Speedy Bee Master 5 V2 Frame Installation Guide
- June 13, 2024
- Speedy Bee
Table of Contents
Speedy Bee Master 5 V2 Frame
CNC camera mount and camera side plate installation
Antenna Installation Sequence
- insert the O-ring into the antenna to secure it on the TPU antenna base.
Install the multi-function antenna base
Note: pictures for assembly reference only. The frame doesn’t include an antenna)
- Install the plate on one side and the GPS base
- Install the T-shaped antenna
- Choose a suitable VTX antenna base
- Install the plate on the other side
Install arms and anti-vibration module
(Complete the installation of 4 arms in turn)
- Screws pass through the bottom plate and the intersection position of the arms in turn
- Install the anti-vibration stack module to the corresponding position
- Install the screws on both sides in the same way
- Install 4 arms in the same way
Install middle plate
- Install the middle plate to the corresponding 6 screw positions
- Tighten the two press-in nuts where the arms intersect
Combination with completed parts 1 and 2
- Combination of frame and CNC camera mount
- Install 7075 stand-off
Install the rear top plate and battery anti-slip silicone
Arm foot mount installation
- Install the 3D-printed foot mount to the arms
- Use a screw of proper length based on the motor installation
*(Notice* : default screws are M38mm, M3*10mm)
Air Unit Installation Method
- Pass through the top of the VTX
The 4 original screws at the bottom of the O3 Air Unit need to be removed
Recommend installing ESC in reverse horizontally 180°
Note (After the ESC is installed reversely, remember to the correct
position and direction of motors 1-4.)
It is recommended to keep the power cable of ESC to about 100mm. Please refer
to the used battery for the actual length.
- Scan the QR code to get the installation guide.
- We recommend you scan it through the SpeedyBee App for detailed instructions.
Read User Manual Online (PDF format)
Loading......