DEMA 681AG-4 Blend Center Installation Guide

June 4, 2024
DEMA

DEMA 681AG-4 Blend Center logo

DEMA 681AG-4 Blend Center

PARTS CHECKLIST

  • Blend Center Assembly
  • 4-¼ x8 Long Vinyl tubing and foot valve assembly.
  • Ceramic Weight
  • Screw/Anchor Kit Set.
  • Metering Tip Kit.
  • 4-3/8 ID x 8  Long Vinyl tubing and Foot Valve
  • 9/16 ID x 20 Long Vinyl Outlet Tubing.
  • Label Card

INSTALLATION

This product is designed only to be used as described in this instruction sheet. Adhere to all warnings and cautions identified.

WARNING
Installations must conform to all local and national plumbing codes and use approved backflow prevention and pressure relief devices where required. ALWAYS DISCONNECT DISPENSER FROM WATER SOURCE WHEN DISPENSER IS NOT IN USE. Always read SDS for all chemicals used and follow personal protective guidelines.

Note
Pressure indicating tee is to be installed with existing faucets according to local plumbing codes in the state of Wisconsin and any other state that requires the use of a pressure indicating tee.

Mounting and water supply:

Remove Blend Center lid and hold unit in position to locate the mounting screw positions. Install the mounting screws; leaving approximately 1/8″ extension between the wall and screw head. Mount the Blend Center by inserting the screw heads through the key hole slots in the base and tighten the screws (See Figure 1). The water inlet is equipped with a female garden hose fitting (with strainer washer) for attaching a water supply hose. The fitting may be removed to permit direct connection to a 3/8″ NPT pipe. The unit is designed so water can be supplied to either side by interchanging the pipe plug and the female hose fitting. Note: Apply pipe dope, hand tighten, and then turn 12 times with a wrench. DO NOT OVER TIGHTEN.

Pressure Indicating Tee Installation:

Screw female quick disconnect to faucet and attach pressure indicating tee to female quick disconnect. Attach female end of reinforced hose to male threads of tee, then attach the male end to the female garden hose fitting at the water inlet of the Blend Center (See Figure 3). Water supply should not exceed 125 psi and water temperature must not exceed 160°F.

Chemical supply

Place the chemical containers in a convenient location not more than 6 feet below the blend center greater lifts will reduce injection capacities. Insert the vinyl supply tubing with the foot valve ends into the chemical containers. Cut the vinyl tubes to any convenient length that will allow them to extend from the bottom of the chemical container to the proportioned inlet barbs. Gummed labels are provided for product labeling.

Outlet

Cut the 9/16″ I.D. outlet tubing to the desired lengths and attach them to the proportioned outlets. Longer lengths may be used up to 10 feet. The 7″ long tubing must be left on the 1 GPM proportioned to insure priming.

Chemical injection adjustment

WARNING
USE CARE WHEN HANDLING HAZARDOUS CHEMICALS. Chemical feed rates are controlled by metering tips screwed into the proportioner barbs. Select a tip for each barb using Table 1 or 2 as a guide.

DEMA 681AG-4 BLEND CENTER INSTALLATION INSTRUCTIONS

OPERATION

The Blend Center is now ready for use. Depressing a push button opens the valve, allowing water to flow through the chemical proportioner that mixes chemical at the desired rate. The buttons are spring loaded to prevent accidental overflow if unattended, but may be converted to locking buttons by cutting off the tab at the notch. (See Figure 2) Pushing the button and tubing it 1/4 turn clockwise at the end of its travel allows the valve to lock on. This makes it unnecessary for the attendant to hold the button in while filling large containers. Turning the button in a counter clockwise direction will release it, allowing the valve to shut off.

SERVICING

CAUTION
TURN OFF WATER SUPPLY BEFORE SERVICING.

Proportioner fails to draw chemical

  1. Pinch outlet tube to create back pressure which will cause unit to prime. The foot valve will keep the inlet tube primed.
  2. Insufficient water supply pressure. 20 PSI is the minimum allowable.

Proportioner stops drawing chemical

  1. Inspect foot valve for dried chemical or dirt.

  2. Soak in hot water to clean.

  3. Proportioner metering tip clogged with dried chemical.

  4. Remove tip and try injecting hot water to clear interior passages.
    C. Proportioner continues to draw chemical after water valve closes.

  5. Chemical supply is higher than bottom of discharge tube creating a natural siphon.

  6. Lower the chemical supply or hang up outlet tubing after use.

ValvXe malfunction
Check that the button moves freely up & down and that a click can be heard when the button is pushed and released, indicating that the magnet is activating the plunger properly. Remove cover. To inspect internal parts, unscrew magnet housing and carefully pull off the enclosing tube so as not to drop the plunger, kick-off spring, and spacer. Check for dirt of damage impending plunger and kick-off spring movement. Inspect the diaphragm, making sure the two small pin holes bleed holes in the diaphragm convolution are clear to allow the valve to close.

CAUTION
When servicing unit, be sure that replacement parts have been installed according to drawing.


Metering Tip Color

| Injection Rates For Viscosities Shown
---|---
1 cps| 75 cps| 200 cps
Oz/Gal| Ratio| Oz/Gal| Ratio| Oz/Gal| Ratio
Tan| 1.25| 102-1| 0.90| 142-1| 0.60| 213-1
Orange| 1.70| 75-1| 1.20| 107-1| 0.80| 160-1
Turquoise| 2.15| 60-1| 1.55| 83-1| 1.10| 116-1
Pink| 3.00| 43-1| 2.00| 64-1| 1.50| 85-1
Light Blue*| 3.90| 33-1| 2.75| 47-1| 1.80| 71-1
Brown| 4.55| 28-1| 3.00| 43-1| 2.00| 64-1
Red| 5.80| 22-1| 3.60| 36-1| 2.30| 56-1
White| 7.00| 18-1| 4.45| 29-1| 2.70| 47-1
Green| 7.90| 16-1| 5.00| 26-1| 3.00| 43-1
Blue| 9.80| 13-1| 5.75| 22-1| 3.30| 39-1
Yellow| 14.80| 9-1| 7.35| 17-1| 3.55| 36-1
Black| 20.15| 6-1| 8.50| 15-1| 3.70| 35-1
Purple| 27.80| 5-1| 9.80| 13-1| 3.80| 34-1
Gray| 31.60| 4-1| 10.50| 12-1| 3.90| 33-1
No Tip| 35.70| 3.6-1| 11.80| 11-1| 4.50| 28-1

Metering tip color was formerly clear. Note: All induction rates are base on a water pressure of 40 psi.

TABLE 2 164 AG GPM FLOW RATE PROPORTIONER 3/8 BARB AND TUBING


Metering Tip Color

| Injection Rates For Viscosities Shown
---|---
1 cps| 75 cps| 200 cps
Oz/Gal| Ratio| Oz/Gal| Ratio| Oz/Gal| Ratio
Clear| 1.40| 91-1| 1.00| 128-1| 0.85| 151-1
Purple| 2.15| 60-1| 1.75| 73-1| 1.40| 91-1
Yellow| 4.00| 32-1| 3.25| 39-1| 2.80| 46-1
Green| 6.70| 19-1| 5.40| 24-1| 4.50| 28-1
Pink| 8.70| 15-1| 7.00| 18-1| 5.60| 23-1
Turquoise| 14.15| 9-1| 11.15| 11-1| 8.15| 16-1
Black| 17.25| 7-1| 13.50| 9-1| 10.00| 13-1
Gray| 22.60| 6-1| 16.75| 8-1| 11.60| 11-1
Red| 25.15| 5-1| 19.50| 7-1| 13.50| 10-1
Blue| 27.50| 4.7-1| 21.65| 6-1| 14.25| 9-1
Brown| 31.00| 4-1| 24.25| 5-1| 15.60| 8-1
White| 33.50| 3.8-1| 26.25| 4.9-1| 16.70| 7.7-1
Orange| 35.40| 3.6-1| 28.00| 4.6-1| 17.40| 7.4-1
Lt. Blue| 36.50| 3.5-1| 29.00| 4.4-1| 18.20| 7-1
Tan| 37.80| 3.4-1| 29.90| 4.3-1| 18.65| 6.9-1
No Tip| 38.30| 3.3-1| 30.90| 4.1-1| 21.30|

DEMA 681AG-4 BLEND CENTER INSTALLATION INSTRUCTIONS


Metering Tip Color

| Injection Rates For Viscosities Shown
---|---
1 cps| 75 cps| 200 cps
Oz/Gal| Ratio| Oz/Gal| Ratio| Oz/Gal| Ratio
Clear| 0.90| 142-1| 0.30| 427-1| 0.20| 640-1
Purple| 1.10| 116-1| 0.50| 256-1| 0.40| 320-1
Yellow| 1.80| 71-1| 1.00| 128-1| 0.70| 183-1
Green| 2.50| 51-1| 1.50| 85-1| 1.20| 107-1
Pink| 3.00| 43-1| 2.00| 64-1| 1.50| 85-1
Turquoise| 4.50| 28-1| 3.15| 41-1| 2.30| 56-1
Black| 4.80| 27-1| 3.75| 34-1| 2.80| 46-1
Gray| 6.70| 19-1| 4.80| 27-1| 3.35| 38-1
Red| 8.15| 16-1| 5.80| 22-1| 3.80| 34-1
Blue| 9.20| 14-1| 6.60| 19-1| 4.20| 30-1
Brown| 11.10| 12-1| 7.75| 17-1| 4.70| 27-1
White| 13.20| 10-1| 9.15| 14-1| 5.00| 26-1
Orange| 15.00| 9-1| 10.10| 13-1| 5.30| 24-1
Lt. Blue| 16.70| 8-1| 11.10| 12-1| 5.50| 23-1
Tan| 18.50| 7-1| 11.80| 11-1| 5.80| 22-1
No Tip| 19.40| 6.6-1| 13.00| 10-1| 6.20| 21-1

RETURNS
NO MERCHANDISE MAY BE RETURNED FOR CREDIT WITHOUT DEMA’S WRITTEN PERMISSION. RETURN MERCHANDISE AUTHORIZATION NUMBER REQUIRED IN ADVANCE OF RETURN.

WARRANTY
DEMA products are warranted against defective material and workmanship under normal use and service for one year.

DEMA 681AG-4 BLEND CENTER INSTALLATION INSTRUCTION

DEMA 681AG-4 Blend Center 1

PRESSURE INDICATING TEE INSTALLATION

DEMA 681AG-4 Blend Center 2

DEMA 681AG-4 Blend Center 3

NO. PART NO. DESCRIPTION
1 66-139 MAGNET HOUSING
2 66-140 PUSH BUTTON
3 63-35 MAGNET
4 63-36 SPRING
5 41-7-25 ENCLOSING TUBE
6 63-87 VALVE REPAIR KIT
7 63-37 SPACER
8 41-1-8 KICKOFF SPRING
9 63-38 PLUNGER
10 41-15-10 DIAPHRAGM, EP
11 63-39 VALVE BODY
12 100-38 STRAINER WASHER
13 93-44 PIPE TO GARDEN HOSE ADAPTOR
14 66-31 CLOSE NIPPLE
15 66-153 PIPE PLUG ASSY
16 61-22GAP-2 GPM PROPORTIONER (WHITE)
17 61-99GAP-2 GPM PROPORTIONER GREEN
NO. PART NO DESCRIPTION
18 61-21 ½” ID X 6’ LONG VINYL OUTLET TUBE (4 GPM)
19 16-3-6 1/3” ID X 6’ LONG VINYL OUTLET TUBE 1 GPM
20 63-78 O-RING EP
21 63-79 INLET BARB 1/4
22 63-80 INLET BARB 3/8
23 100-15K METERING TIP KIT 1/4 BARB
24 61-9K MTERING TIP KIT 3/8 BARB
25 100-12 ¼ ID X 8’ LONG VINYL SUPPLY TUBING
26 100-12L 3/8 ID X 8’ LONG VINYL SUPPLY TUBING
27 61-107-2 CERAMIC WEIGHT FOR ¼TUBING
28 61-107 CERAMIC WEIGHT FOR 3/8 TUBING
29 100-16E-1 FOOT VALVE
30 68-6-QD2 PRESSURE INDICATING TEE

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals