Water Sensing Cable for Insulated Pipe Installation Instructions
TOOLS REQUIRED
- TT-PTB-1000
(PN 486437-000)
| Portable Test Box, battery powered instrument designed for testing and
troubleshooting TraceTek systems.
---|---
- Digital multimeter
| Can be used as an alternative or supplement to the PTB. Meter must have 20 MΩ range.
- TT-MAPPING CAP-PC
(PN P000000872)
| Used to simulate leaks at connector points during commissioning and mapping process.
- Extra TT-MLC-PC
(PN 683262-000)
| Leader cable. Used with the ohmmeter to make easier connections to the sensing cable for resistance measurements.
- Extra TT-MET-PC
(PN 169905-000)
| End termination. Used during installation or trouble shooting to temporarily isolate a sub-section of sensing cable for resistance measurements.
DESCRIPTION
These Instructions explain the proper procedures for installing and testing nVent RAYCHEM TraceTek TT1100-OHP-THIN sensing cables. TT1100-OHP-THIN sensing cables are primarily intended for use on overhead insulated pipe to detect a water leak originating from a small pin hole or crack in the pipe. TT1100-OHP- THIN should be positioned along the bottom of the insulation, held in place with thin tape and then secured by and within the sheet metal lagging.
Important Notes
When used to monitor suspended or rack mounted pipe, TT1100-OHP-THIN sensing cables must be attached to the pipe at the lowest point where any water leak is most likely to drip from the pipe system. This will be the 6 o’clock position on horizontal piping but other mounting locations and techniques may be necessary if site conditions are unusual. In particular, special consideration should be given to pipe supports, couplings, “T’s”, valves and other fittings. It is the responsibility of the installer to position the cable such that any leak will saturate the area of insulation in contact with the sensing cable.
The sensing cable cannot stop a leak. In some installations the materials or structures beneath the pipe system may be so critical or valuable, that a drip tray system should be considered in addition to the sensing cable installation. TT1100-OHP-THIN is intended to alert the user that a pipe or system is leaking but it cannot prevent collateral damage if the leak is not contained and repaired immediately.
OPTIONAL MATERIALS
- TT-MBC-PC
(PN 847529-000)
| Branch connector used to connect and branch ‘‘T’’ lines.
---|---
- TT-MJC-xx-PC
| This jumper cable is available in various pre-cut and terminated lengths.
- TT-1100-OHP-CK-PC-M/F (PN P000001186)
| Connector kit used during field connections of TT1100-OHP-THIN bulk cable.
![Warning Icon 53](https://manuals.plus/wp-content/uploads/2023/09
/Warning-Icon-53.png) GENERAL NOTES: DO’S AND DON’TS:
DO:
- Store the cable in its original container in a clean, dry area until ready to install.
- Clean the pipe surface where the cable will be installed.
- Schedule the sensing cable installation as late as possible in the construction schedule to avoid risk of damage or contamination by other contractors or construction tasks.
- Remove cable from the pipe if any thread cutting, welding, soldering or similar pipe fitting work will be performed.
DON’T:
- Drag the cable through water, paint, solvents, oil or other contaminants.
- Install damaged or contaminated sensing cable.
- Allow the cable to become wet or contaminated after installation.
- Use the cable as a rope for lifting or securing any object.
- Allow tools or heavy objects to fall on cable.
- Exceed 3300 ft (1000 m) sensing cable circuit length
INSTALLATION
[1]
Prepare the insulated pipe where the cable will be installed.
Verify that major construction is complete:
- Verify that insulation around the pipe is completely installed and is dry.
[2]
Check each length of sensing cable before installation.
- To ensure that each length of sensing cable is intact and free of contamination, follow the Sensing Cable Test Procedure. Do not use damaged or contaminated sensing cable.
[3]
Observe proper precautions when handling sensing cables.
- Observe the do’s and don’ts under “General Notes” on page 1 of these instructions; take care to avoid damaging or contaminating sensing cable.
[4]
Connect, orient, install, and test each length of sensing cable in sequence
1. Connect a Modular End Termination (TT-MET-PC) to the first sensing-
cable length to be installed.
2. Orient sensing cable so the connector used with the end termination
will be the furthest away from connection to the TraceTek alarm module. Start
from the alarm module connection. For sensing cable on reels (lengths over 10
feet (3 m)), put the reel on an axle and pull the cable out.
3. Install sensing cable in accordance with the leak detection layout
plan.
For horizontal pipeline applications (after pipe and insulation are in place):
– Position and secure the cable along the bottom of the insulated pipe at the
6 o’clock position. If necessary, the cable can be temporarily secured
using thin tape. Tape must be removed before sheet metal lagging is installed.
Failure to remove tape can compromise system performance.
Important: It is the installer’s responsibility to position the sensing cable correctly. The cable should trace the lowest point of the pipe or fittings such that any water leaking from the pipe or fittings will saturate the area of insulation in contact with the sensing cable. Do not install the cable on the top or side surface of a pipe. Do not spiral the cable on horizontal pipe.
Exception: If the cable is used to trace vertical pipe, the cable should be spiraled around the pipe. If necessary, the cable can be temporarily secured using thin tape. Tape must be removed before sheet metal lagging is installed. Failure to remove tape can compromise system performance.
4. Install sheet metal lagging around insulated pipe and sensing cable –
Maintain the cable position near 6 o’clock position. If tape was used to
secure cable position, remove the tape before installing the sheet metal
lagging. When applying sheet metal lagging over the insulation and TT1100-OHP-
THIN sensing cable, take care to avoid any sharp metal edges coming into
contact with the sensing cable.
5. Test each length of sensing cable after installing it and before
attaching it to cable already installed. Confirm that the sensing cable is
clean and intact by following the Sensing Cable Test Procedure.
6. Connect the sensing cable to the cable string (lengths of sensing
cable connected in series) previously installed.
– Note: As an extra precaution on large installations, periodically test
the entire cable string to confirm that all installed sensing cable is still
clean and intact.
– Unplug the end termination and connect it to the next length of sensing
cable to be installed.
7. Repeat the installation sequence for each length of cable.
-
Cable connector with pins toward alarm module
-
End termination
-
Insulation
-
Pipe
-
Sensing cable
Horizontal pipe
Note: Shown without sheet metal lagging
- Insulation
- Pipe
- Sensing cable
Vertical pipe
Note: Shown without sheet metal lagging
[5]
Complete the system
1. Install other TraceTek components (such as Modular Branching Connectors, Weighted Lengths, and Modular Jumper Cables) as called for in the system layout. Complete the sensing circuit.
Note: All components of the system have male or female plastic connectors or both. The male connectors are oriented toward the instrument panel. As new sections of cable are added to the main leg or branch, each newly added section ends with a female connector. To complete the circuit the end of each branch or main leg is terminated with a male end termination.
2. Test the sensing circuit (or portions of it) to confirm that the sensing
cable is clean and intact. Follow the Sensing Cable Test Procedure.
3. Connect the sensing circuit to the TraceTek alarm module and activate the
system as soon as is practical. Use the alarm module to monitor the sensing
cable during the final stages of construction.
- Insulation
- Pipe
- TT-MLC-PC
- TTC-1, TTSIM-1, TTSIM-1A, TTSIM-2 or TTDM-128
- TT1100-OHP-THIN
- TT-MET-PC
Note: Pipe and insulation shown without sheet metal lagging
[6]
Take precautions if installation is incomplete at the end of the work day.
At the end of the work day:
- Ensure that there are no open connectors. Each sensing cable should be connected to a nVent RAYCHEM TraceTek Modular Leader Cable (TT-MLC-PC), Jumper Cable (TT-JC-PC), Modular End Termination (TT-MET-PC), and/or other sensing cables; check both ends of the cable.
- Test and record the condition of installed sensing cable following the Sensing Cable Test Procedure.
- If practical, connect the installed sensing cable to the TraceTek alarm module. Test the system and put it in operation following the alarm module installation instructions.
- Modular leader cable
- Modular end termination
At the beginning of the next work day:
- Check that the installed sensing cable is clean and intact following the Sensing Cable Test Procedure. Compare the results with those obtained at the end of the previous work day. If necessary, investigate and correct problems before proceeding.
SENSING CABLE TEST PROCEDURE
Method with nVent RAYCHEM TraceTek Portable Text Box (PTB)
-
Ensure the end termination is connected to the sensing cable. If checking several lengths of sensing cable in series (a cable string), ensure they are all connected.
-
Connect the PTB to the sensing cable(s) (using its adapter as needed) as illustrated.
-
Verify that the sensing cable is intact; follow the operating instructions printed inside the lid of the PTB itself. If a cable or connection is broken, the PTB illuminates its LED indicating “cable break,” and displays a “1” in the leftmost position of its LCD display. If the cable string is intact, the PTB measures the system length.
– If the cable string is not intact, apply this test procedure to segments of the system to identify the open connection or damaged modular length. -
Check the condition of the sensing cable(s), again following the PTB operating instructions. If the sensing cables are clean and free of contamination, the current measured should be below 10 µA. If the reading exceeds 10 µA, use the PTB to locate the liquid or contamination and take appropriate corrective action.
-
Testing a cable string
-
End termination
-
PTB
-
Testing an individual length of cable
-
End termination
Method with Ohmmeter
-
Ensure the end termination is connected to the sensing cable. If checking several lengths of sensing cable in series (a cable string), ensure they are all connected.
-
Connect a Modular Leader Cable (TT-MLC-PC) to the sensing cable.
-
Verify that the sensing cable is intact:
– Loop 1: Measure the resistance between the yellow and black wires of the leader cable as illustrated.
– Loop 2: Measure the resistance between the red and green wires of the leader cable.
The resistance should equal a multiple of the length of sensing cable:
i.e. 3.9 times the length in feet of sensing cable or 12.8 times the length in meters of sensing cable.
Example: 3.9 x 50 ft of cable = 195 Ω
12.8 x 15 m of cable = 192 Ω
In addition, the resistance of the two loops should be within 5 percent of each other.
If the cable string is not intact, apply this test procedure to segments of the system to identify the open connection or damaged modular length.
Check the condition of the sensing cable. Measure the resistance between the black and green wires of the leader cable.
– If the reading is below 20 megohms, apply this test procedure to segments of the system to identify the modular sensing cable length(s) affected, locate the liquid or contamination, and take appropriate corrective action. -
Testing a cable string
-
End termination
-
TT-MLC-PC
-
Ohm meter
-
Testing an individual length of cable
-
End termination
-
To green
-
To red
-
To black
-
To yellow
COMPLETE SYSTEM CONNECTIONS AND LAYOUT
A. TT1100-OHP-THIN is available in a variety of pre-cut and terminated
lengths. Each cable has a female plastic connector on one end and a male
plastic connector on the opposite end. Cable sections plug together like
extension cords.
B. (Optional) A branch connector (TT-MBC-PC) is used to connect and branch “T”
lines. The branch connector has one male connector and two female connectors.
For mapping purposes, the cable connected to the center leg of the branch
connector will be counted first, then the distance measurements will continue
from the second female connector and continue along the rest of the system. A
dead band of 15 ft (5 m) is inserted at the beginning and end of each branch
to avoid any location ambiguity.
C. (Optional) It is permissible to have TT-MBCs installed on branches as
needed to fully trace a pipe system.
D. Install an end termination (TT-MET-PC) at the end of the main line and each
branch line. (Note: A good check on the system design and bill of materials is
that the total number of end terminations installed in the system should equal
the number of branch connectors plus one)
E. (Optional) Install jumper cables (TT-MJC-xxx-PC) as needed to connect
sensing cable sections that are located in separate areas. Jumper cable is
available in various pre-cut and terminated lengths and is also available in
bulk form for long distance runs between the sensing cable and the
instrumentation point.
F. Install a leader cable (TT-MLC-PC) between the sensing cable and the
monitoring instrument. The factory standard length of leader cable is 12 ft (4
m). It has a female plastic connector on one end and four tinned leads on the
opposite end for connection at the instrument’s sensing cable terminal block.
In some installations the distance between the instrument and the start of the
sensing cable run will be much greater than 12 feet. In those cases a simple
solution is to purchase a jumper cable of sufficient length, then cut off and
discard the male connector and any extra cable. Bulk jumper cable and
connector kits are also available for lengths that exceed the longest
available precut jumper cable.
G. Neatly coil and secure any excess sensing cable, jumper cable, branch
connectors, etc.
Note:
- Drawing not to scale.
-
TraceTek alarm module (several models available; TTDM-128 alarm and locating module is shown)
-
Modular leader cable
(TT-MLC-PC) -
Modular jumper cable
(TT-MJC-xxx-PC) -
Modular branching connector
(TT-MBC-PC) -
Modular jumper cable
(TT-MJC-xxx-PC) -
Modular end termination
(TT-MET-PC) -
TT1100-OHP-THIN
water sensing cable -
Pipe
-
Insulation
-
Sheet metal lagging
INITIAL POWER-UP AND TEST
Connect the cable to the selected instrument and test the system.
-
Apply power to the TraceTek instrument and look for a “Normal” indication.
– On nVent RAYCHEM TraceTek TTC-1, TTSIM-1A or TTSIM-2 family, there will be a green LED and no other red or yellow LEDs.
(On TTSIM-1A and TTSIM-2 the green LED will flicker off every 10 seconds.)
– On TTSIM-1, Normal Condition is indicated by a steady green LED and a momentary flash of the RED LED every 10 seconds.
– On TTDM-128 the alpha-numeric display will indicate a channel number and display the words SYSTEM NORMAL. -
If the Yellow LED is on in any of these instruments or the words “Cable Break” or “Loop Break” is displayed, then the cable system must be inspected for loose connections, missing end terminations until the cable continuity is established and the “Normal” condition is achieved.
-
LEAK testing can be done with a mapping cap (TT-MAPPING CAP-PC). The MAPPING CAP simulates a leak at the location where it is inserted into the system.
– For TTC-1, TTSIM-1 and TTSIM-2 a red LED will indicate that the simulated LEAK has been detected.
– For TTSIM-2 and TTDM-128 a leak location will be displayed in feet or meters (as selected) in addition to the red LED indication -
For larger piping systems with TTDM-128 or TTSIM-2, the MAPPING CAP should be moved sequentially to each accessible connector. Note the distance displayed on the as-built drawings. This will become the basis for the System Map.
-
Create a System Map showing where sensing cables and alarm modules have been installed. The System Map will include the beginning and end of sensing cables, and location of any connections. If using locating alarm modules, the System Map should include distance readings at significant landmarks (beginning and end of system, changes of direction, branches, valves, low points, etc.).
**TTDM-128
**
TTDM-128 Indications:
LEAK Red
CABLE BREAK Yellow
POWER LED Green
Text message in 4×20 display
**TTC-1
**
TTC-1 Indications:
LEAK LED Red
CABLE BREAK LED Yellow
Reset Button Red
POWER LED Green
**TTSIM-1A
**
TTSIM-1A Indications:
LEAK Red
CABLE BREAK Yellow
SERVICE Yellow
POWER LED Green
**TTSIM-2
**
TTSIM-2 Indications:
LEAK Red
CABLE BREAK Yellow
SERVICE Yellow
POWER LED Green
**TTSIM-1
**
TTSIM-1 Indications:
LEAK Red
CABLE BREAK Flashing yellow
SERVICE Flashing yellow
POWER LED Green
TROUBLESHOOTING
Symptom | Possible Cause and Correction |
---|---|
Green LED not visible on TraceTek instrument | System is not powered. Check |
power wiring. Check circuit breakers that may have been tripped. On TTDM-128
check fuse and replace if necessary.
Leak alarm
(TTDM-128 message and red LED) (SIM Red LED ON)| This is an indication of a
LEAK event.
For leak locating modules (TTDM-128 and TTSIM-2): Using leak distance indication and System Map as a guide, investigate system condition, work to locate and repair leak.
For non-locating modules: Work to locate and repair the leak. (If your system is constructed with multiple sensing cable segments, using an end termination (TT-MET-PC) to break the system into sections can help in locating the leak. Work outward from the alarm module using the end termination to establish a temporary end of the circuit, then sequentially move outward adding one cable segment at a time).
Remove any wet insulation.
Once the leak is repaired, dry the sensing cable and install over dry insulation. Typically this will clear the Leak Alarm or LEAK condition (Red LED on SIM).
In order to clear the Service Req’d (or Service condition), moisture levels on sensing cable and insulation need to be reduced by removing the lagging to allow drying.
Note: When the Service Req’d or SERVICE condition exists (Yellow LED), leak location accuracy is reduced for a new leak.
Yellow LED visible on TTC-1, TTSIM-1A, TTSIM-2 or flashing yellow LED on TTSIM-1| Could be cable break or service indication. Refer to alarm module instructions for more information.
For Cable break indication:
Check for loose connectors, missing end terminations, broken jumper wires or physical damage to the cable. Repair or replace cable if necessary. The TT- MET-PC end termination can be used to isolate a damaged section by working outward from the instrument using the end termination to establish a temporary end of the circuit then sequentially moving outward adding one cable segment at a time.
“SERVICE Req’d” message
(TTDM-128 Only)| This is an early warning message from the TTDM-128 panel
indicating that the cable is becoming damp, but not yet to the level that
constitutes a leak. The TTDM-128 panel may display a location in square
brackets. If a location is displayed, that location should be investigated for
possible sources of condensation/drips. The square brackets indicated that the
leak signal is not strong enough for an accurate location calculation, so the
indicated locations may include some error.
Red LED fails to turn off after leak is repaired, and leak alarm reset
attempted| Cable and insulation are still damp. Allow more time for cable to
dry or investigate leak site to make sure that insulation is dry.
Leak location seems inaccurate in actual leak situation| More that one leak
may be present or the cable may be damp in several locations. If the system is
monitored by a TTDM-128, check the event history to see if there is an earlier
indication of a nearby leak or a SERVICE NEEDED message. If necessary use the
end termination to break the system into smaller segments and work outward to
isolate each leak location in multiple leak scenarios.
Leak locations seem inaccurate or unstable during mapping tests| Make sure
that the simulated leak (MAPPING CAP) is kept in place for at least 30
seconds. The location circuitry in the instruments require a steady leak
location in order to compute an accurate distance. Removing the simulated leak
too quickly induces a random error.
North America
Tel +1.800.545.6258
Fax +1.800.527.5703
thermal.info@nVent.com
Europe, Middle East, Africa
Tel +32.16.213.511
Fax +32.16.213.604
thermal.info@nVent.com
Asia Pacific
Tel +86.21.2412.1688
Fax +86.21.5426.3167
cn.thermal.info@nVent.com
Latin America
Tel +1.713.868.4800
Fax +1.713.868.2333
thermal.info@nVent.com
©2023 nVent. All nVent marks and logos are owned or licensed by nVent Services
GmbH or its affiliates. All other trademarks are the property of their
respective owners.
nVent reserves the right to change specifications without notice.
RAYCHEMTraceTek-IM-H58676-TT1100OHPTHIN-EN-2304
PN P000001280
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>