Kon-Tec KT-LFPES512100 Multi Lithium Iron Phosphate Lifepo4 Battery Pack Instruction Manual
- June 12, 2024
- Kon-TEC
Table of Contents
Kon-Tec KT-LFPES512100 Multi Lithium Iron Phosphate Lifepo4 Battery Pack
Instruction Manual
PRECONDITIONS
Before connecting the battery with inverter.make sure the following rules are complied.
- The battery system discharge power/current is proper with the inverter power. It is recommended to configure the inverter capacity with battery in 1: 2 proportion, for example. If you have a 5 kW rated inverter, connect at least 2 batteries (10kWh),
- If the system is an off-grid system, make sure that configuration can manage to avoid overdischarging the battery. It is strongly recommended to install a smart generator and MPPT modules (brands like Victron that support DC coupled application).
- Make sure that the installation environment, setting and sequence is following the User Manual.
COMMISSIONING WITH INVERTER
VICTRON
Victron devices and Kon-TEC KT-LFPES512100 battery can be used for the following system types:
-
Energy Storage Systems (ESS) – Self Consumption
Grid Backup (DVCC or ESS) -
Off-grid (DVCC)
A GX device is required to establish communication. It is essential to use the CAN-bus connection of the GX device (e.g. Cerbo GX) – communicates the keep- alive signal, charge and discharge limits, error codes and state of charge (SOC %) between the batteries and the system.
The minimum required firmware version for the GX Device is v2.40. It is highly
recommended to use the latest firmware version on all connected devices,
including the GX device lnverter/Charger and MPPTs.
Both 250Kbps and 500Kbps are supported. If you use a new VE.Can MPPT, it must
also be with a GX device that has more than one CANbus interface, e.g. the
Cerbo GX.
Compatible device:
Multi, MultiPlus, MultiGrid, EasySolar-II, Inverter RS & Multi RS and Quattro.
VE.Direct BlueSolar and SmartSolar MPPT Chargers.
CABLE CONNECTION
- Both inverter and battery completely off.
- Connect the communication cable to the system according to the following schematic
Kon-TEC Battery BMS CAN port| Victron GX device (VE. CAN Port/ BMS CAN
Port)
---|---
Pin 6| GND| Pin 3| GND
Pin 4| H| Pin 7| H
Pin 5| L| Pin 8| L
START SYSTEM
- Set the Master battery (ONLY!!!) DIP address according to the User Manual (Picture above).
- Press the Master battery reset button to switch on all the batteries and then close the battery breaker
- Close inverter switch, then turn on DC breaker to start MPPT.
- Switch on AC input and output breaker
INVERTER SETUP
Confirm the firmware version
Choose the baud rate, setting-services, ve.can port, select the 250/500 accoring to battery User Manual
Set DVCC as below
Configure MPPT via Victron connect.
MPPT Parameter | Setting |
---|---|
Battery voltage | 48V |
Absorption voltage | 56.0V |
VE CONFIGURE SETTINGS
General tab
- Check the „Enable battery monitor” function
- Set the battery capacity to the total capacity of the battery, each model is 100Ah
- The other parameters („State of charge when bulk finished”and “Charge efficiency”) can be left to their default setting.
Charge tab
VE Configure Charge Parameter | Setting |
---|---|
Battery type | 48V |
Charge curve | Fixed |
Absorption voltage | 56.0 V |
Float·voltage | 54.6 V |
Absorption time | 1 hr |
Inverter tab
VE Configure InverterParameter | Setting |
---|---|
DC input low shut-down | 46V |
DC input ow restart | 51.2V |
DC input low pre-alarm | 51.2V |
ESS assistant setting (if you are using your battery in a grid connected system)
ESS Parameter | Setting |
---|---|
Dynamic cut-off | 47V |
Sustain voltage | 50.5V |
Restart offset: | 1.2V (Default) |
Send all the setting to the inverter/charger. Then restart the system.
Kon-TEC sp. z o.o.
Boya-Żeleńskiego 12, 35-105 Rzeszów
T: +48 572 001 151
E: info@kon-tec.eu
W: www.kon-tec.eu
References
- tec.eu
- Akumulatory producent - magazyny energii | Kon-Tec
- Akumulatory producent - magazyny energii | Kon-Tec
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>