Plastica SSW MOU 16 Chop Saw Mobile Hoist Instructions

June 13, 2024
Plastica

SSW MOU 16 Chop Saw Mobile Hoist

Product Information

Product Name Mobile Hoist

Product Usage Instructions

  1. Ensure that safety equipment is worn at all times when
    operating the mobile hoist.

  2. Carefully unwind the chain from the frame.

  3. Pull the chain up or down to the desired height and activate
    the brakes.

  4. If lifting a mould from the machine, ensure that the load’s
    weight, eye bolt, and shackle do not exceed the Safe Working Load
    (SWL) of 1 tonne. Secure the load in the hook using both the
    shackle and eye bolt.

  5. Lift the load clear of the machine using the lifting chain.
    Once clear, lower the mould with the chain and place it on a
    lifting load truck or pallet.

  6. If finished, take the mould away and return the hoist to its
    location. If inserting a new mould, follow section 4.

  7. Do not use the machine unless trained and authorized by a
    Manager/Setter.

Training Confirmation

Name [Name of the person who received training]
Training Date [Training date]

I confirm that I have received the above training and fully
understand every point that was explained to me. I will wear the
required Personal Protective Equipment (PPE) when using the
machinery and take all necessary steps to ensure my own safety. If
needed, I will ask for further training and immediately inform the
Supervisor or Manager of any issues with the machinery.

Name [Name of the person confirming training]
Signed [Signature]
Date [Confirmation date]

I confirm that I have trained the aforementioned person and that
they fully understand how to use the mobile hoist, have received
the required PPE equipment, and know to inform me immediately of
any issues with the machinery or if they require further training.
I authorize this person to use the mobile hoist.

Name [Name of the authorized trainer]
Signed [Signature]
Date [Authorization date]

Safe System of Work OPERATING AND SAFETY INSTRUCTIONS
FOR USING THE MOBILE HOIST

Name: ……………………………………………………….. Training Date:……………………………..

Instruction

Understood

or X

1 Explain that safety equipment must be used at all times

and why ­ safety boots must be used at all times when

running machines.

2 Carefully unwind the chain from frame.

3 Pull up or down chain to desire height. Activate brakes.

4 If you are lifting a mould from the machine, Ensure the

loads weight, eye bolt and shackle do not exceed the

SWL 1 tonne. Make sure the load is secured in the hook.

Using both shackle and eye bolt.

5 Lift the load clear of the machine using the lifting chain.

Once you are clear lower mould with chain and place

mould on lifting load truck or pallet.

6 Take mould away, take hoist back to its location. Or insert

new mould as section 4.

6 Do not use any machine unless trained and authorised by

Manager/ Setter

I have received the above training and fully understand every point that was explained to me. I confirm that I will wear the required PPE equipment when using the above machinery and take all steps to ensure my own safety. I will ask for further training if I need to and will immediately inform the Supervisor or Manager if there are any issues with the machinery.
Name: ………………………………………………………………………………………………………….
Signed: ……………………………………………………………….. Date:…………………………………
I confirm that I have trained the aforementioned person and that they fully understand how to use the above machinery, have received the required PPE equipment and know to inform me immediately of any issues with the machinery or if they require further training. I authorise this person to use the machinery detailed above.
Name: ………………………………………………………………………………….(Authorised Trainer)
Signed …………………………………………………………………… Date: ……………………………

SSW MOU 16 ­ 27/02/18

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals