D-Link DSS-200G-10MPP PoE Switch Installation Guide
- June 12, 2024
- D-Link
Table of Contents
D-Link DSS-200G-10MPP PoE Switch
Product Information
The D-Link DSS-200G-10MPP is a PoE (Power over Ethernet) switch that features
8 10/100/1000Base-T ports and 2 1000Base-X SFP ports.
It supports L2 networking and provides PoE capabilities with support for
802.3af/at/bt standards. The switch comes with a Quick
Installation Guide and the package contents include the DSS-200G-10MPP switch,
an AC power cord, and the Quick Installation Guide.
Device Interfaces
- 8 10/100/1000Base-T PoE ports (10/100/1000 Mbps connection speed)
- 2 1000Base-X SFP ports (100/1000 Mbps connection speed)
- RJ-45 Alarm port for connecting external alarm devices
LEDs
LED | Status | Description |
---|---|---|
Power | Solid green | The switch is powered on. |
Light off | The switch is powered off. | |
Alert | Solid red | The alarm is triggered. Switch will send out traps and logs |
when error event.
PoE Mode/Link Mode| Solid amber| LEDs for ports 1-8 are in PoE Mode (PoE
OK/PoE Fail).
Solid green| LEDs for ports 1-8 are in Link Mode (Link/Activity/Speed).
Link/Activity/Speed (per port 1-8)| Solid green| There is a secure 1000 Mbps
connection at the port.
Blinking green| There is reception or transmission occuring at the port.
Solid amber| There is a secure 10/100 Mbps connection at the port.
Blinking amber| There is reception or transmission occuring at the port.
Light off| No link.
Link/Activity/Speed (per port 9-10)| Solid green| There is a secure 1000 Mbps
connection at the port.
Blinking green| There is reception or transmission occuring at the port.
Solid amber| There is a secure 100 Mbps connection at the port.
Blinking amber| There is reception or transmission occuring at the port.
Light off| No link.
PoE OK/PoE Fail (per PoE port)| Solid green| PD device insert and power
feeding.
Solid amber| PD device insert but failure occurs.
Light off| No PD device insert.
PoE Power Budget| 100% LED: Solid red| PoE power has reached 100%.
---|---|---
75% LED: Solid amber| PoE power ≤ 75%.
50% LED: Solid green| PoE power ≤ 50%.
25% LED: Solid green| PoE power ≤ 25%.
Product Usage Instructions
Installation Guidelines
Follow these guidelines to properly and safely install the DSS-200G-10MPP switch:
- Visually inspect the power cord to ensure it is securely connected to the AC power connector.
- Ensure there is proper heat dissipation and adequate ventilation around the switch.
- Avoid placing heavy objects on the switch.
Desktop or Shelf Installation
When installing the switch on a desktop or shelf:
- Attach the rubber feet to the bottom corners of the device’s base for stability.
- Allow sufficient ventilation space between the device and surrounding objects.
Rack Installation
The switch can be mounted in a standard 19-inch rack. Follow these steps:
- The switch can be mounted in an EIA standard size 19-inch rack, which can be placed in a wiring closet with other equipment.
- To install, attach the mounting brackets to the switch’s side panels (one on each side) and secure them with the screws.Then, use the screws provided with the equipment rack to mount the switch in the rack.
Installing Transceivers into the Transceiver Ports
The DSS-200G-10MPP switch has ports for connecting SFP transceivers. Follow these steps to install the transceivers:
Grounding the Switch
This section describes how to connect the switch to the ground. You must
complete this procedure before powering on the switch.
Required tools and equipment:
- Ground screws: One M4 x 6 mm (metric) pan-head screw.
- Grounding cable (not included in the accessory kit): The grounding cable should be sized according to local and national installation requirements. Depending on the power supply and system, a 12 to 6 AWG copper conductor is required for installation. Commercially available 6 AWG wire is recommended. The length of the cable depends on the proximity of the Switch to proper grounding facilities.
- A screwdriver (not included in the accessory kit).
You can connect the switch to a protective ground by following the steps below:
- Verify if the switch power is off.
- Attach the terminal lug ring of the grounding cable to the ground screw opening of the switch with the grounding screw.
- Attach the terminal lug ring at the other end of the grounding cable to an appropriate grounding stud or bolt on the rack where the switch is installed.
- Verify if the connections at the ground connector on the switch and the rack are securely attached.
Package Contents
Open the shipping carton of the switch and carefully unpack its contents. Please consult the packing list to make sure all items are present and undamaged. If any item is missing or damaged, please contact your local reseller for replacement.
- One DSS-200G-10MPP switch
- One AC power cord
- One Quick Installation Guide
Note: the model you have purchased may appear slightly different from those shown in the illustrations.
Plugging in the AC Power Cord
Plug one end of the AC power cord into the power socket of the switch and the
other end into the electrical outlet (preferably one that is grounded and
surge protected).
Power Failure
In the event of a power failure, just as a precaution, unplug the power cord
from the switch. After the power returns, plug the power cord back into the
power socket of the switch.