MULTIBETON B 50302 24V Strip Terminal Basic Instruction Manual
- June 10, 2024
- MULTIBETON
Table of Contents
MULTIBETON B 50302 24V Strip Terminal Basic Instruction Manual
Scope of supply
-
Take off the cover.
-
Install the base. In case of wall mounting, fix the base to the wall with 2 screws
Ø 4 mm and corresponding dowels according to the quality of the wall. In case
of installation on a mounting bracket, use a bracket TS 35/7.5. -
Make the electric connection.
-
Install the cover
Select and insert the fuse (only B 50302)
Depending on the fuse inserted
(included in the scope of delivery) the B 50302 can be oper
Parametrization
The control direction is set with jumper 1:
NO operation: Jumper 1 = ON
NC operation: Jumper 1 = OFF
The fixed follow-up time of 2 minutes of the pump or the
boiler can be increased by further 5, 10 or 15 minutes
using jumper 2 and 3:
Time | Jumper 2 | Jumper 3 |
---|---|---|
0 min | OFF | OFF |
5 min | OFF | ON |
10 minutes | ON | OFF |
15 minutes | ON | ON |
LED signalling (only B 40×02, B 20×02)
Electric connection
The voltage supply of the 24 V version must come from a safety transformer
according to EN 61558-2-6 or, for North America, from a Class II Transformer according to UL.
For the connection of the voltage supply, the cable sections must be a minimum of 0.75 mm² for 24 V or 1.5 mm² for 230 V. Depending on the voltage version of the base, it is possible to take L1 or L and L2 or N, as well as the protective conductor, from the base. If no temperature limiter is connected, the connection TB/%H must be bridged (provided for at the factory). The bridge must be removed as soon as a temperature limiter is connected. The temperature limiter must be a normally closed contact.
8 Maintenance
WARNING Electrical voltage! Danger to life!
- Always disconnect the base from the mains network and secure against unintended activation before opening.
- Disconnect external voltages and secure against unintended activation.
Cleaning
WARNING!Electrical voltage! Danger to life!
- Always disconnect the base from the mains network and secure against unintended activation before opening.
- Disconnect external voltages and secure against unintended activation.
- De-energise the complete installation.
- Remove the wiring to all externally connected components.
- Remove the base and dispose it of properly, if necessary