sublime220 Panel And Rack with LED Instructions
- October 30, 2023
- SUBLIME
Table of Contents
180/220
Panel And Rack with LED
Instructions
Assembly instructions
N°| Cod. 180| Cad. 220| Parts| Medida / Size + 180|
Medida / Size – 220| Qtd.| Vol.
---|---|---|---|---|---|---|---
1| 7407| 7344| Upper painel| 1800x600x15| 2195x670x15| 1| 1
2| 7408| 7345| Lower panel| 1800x600x15| 2195x670x15| 1| 1
3| 7346| 7346| Larger rear bar| 1350x60x20| 1350x60x20| 2| 1
4| 7347| 7347| Smaller rear bar| 422x60x20| 422x60x20| 4| 1
5| 7409| 7348| Side rear bar| 1336x60x20| 1196x60x20| 2| 1
6| 7410| 7349| Vertical front rail| 862x28x20| 734x28x20| 2| 1
7| 7411| 7350| Horizontal front bar| 1560x28x20| 1220x28x20| 2| 1
8| 7412| 7351| Front panel| 1910x610x15| 1495x540x15| 2| 1
www.gelius.com.bf
Recommendations
Attention: This product must be assembled by a professiohal.
Prepare the room before starting the assembly, leaving it completely clean and
the area in good condition to start the work. Use the cardboard of the
packaging to separate and support the ports removed from the boxes.
Now to
use the Minifix Set (when used in the product).
Apply glues to the wooden dowels (when used in the product).
Recommended tools
Hardwares
Attention: if the LED KIT* is purchased, it must be installed in this
assembly step.
Remove
the protective film from the double-sided tape and start gluing the LED tape
on the side of part n° 06 in the position indicated by the arrow. Go pasting
the tape by pieces n° 06, n° 07, n° 06 and finish gluing at the end of piece
n° 07.
Attention: when ossembling the 180 pone!, V necessary, cut the led strip
onfr in the indicated locotion. ATTENTION! Before starting the installation, check all
the conditions of the wall, notably regarding resistance and weight support
and the existence and position of hydraulic, gas and eletrical lines, avoiding
damage to these structures when running holes. Gelius Moveis not responsible
for problems caused by inexperience, inadequancy or failure to follow due
recommendations in the assembly and installation of their products by third
parties.
Define the location and height at which the panel is to be installed and mark
the position of the fixing holes on the wall.
ATTENTION! When marking the position of the holes in the wall, make sure
that the panel will be leveled.
With drilling machine and drill (not supplied with the product), make the
holes in the wall.
16/03/2022