. Remember to observe the
flashing green LED light as soon as the new Microinverter is plugged into the
DC cables.
C. Connect the AC cable of the replacement Microinverter to the AC bus.
D. Close the branch circuit breaker, and verify the proper operation of the
replacement Microinverter.
E. Update the microinverter in the EMA Manager through the “Replace” function
and update the system’s map with new serial number labels.
Technical Data
WARNING
- Be sure to verify that the voltage and current specifications of your PV module are compatible with the range allowed on APsystems Microinverter. Please check the microinverter datasheet.
- DC operating voltage range of the PV module must be within an allowable input voltage range of the APsystems Microinverter.
- The maximum open circuit voltage of the PV module must not exceed the specified maximum input voltage of the APsystems.
8.1 DS3 series Microinverter Datasheet
Model | DS3 | DS3-L | DS3-S |
---|---|---|---|
Input Data (DC) | |||
Recommended PV Module Power (STC) Range | 250Wp-480Wp+ | 255Wp-550Wp+ | 300Wp- |
660Wp+
Peak Power Tracking Voltage| 22V-48V| 25V-55V| 32V-55V
Operation Voltage Range| 16V-60V| 16V-60V| 26V-60V
Maximum Input Voltage| | 60V|
Maximum Input Current| 16A x 2| 18A x 2| 20A x 2
Output Data (AC)| | |
Maximum Continuous Output Power| 625VA| 750VA| 880VA
Nominal Output Voltage/Range’| | 230V/180V-260V|
Nominal Output Current| 2.7A| 3.3A| 3.8A
Nominal Output Frequency/Range’| | 50Hz/48Hz-51Hz|
Nominal Output Frequency/Range’
Power Factor(Default/Adjustable)| | 0.99/0.8 leading…0.8 lagging|
Maximum Units per 20A Branch”| 7 units| 6 units| 5 units
Efficiency|
---|---
Peak Efficiency| 97%
CEC Efficiency| 96.50%
Nominal MPPT Efficiency| 99.50%
Night Power Consumption| 20mW
Mechanical Data|
Operating Ambient Temperature Range| -40°C to +65°C
Storage Temperature Range| -40°C to+85°C
Dimensions (W x H x D)| 262mm X 218mm X41.2mm
Weight| 2.6kg
AC Bus Cable| 2.5mm2
DC Connector Type| Stäubli MC4 PV-ADBP4-S2&ADSP4-S2
Cooling| Natural Convection – No Fans
Enclosure Environmental Rating| IP67
Features|
Communication (Inverter To ECU)| Encrypted ZigBee
Isolation Design| High-Frequency Transformers, Galvanically Isolated
Energy Management| Energy Management Analysis (EMA) system
***Warranty| 10 Years Standard; 15 Years Optional
Compliances|
Safety, EMC & Grid Compliances| AS/NZS 4777.2;IEC 62109-1,IEC62109-2;
EN61000-6-3
Nominal voltage/frequency range can be extended beyond nominal if required by the utility.
Limits may vary. Refer to local requirements to define the number of
microinverters per branch in your area.
To be eligible for the warranty, APsystems microinverters need to be
monitored via the EMA portal. Please refer to our warranty T&Cs available on
emea.APsystems.com.
© All Rights Reserved
Specifications are subject to change without notice please ensure you are
using the most recent update found at web : emea.APsystems.com
Wiring Diagram
9.1 Sample Wiring Diagram – Single Phase APsystems Microinverter & Energy Communication Unit Installation Map
The APsystems Installation Map is a diagram of the physical location of each
microinverter in your PV installation. Each APsystems microinverter has two
serial number labels. Peel the one label and affix it to the respective
location on the APsystems installation map.
Installation Map Template
Installer:| PV module type:………………………………………….Qty:| Sheet __**of** __|
s
---|---|---|---
Owner:| Microinverter Type: …………………………………………….. Qty:
| Column 1| Column 2| Column 3| Column 4| Column 5| Column 6| Column 7
Row 1| | | | | | |
Row 2| | | | | | |
Row 3| | | | | | |
Row 4| | | | | | |
Row 5| | | | | | |
Row6| | | | | | |
Row 7| | | | | | |
Row 8| | | | | | |
Row 9| | | | | | |
Row10| | | | | | |
References
- Index of /
- Home - APsystems EMEA
- Documents Library for Australia & New Zealand – APsystems Australia & New Zealand | The global leader in multi-platform MLPE technology
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>