Pablo BEL OCCHIO Pendant Light Installation Guide
- June 10, 2024
- Pablo
Table of Contents
BEL OCCHILO
ASSEMBLY & INSTALLATION INSTRUCTIONS
Installation Guide
BEL OCCHIO Pendant Light
-
LOOSEN STRAIN RELIEF CAP AND FEED CORD THROUGH
-
TIGHTEN STRAIN RELIEF AT DESIRED HEIGHT AND.
ATTACH MOUNTING PLATE TO JUNCTION BOX -
CUT CORD AND CONNECT LAMP WIRING TO BUILDING WIRING
-
SLIDE COVER UP TO CIELING AND SECURE WITH NUT
BULB TYPE
X 5W WHITE BT – 15 MEDIUM BASE HALOGEN
CARE INSTRUCTIONS
WIPE CLEAN WITH A SOFT DAMP CLOTH, AVOID AMMONIA-BASED CLEANERS.
IMPORTANT: WE RECOMMEND CEILING MOUNTING BE INSTALLED BY AN ELECTRICIAN
- PLACE BEL OCCHIO GLOBE ON BASE WITH CORD EXIT FACING UP
ADJUSTMENT
- FOR SUSPENSION MODEL ONLY, SLIDE METAL TABS TOGETHER AS SHOWN
- REMOVE ALUMINUM RING AND REPLACE BULB
120V ASSEMBLY & INSTALLATION INSTRUCTIONS
IMPORTANT: WE RECOMMEND FIXTURE BE INSTALLED BY AN ELECTRICIAN. BEL OCCHIO CHANDELIER MUST BE SECURELY ANCHORED TO 150LBS RATED JUNCTION BOX OR MOUNTED TO CEILING STUDS.
SUGGESTED HANGING CONFIGURATIONS
- DETERMINE APPROPRIATE HEIGHT ABOVE SURFACE FOR LOWEST LAMP
- SPACE EACH LAMP 3.5 INCHES (9CM) ABOVE THE PREVIOUS LAMP
- MOVE UPWARDS IN A SPIRAL PATTERN
-
ROUTE BUILDING WIRING THROUGH MOUNTING PLATE
-
ATTACH PLATE TO JUNCTION BOX WITH PROVIDED JUNCTION BOX MACHINE SCREWS
-
ANCHOR PLATE INTO CEILING STUDS WITH PROVIDED WOOD SCREWS IF POSSIBLE. IF NOT, USE PROVIDED CEILING ANCHORS AND WOOD SCREWS TO SECURE PLATE TO CEILING
NOTE: INSTALLATION REQUIRES STANDARD PHILLIPS HEAD SCREW DRIVER AND #2 FLAT HEAD SCREW DRIVER -
ALIGN HOLES ON MOUNTING PLATE WITH CORRESPONDING HOLES ON CANOPY COVER
-
ATTACH CABLE HOOKS TO CABLE MOUNTS ON CANOPY COVER TO SUPPORT CANOPY COVER DURING INSTALLATION. CABLE HOOKS MUST REMAIN ATTACHED TO CANOPY COVER TO ENSURE SAFE INSTALLATION
-
USING THE SUGGESTED HANGING CONFIGURATION AS A GUIDE, FEED PENDANT CORDS THROUGH ASSIGNED HOLES IN CANOPY COVER AND STRAIN RELIEFS NOTE: INSTALLATION SHOWN IS FOR BEL OCCHIO CHANDELIER 3. FOR BEL OCCHIO CHANDELIER 5, FOLLOW THE SAME WIRING PROCESS USING THE HOLE PLACEMENT OUTLINED IN SUGGESTED HANGING CONFIGURATIONS
9. CUT CORDS TO REACH 12-PORT TERMINAL BLOCKS, ALLOWING FOR 3″ OF EXTRA CORD PAST TERMINAL BLOCKS. STRIP CORDS SO LEAD WIRES ARE EXPOSED, THEN WIRE CORDS TO TERMINAL BLOCKS AS SHOWN AND SECURE WITH #2 FLAT HEAD SCREW DRIVER10. CONNECT BUILDING WIRING TO LEAD WIRE USING PROVIDED WIRE NUTS11. ENSURE ALL CABLES AND CORDS ARE TUCKED WITHIN CANOPY COVER.
LIFT CANOPY COVER UP TO CEILING AND SECURE TO MOUNTING PLATE WITH PROVIDED CANOPY COVER MACHINE SCREWS
INFO@PABLODESIGNS.COM
888 MARIN STREET
SAN FRANCISCO, CA
94124
PABLODESIGNS.COM
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>