Energizer STUD WALLS Wall Bracket Mounting Instructions
- June 12, 2024
- Energizer
Table of Contents
Energizer STUD WALLS Wall Bracket
Main Unit only
When installing a Main Unit, it is recommended to fix the supplied wall mounting bracket to the centre of a single stud. Use all 5 fixings with heavy duty timber screws to support the weight, then use a minimum of 3 fixings on each side with either drywall anchors or toggle bolts
Main + Sub Units
Affix a timber backboard spanning 2 studs using 12G x 75mm screws.
Suggested materials:
Melamine board
Pre-laminated MDF
Flooring Boards
Plywood
Suggested thickness:
15-25mm
Suggested size:
565mm W x 673mmm H
Install the wall bracket for the Main Unit using the 4 corners plus 2-4 more
fixings to secure the bracket firmly in place.
Slide the “Spacer Mate” into position making sure there is no play between the bracket and the “Spacer Mate”.
Position the Sub Unit wall bracket once again, making sure there is no play between the brackets and the “Spacer Mate”. Affix the Sub Unit wall bracket placing a screw in each corner plus 2-4 more fixings to secure the bracket firmly in place.
© 2021 Energizer. Energizer and certain graphic designs are trademarks of
Energizer Brands, LLC and related subsidiaries and are used under license by 8
Star Energy Pty Ltd.
All other brand names are trademarks of their respective owners. Neither 8
Star Energy Pty Ltd nor Energizer Brands, LLC is affiliated with the
respective owners of their trademarks.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>