LAUPER INSTRUMENTS JPES Gas Detection User Manual
- June 10, 2024
- Lauper Instruments
Table of Contents
- LAUPER INSTRUMENTS JPES Gas Detection
- Product Information
- Product Usage Instructions
- OPERATING MANUAL
- Introduction
- Description
- Technical data
- Startup
- Demounting
- Transport & storage
- Maintenance and service
- Dimensions
- Order codes
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
LAUPER INSTRUMENTS JPES Gas Detection
Product Information
The JPES series of heated gas sample probes is designed for use with dust and aerosol-containing gases in extractive sampling systems. It is especially suitable for measurement in non-stationary applications. The JPES can be used with water vapor and high dew point corrosive gases, which must be kept above their dew point to prevent corrosion and sample degradation prior to analysis or sample conditioning. The JPES can be delivered with a large assortment of accessories and several filter elements to meet user-specific applications.
Features
- Heated sample line JHSo
- Heated sample pipe JBER
- Portable sample probe JPES
- Filter elements of various materials
- Easy filter replacement without tools and without disconnecting the heated sample hose
Product Usage Instructions
Mounting:
The JPES gas sample probe should be mounted in a position where it can
capture a representative sample of the gas stream being monitored. The probe
should be securely mounted using appropriate hardware such as brackets or
clamps.
Installation
Before installing the JPES gas sample probe, ensure that the unpacking
process has been completed correctly. The installation instructions should be
followed carefully, including mounting and electrical connections.
Start-Up
After installation, the JPES gas sample probe should be checked thoroughly
to ensure that all connections are secure and that there are no leaks. Once
the system has been checked, the probe can be started up by applying power to
the heating element and allowing the system to warm up. It is recommended to
wait until the sample line and probe have reached the desired temperature
before taking measurements.
Demounting
When the JPES gas sample probe is no longer required, it should be
demounted carefully. All electrical connections should be disconnected, and
the probe should be carefully removed from its mounting position. The probe
should be stored in a safe and secure location to prevent damage.
Maintenance and Service
The JPES gas sample probe requires regular maintenance to ensure that it
continues to function correctly. The O-rings and filter element should be
checked and replaced as necessary. Filter replacement can be done easily
without any tools and without disconnecting the heated sample hose.
OPERATING MANUAL
2020 by JCT Analysentechnik GmbH Reproduction in whole or in part in any form or medium without written permission is prohibitedAll trademarks not explicitly mentioned are property of their legal owners. JCT provides this operating manual “as is” without any warranty of any kind, either express or implied, including warranties or conditions of merchantability or fitness for a particular purpose. Subject to technical modifications without notice.
Introduction
The JPES series of heated gas sample probes is designed for use with dust and
aerosol-containing gases in extractive sampling systems, especially for
measure-ment in not stationary applications. Water vapour and high dew point
corrosive gases must be kept above their dew point to prevent corrosion and
sample degradation prior to the analysis or sample conditioning.
The JPES can be delivered with a large assortment of accessories and several
filter elements to meet user-specific applications.
The JPES incorporates a non-corrosive heated, replaceable filter element. The
filter element is mounted in a thermally isolated and electrically heated
stainless steel housing covered by a protective enclosure.
The temperature regulation is done by a maintenance-free, PTC heater. The
heated sample line JH-SO 9412 series is directly connected with the probe
housing with a Quick On connection.
For proper selection of various sample pipe constructions and materials as
well as filter elements please refer to our trained personnel.
Mounting
The complete unit consists of the heated filter head, mounting and
installation material. The probe is mounted directly to a sampling hole or
flange. If the assembly takes place horizontally, the JPES should be built in
an angle at least between 5° and 15° from the horizontals falling, to allow
condensate flow back into the process.
Versatile
Different pipes – heated and unheated – materials and filters as well as
heated sample lines make the JPES very flexible for different applications.
Service and security
Filter replacement can be done easily without any tools and without
disconnecting the heated sample hose.
General safety information
Gas sample probes are sophisticated devices intended for use by qualified
personnel only. It is necessary that this manual is been read and understood
by those who will install, use and maintain this equipment.
Intended Use
The portable heated gas sampling probe is designed for mobile use in gas
analysis systems. Please observe the technical specifications regarding
ambient and supply conditions and admissible temperature limits.
CAUTION
The sample probe JPES is not suitable for use in hazardous areas.
Description
Portable sample probe JPES
1 | Filter lock |
---|---|
2 | Filter element |
3 | Isolation |
4 | Quick On lock |
5 | Heated sample line |
6 | Cable connector |
7 | Printed circuit board |
8 | Status and supply indicators |
9 | Carrying handle |
10 | O – ring B (Filter lock outside) Ø 33 mm |
11 | O – ring A (Filter lock inside) Ø 15 mm |
12 | O – ring C (Quick On connectors) Ø 6 mm |
Heated sample line JHSo
1 | Connector stub stainless steel |
---|---|
2 | Integrated temperature controller |
3 | 2 x 2 m power and status cord |
4 | 0.3 m cable with cable connector to sample probe or to heated sample pipe |
5 | Quick on connector to sample probe |
6 | O-ring C (Quick On connectors) Ø 6 mm |
7 | Heater indicator |
Heated sample pipe JBER
1 | Quick on connector to sample probe |
---|---|
2 | Integrated temperature controller |
3 | 0,3 m cable with cable plug from heated hose JHSo |
4 | 0,5 m cable with cable connector to sample probe |
5 | Double tubed sample pipe |
6 | Thread connector R 3/8” |
7 | O-ring C (Quick On connectors) Ø 6 mm |
8 | Heater indicator |
9 | Positioning flange for grid measurements |
Calibration port
The calibration port allows calibration on the raw gas side with minimum
effort.
NOTE
For optimal performance of the sample gas probe JPES we recommend the use of JCT heated sample hoses. These are available in different designs and connection configurations for in-doorand as well for out door use. Additional installation materials and guidelines for professional mounting are also available at JCT.
Filter elements of various materials
- PTFE
- stainless steel
- glass fibre
Technical data
JPES
Operation data
Filter elements | GF, PTFE, SS |
---|---|
Filter surface | 50 cm2 |
Operating pressure | 50 kPa |
Flow rate | up to 200 NL/h, |
depending on filter element
Sample gas wetted parts| SS316Ti, Viton®
Operating temperature nominal| +180°C
Operating temperature max.| +200°C
Heat up time| < 15 min
Permissible ambient tempe- rature| -20°C…+55°C
Protection class in mounting position| IP 42
Area classification| for use in safe,
nonhazardous area only
Construction
Dimension over all | 155 x 188 x 184 mm WxHxD |
---|---|
Sample pipe (standard) | SS316Ti, L= 300 mm, Ø 10 mm |
Dead volume | 36,3 cm3 |
Mounting flange | 20 – 60 mm |
Mounting angle | range 5° to 15° with respect to the horizontal, sloping down |
Mounting position | any |
Weight | 3,1 kg |
Housing material | sheet steel, powder coated |
--- | --- |
Housing colour | RAL 7037 |
Sample gas connection | Quick On |
Heated line connection | Quick On (max. 5 kg vertical load) |
Calibration port | Quick On |
Approval / Sign | CE |
Electrical
Power supply| 230 VAC or 115 VAC/ 50/60
Hz +/- 10%
---|---
Heater element| PTC self limiting
Power consumption| approx. 160 W
Inrush current| 3 A
Status signal| Volt free contact
Contact load| min. 24V DAC / 50 mA;
Low temperature contact limit| max. 230 VAC / 5A cosP 0,95
Switching hysteresis| +150°C (± 5°K)
Connector 7-pin| ± 15°K
Subject to change without notice
Technical data JHSo
Heated sample line
Supply voltage| 115 VAC or 230 VAC/
50/60 Hz
---|---
Power consumption| approx. 100 W/m
Heater| Integrated temperature controller
Protection shell| PA-braided
Outer diameter| 35 mm
Minimal bending radius| 50 mm
Colour| Black
Operating temperature max.| +180°C
Heat up time| < 15 min
Fusing| External, on site
Weight| approx. 0,7 kg/m
Inner core| PTFE
Nominal width inner-liner| ID/OD 4/6 mm
Signal cord| 2 x 0,75², open endings
Power cord| CEE 7/7 or country specific plug
Cable length| 2 m
Protection class| IP54
Technical data JBER
Heated sample pipe
Supply voltage | 115 VAC or 230 VAC/ 50/60Hz |
---|---|
Power consumption | approx. 530 W |
Heater | Integrated temperature controller |
Gas wetted parts | SS 316 Ti |
Outer diameter | 25 mm |
Nominal width inner-pipe | ID 4 mm |
Length | 500 / 750 / 1000 / 1500 / |
2000 / 2500 mm
Length over all| 610 / 860 / 1110 / 1610 /
2110 / 2610 mm
Weight| 1,1 / 1,2 / 1,4 / 1,8 / 3,0 / 3,6 kg
Operating temperature| +180°C
Sample gas temperature| max. 250°C
Heat up time| < 15 min
Connector 7-pin| Power supply via heated hose
Protection class| IP54
Pressure characteristics (with new filter)
Flow charts
Installation, unpacking
- Check instrument for any damage caused by shipping. If any damage is established, contact the carrier and dis-tributor immediately.
- Check instrument and any other parts against order.
Installation instructions
- Disconnect mains before working on electrical part of equipment.
- The equipment has to be connected and grounded according to the local rules and regulations.
- It is essentially necessary to keep the electronics away from radiant heating (thermal insulation). The ambient temperature must not exceed 60°C.
- The probe mounting has to be done always with a minimum inclination of 5° towards the sampling pipe. This is necessary to prevent a possible flow back from condensate into the probe.
Mounting
- Mount filter element according to description.(Refer to chapter “Maintenance and service”).
- Push in sample pipe and tighten union nut stalwart.
CAUTION
Sealing is radial. Tighten stalwart only!
NOTE
Lateral mobility of the sample pipe is normal as sealing is radial.
- Mount the probe with a gasket or universal adapter with aid of some PTFE paste on the process flange or sampling hole. (see “Installation example”)
- The universal adapter which is part of the set is suitable for nominal pipe sizes up to 60mm. Adapters for larger diameters are available on request.
- Hang up the JPES sample probe with a mounting chain.
- Take care of the correct mounting angle according to technical specifications.
- Connect the sample line to the JPES by pulling out the Quick On lock and pushing in the sample line. Then connect the other end to the sample conditioning or analyzer.
- Establish electrical connections, supply as well as the status contact for the analyzer.
- Connect the cable connector of the heated sample line (4) with the sample probe.
- for heated sample pipe: install electrical connection from heated sample line via heated sample pipe to probe, i.e. connect cable plug (3) of heated sample pipe with heated sample hose and cable connector (4) with the probe.
CAUTION
Quick On must lock into place properly.
CAUTION
If the sample gas temperature exceeds 250°C, mount sample probe not flush
but in adequate distance or with a thermal isolation mat.
NOTE
Maximum temperature for the universal adapter is 250°C.
NOTE
The heated sample line must be strain relieved and must not be hung on the
fitting
CAUTION
Never use grease for mounting sample pipe!
Installation example
Electrical connections
- Check local voltage, frequency, and power consumption against type plates of probe, heated line, and (if applicable) heated pipe.
- Connect mains to the supply outlet and JPES temperature status contact to the analyzer. If needed, connect a 2-pole switch in the main supply. The JPES sample probe is not equipped with a switch.
- The operator must provide suitable stress relief for all cables.
- Fusing has to be done on-site according to local rules and regulations.
- Take care of min. bending radius and mechanical support by the mounting of the heated hose.
Electrical interface
Electrical interface (probe only)
CAUTION
This unit is operated with mains power. During operation, some parts of the unit are energized with dangerous volt-age! During operation, the housing of the probe can get very hot. Removing the probe housing will expose heated parts. Disconnect power before repair or maintenance and ensure that the internal temperature has dropped to a safe level before working on it. Always wear heat-resistant gloves. There is a burn hazard if necessary precautionary steps are not taken. This unit is not intended for use in explosion-hazardous areas or with explosive or flammable gases and must not be operated under these conditions. If these warning notices are ignored possible serious injuries and/or damages may be caused.
Only qualified staff who has been trained according to this manual should operate and maintain this instrument. For certain and safe operation the instrument needs to be transported carefully, be part of a well-planned application, installed correctly as well as operated and maintained according to these instructions. Requirements for qualifications of staff: Qualified staff in the sense of this manual and/or the warning references are persons, who are familiar with assembly, mounting, start-up, and operating of this prod-uct and have sufficient qualifications for their tasks.
Startup
-
Check of the proper installation
-
Review the equipment for damage
-
Check for leaks.
-
Ensure that the unit, filter room, and filter element are clean and no foreign particles are inside.
-
Check all connectors and cable glands for a tight fit.
CAUTION Before switching on the sample probe ensure that the operating voltage of the unit and the line voltage are identical. -
Switch on the power supply of the JPES sample probe. The yellow LED is turned on. After a lead time of approx. 15 minutes the green LED lights up and the operating temperature is reached.
NOTE
Any smell at the first time heat up is normal and is no reason for a warranty
claim. New filter elements and sealings may influence the measurement results.
It is recommended to purge the gas sampling probe diligently in heated
condition.
Feeding of calibration gas:
- Feed calibration gas with minor overpressure (approx. 2l/min more than sample gas flow) into the calibration port.
- Excess calibration gas flows off into the process.
Demounting
- Purge the probe with air or inert gas for approx. 20 min.
- Disconnect units supply at the site and disconnect the status contact.
- Take the heated line out of service.
- Disconnect cable connector from JPES respectively from heated sample pipe.
- Loosen Quick on lock from probe and remove it downwards.
- Remove probe from sample duct.
- Disassemble sample pipe with disassembling aid.
- Store and dispose with expertise.
Transport & storage
To ensure flawless usage over many years, transport and store of the JPES sample probe, the heated sample line and their accessories, only in appropriate transport cases (e.g. JPES carrying case).
Maintenance and service
NOTE
If an item is returned to JCT Analysentechnik, for main-tenance or repair
reasons, it will only be accepted after the RMA form on our website has been
completed (www.jct.at/rma). This is to ensure the
security of JCT staff.
Recycling
The unit contains elements which are suitable for recy-cling, and components which need special disposal. You are therefore requested to make sure that the unit will be recycled by the end of its service life.
Replacement of O-rings
O-rings are consumables. Replace indurate or damaged O-ring seals (A, B, C) of
heated sample line or filter lock.
- Shut down JPES sample probe and heated sample line and wait for cool down.
- Pull off O-rings with non metallic tool (wood- or plas-tic wedge).
- Apply a thin wetting of PTFE paste on O-rings and pull them on.
Replacement of filter element
Filter elements, O-rings and gaskets are consumables and have to be replaced
regularly, at least once a year. Ensure that sealing surfaces are clean and
unhurt. Please note that FFKM sealing materials are aging irre-versibly at
high temperatures. This process is called “outgasing”.
Burn hazard!
Use heat resistant gloves.
CAUTION
The housing of the probe may get very hot!Take care, in case of process over
pressure, explosive and/or toxic gas emanation is possible. To avoid accidents
take care for necessary safety pre-cautions in case of service and
maintenance.
For cleaning or replacing following steps should be done:
- Switch off the power supply and wait for cooling down of the probe.
- Turn away the filter lock (Pos 1) for pulling out the filter element.
- ‘Take-off the filter element (Pos 2) from the support tube of filter lock (Pos 1). Pull out filter element and if applicable gaskets.
- Replace the filter element (Pos 2) and/or the gaskets (applies only for sieve filter elements).
- Remount the filter element (Pos 2) and if applicable the gaskets.
- Screw on the filter element-screw stalwart.
CAUTION
Tightening is radial. Tighten stalwart only!
NOTE
Any smell at the first time heat up is normal and is no reason for a
warranty claim. New filter elements and sealings may influence the measurement
results. It is recommended to purge the gas sampling probe diligently in
heated conditions.
Dimensions
Order codes
partno Description
34.00150 | JPESX Starter kit, 115 VAC |
---|---|
34.00250 | JPES Starter kit, 230 VAC |
34.00180 | JPESX Premium kit, 115 VAC |
34.00280 | JPES Premium kit, 230 VAC |
Scope of delivery JPES Starter kit
Content
1 | 1x Portable sample probe JPES, |
---|---|
2 | 1x Calibration gas tamping |
3 | 1x Sample pipe Ø 10 mm, length 300 mm |
4 | 1x Filter microfiber |
5 | 1x Heated sample line 3 m |
6 | 1x Disassembling aid |
7 | 1x Carrying case* |
8 | 1x Operating manual |
9 | 1x Mounting chain (l=2 x 1 m) |
10 | 1x Universal sample pipe adapter |
Scope of delivery JPES Premium kit
content
1 | 1x Portable sample probe JPES |
---|---|
2 | 1x Calibration gas blind plug |
3 | 1x Calibration gas connector (on request with fitting) |
4 | 1x Sample pipe Ø 6 mm, length 300 mm |
5 | 1x Sample pipe Ø 8 mm, length 300 mm |
6 | 1x Sample pipe Ø 10 mm, length 300 mm |
7 | 5x Filter element microfiber |
8 | 2x Filter element PTFE |
9 | 1x Heated sample line 5 m |
10 | 1x O-ring set |
11 | 1x PTFE paste 113,4 g collapsible tube |
12 | 1x Disassembling aid |
13 | 1x Carrying case* |
14 | 1x Operating manual |
15 | 1x Mounting chain (l = 2 x 1 m) |
16 | 1x Universal sample pipe adapter |
Accessories
- Description
- O-ring removal tool
Heated sample lines
Heated hose 230 VAC l=3 m inside 6x4mm integrated controller
Heated hose 230 VAC l=5 m inside 6x4mm integrated controller
Heated hose 230 VAC l=7 m inside 6x4mm integrated controller
Heated hose 230 VAC l=10 m inside 6x4mm integrated controller
Heated hose 230 VAC l=15 m inside 6x4mm without controller
Heated hose 230 VAC l=20 m inside 6x4mm without controller
Heated hose 115 VAC l=3 m inside 6x4mm integrated controller
Heated hose 115 VAC l=5 m inside 6x4mm integrated controller
Heated hose 115 VAC l=7 m inside 6x4mm without controller
Heated hose 115 VAC l=10 m inside 6x4mm without controller
Heated hose 115 VAC l=15 m inside 6x4mm without controller
Heated hose 115 VAC l=20 m inside 6x4mm without controller
Filter elements
Filter element microfiber 2 µm (5 pcs.)
Filter element PTFE 2 µm (3 pcs.)
Filter SS sieve fabric 2 µm, incl. sealing
Sample pipes
SS316Ti, ID/OD 10/12 mm, max. 600°C; L= 300 mm
SS316Ti, ID/OD 10/12 mm, max. 600°C; L= 500 mm
SS316Ti, ID/OD 10/12 mm, max. 600°C; L= 1000 mm
SS316Ti, ID/OD 10/12 mm, max. 600°C; L= 2000 mm
SS316Ti, ID/OD 8/10 mm, max. 600°C; L= 300 mm
SS316Ti, ID/OD 8/10 mm, max. 600°C; L= 500 mm
SS316Ti, ID/OD 8/10 mm, max. 600°C; L=1000 mm
SS316Ti, ID/OD 6/8 mm, max. 600°C; L= 300 mm
SS316Ti, ID/OD 6/8 mm, max. 600°C; L= 500 mm
SS316Ti, ID/OD 6/8 mm, max. 600°C; L=1000 mm
SS316Ti, ID/OD 4/6 mm, max. 600°C; L= 300 mm
SS316Ti, ID/OD 4/6 mm, max. 600°C; L= 500 mm
SS316Ti, ID/OD 4/6 mm, max. 600°C; L=1000 mm
Heated pipes with integrated temperature controller
heated sample pipe 230 VAC, l=500 mm
heated sample pipe 230 VAC, l=750 mm
heated sample pipe 230 VAC, l=1000 mm
heated sample pipe 230 VAC, l=1500 mm
heated sample pipe 230 VAC, l=2000 mm
heated sample pipe 230 VAC, l=2500 mm
heated sample pipe 115 VAC, l=500 mm
heated sample pipe 115 VAC, l=750 mm
heated sample pipe 115 VAC, l=1000 mm
heated sample pipe 115 VAC, l=1500 mm
heated sample pipe 115 VAC, l=2000 mm
heated sample pipe 115 VAC, l=2500 mm
pre filter for heated sampling pipe JBER
Positioning flange for grid measurements
DN 65, PN6; DIN 2573; SS 316
2“, SS 316
3“, SS 316
Adapter for third-party heated lines without Quick On connection
Calibration gas connector
Mounting chain (2×1 m)
Disassembling aid (flat spanner)
Stationary sampling point: sample gas connector with ferrule for screw in
mounting
Stationary sampling point: sample port with ferrule welded in mounting
Mobile sample point adapter universal (cone-shaped for pipe diameter 20…60 mm)
Spare parts
Description
34.00520 | Filter lock complete |
---|---|
34.90025 | Calibration gas blind plug |
P3400100 | Carrying case yellow with shell moulds |
K3401001 | O-ring for positioning flange |
Consumables
Description
part no
| Description
---|---
34.90011| O-ring A (Filter lock inside) Ø 15mm
34.90013| O-ring B (Filter lock outside) Ø 33mm
34.90012| O-ring C (Quick On connectors) Ø 6mm
34.90010| O-ring set consisting of: 1x O-ring A, 1x O-ring B, 4x O-ring C
K3419010| PTFE paste 113,4g collapsible tube
Fault diagnostic checklist
Malfunction | Cause / remedy |
---|---|
No operation | • check power supply and fuses |
Low tempe- rature | • operating conditions beyond specificati- ons |
check operation conditions
• Heater defective call JCT service
Wrong mea- surements| • check O-ring sealings replace O- rings
Flow blocked or too low| • filter element clogged
check pre filter (if applicable) replace filter element
• operating conditions beyond specificati- ons
Add additional pre filter
Lauper Instruments AG Irisweg 16B
CH-3280 Murten Tel. +41 26 672 30 50 info@lauper-instruments.ch www.lauper-instruments.ch
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>