FOX 10-203-00078-04 All In One Single Phase Energy Station Installation Guide

June 12, 2024
FOX

FOX 10-203-00078-04 All In One Single Phase Energy Station

Product Information

Object Quantity Description
A 1 Energy station
B 2 Brackets
C 4 PV connectors (Only for Hybrid) (2 positive, 2 negative)
D 4 PV pin contacts (Only for Hybrid) (2 positive, 2 negative)
E 2 AC connectors
F 3 Expansion tubes & Expansion screws
G 1 Earth terminal
H 1 Communication connector
I 1 Quick installation guide
J 1 CT (with 10m cable)
K 1 CT extension connector
L 1 LAN/WiFi/4G (Optional)
M 1 Meter (Optional)
N 2 Hexagonal screws
O 4 (For ground installation) Battery Power cables
P 3 (1320mm, 1620mm, 1*900mm)
Q 1 Communication cable
R 1 Offset ring spanner
S 1 Binding band

Product Usage Instructions

Installation Steps
Please make sure the energy station will be installed with a proper distance as shown below:

  • Position: Left
  • Top Min Distance: 400mm
  • Middle Min Distance: 600mm
  • Right Min Distance: 300mm

A. Energy Station Installation

  1. Wall Mounting:
    • Choose a clean and stable wall surface for installation.
    • Use hexagonal screws to fix the brackets on the back of the All-In-One.
    • Aim the All-In-One towards the wall and mark the position of two holes from brackets.
    • Drill holes on the marks with a diameter of 6mm drill.
    • Insert the expansion screws into the hole.
    • Align the All-In-One with expansion screws and tighten the screws firmly.
  2. Ground Installation:
    • Choose a flat and stable ground for installation and place the All-In-One on that ground.
    • Mark the position of the four corners on the boom of the All-In-One then remove the All-In-One.
    • Drill holes on the marks, make sure the depth is at least 60mm, and the diameter of the holes is about 13-14 mm.
    • The hole which is closest to the wall should keep a minimum distance of 170mm from the wall.
    • Insert the expansion screw into the ground.
    • Place the All-In-One back to the ground, align the All-In-One with four expansion screws and tighten the screws firmly.
    • Note: For easy installation, instead of using the All-In-One for hole remarks, you can remark the hole with the installation guide (Size is same as Quick installation guide).

B. Battery Installation

  1. Remove the brackets on both sides of the battery. There are eight screws on the left and right sides (4 left, 4 right).
  2. Push the battery into the All-In-One as shown in the figure.

Wiring Steps

  1. Connect the plug of the pin contact cable to the corresponding port in the All-In-One (D- and D+).
  2. Connect the AC wiring cable dimensions to the All-In-One.
  3. Note: No.1 is reserved line. No.2 & No.3 please find it in the battery pack.

Battery Ground Cable Connection

Note: Four ground cables please find it in the battery pack.

Packing List

FOX-10-203-00078-04-All-In-One-Single-Phase-Energy-Station-
FIG-1FOX-10-203-00078-04-All-
In-One-Single-Phase-Energy-Station-FIG-2

Installation Steps

Please make sure the energy station will be installed with a proper distance as shown belowFOX-10-203-00078-04-All-In-One-Single-Phase-Energy-Station-
FIG-3

A. Energy station installation

  1. Wall mounting
    Choose a clean and stable wall surface for installation.
    Use hexagonal screws to fix the brackets on the back of the All-In-One.
    Aim the All-In-One towards the wall and mark position of two holes from brackets. Drill holes on the marks with a diameter of 6mm drill. Insert the expansion screws into the hole. Align the All-In-One with expansion screws and tighten the screws firmly

  2. Ground installation
    Choose a flat and stable ground for installation and place the All-In-One on that ground.
    Mark the position of the four corners on the boom of the All-In-One then remove the All-In-One.
    Drill holes on the marks, make sure the depth is at least 60mm, and the diameter of the holes is about 13-14 mm. The hole closest to the wall should keep a minimum distance of 170mm from the wall. Insert the expansion screw into the ground.
    Place the All-In-One back to the ground, align the All-In-One with four expansion screws and tighten the screws firmly.
    Note: For easy installation, instead of using the All-In-One for hole remarks, you can remark the hole with the installation guide Size is same as

B. Battery installation
Remove the brackets on both sides of the battery. There are eight screws on the left and right sides (4left, 4right).FOX-10-203-00078-04-All-In-One-
Single-Phase-Energy-Station-FIG-10Push the battery into the All-In-One as shown in the figure below.

Serial Port Connecttions

Communication interface between the inverter and Meter/Battery/DRM/485 are as follows with Rj45 connectors which should be inserted corresponding port in the inverter.

Note:
CT1: For All-In-One, CT2: Grid-tied inverter (if have).
Compatible Meter type: DDSU666 (CHINT), SDM230 (EASTRON).

Wiring Steps

PV Wiring (For Hybrid version Only)

  • Choose 12 AWG wires to connect the PV module.
  • Trim 6mm of insulation from the wire end.
  • Separate the DC connector (PV) as below.
  • Insert striped cable into pin contact and ensure all conductor strands are captured in the pin contact.
  • Crimp pin contact by using a crimping plier. Put the pin contact with striped cable into the corresponding crimping pliers and crimp the contact.
  • Insert pin contact through the cable nut to assemble into back of the male or female plug. When you feel or hear a “click” the pin contact assembly is seated correctly.
  • Unlock the DC connector:
    • Use the specified wrench tool.
    • When separating the DC+ connector, push the tool down from the top.
    • When separating the DC- connector, push the tool down from the bottom.
    • Separate the connectors by hand.

Battery Wring

A. Connection of battery power line and communication line

  • For two batteries Note:
    No.1 is a reserved line.
    No.2 & No.3 please find it in the battery pack.

  • For three batteries
    Note:
    No.1 is a reserved line.
    No.2 & No.3 please find it in the battery pack

  • For four batteries
    Note:
    No.1 is a reserved line.
    No.2 & No.3 & No.4 & No.5 please find it in the battery pack.

B. Connection of battery ground cable

Note:
Four ground cables please find it in the battery pack.

AC Wiring
Cable dimensions

  • Trim all the wires to 52.5mm and the PE wire to 55mm.
  • Use the crimping pliers to trim 12mm of insulation from all wire ends as shown in the picture.

FOX-10-203-00078-04-All-In-One-Single-Phase-Energy-Station-
FIG-22 Note: Please refer to local cable type and color for actual installation.

A. EPS Wiring

  • Run the cable into the sleeve assembly.
  • Install the cable into the plug terminal and lock the screw, torque is (0.8 + / – 0.1 N·m).FOX-10-203-00078-04-All-In-One-Single-Phase-Energy-Station-FIG-24
  • Insert the plastic core into the main body
  • Put the sealing body and yarn trapper into the main body, screw ock nut into the main body, and the torque is (2.5 + / – 0.5N·m)
  • Insert the male end into the female end. For the rotation direction of the lock, please refer to the LOCK mark on the assembly.

B. ON-GRID Wiring

  • Separate the ON-GRID plug into three parts as below.
    1. Hold the middle part of the female insert, rotate the back shell to loosen it, and detach it from female inset.
    2. Remove the cable nut (with rubber insert) from the back shell.
  • Slide the cable nut and then the back shell onto the cable.

Energy Station Start-Up

Please refer to the following steps to start up the energy station.

  1. Ensure the energy station fixed well.
  2. Make sure all wirings are completed.
  3. Make sure the meter is connected well.
  4. Make sure the battery is connected well.
  5. Make sure the external EPS contactor is connected well (if needed).
  6. Turn on the PV/DC switch (for Hybrid version only), AC breaker, EPS breaker and battery breaker.
  7. Enter the settngs page, select START / STOP and set it to start.

Note:

  • When starting energy station for the first time, the country code will be set by default to the local settngs. Check if the country code is correct.
  • Set the time on the inverter using the button or by using the APP.

Energy Station Switch Off

Please refer to the following steps to switch off the energy station.

  1. Enter the settings page, select START / STOP and set it to stop.
  2. Turn off the PV/DC switch (for Hybrid version only), AC breaker, EPS breaker and battery breaker
  3. Wait 5 min before you open the upper lid (if in need of repair)

Note:
The ethernet port under inverter is only for local monitoring use (Via register),
LAN connection need to purchase an separate product Smart LAN.

Please scan the QR Code and follow the steps below to download our latest mul- language User Manual/Quick Installation Guide: Scan the QR Code → Select your Language → Choose to download User Manual or Quick Installation Guide → Download

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals