MULTIBETON FEB-19-18 MB Ready Floor Instruction Manual
- October 30, 2023
- MULTIBETON
Table of Contents
FEB-19-18 MB Ready Floor
Instruction Manual
General
The MB Thermal installation is decisive for the installation of MB Dry
systems.
In case of possible plasticizer migration from the substrate covering (e.g.
roofing membrane) to the MB Load distribution plate (MB-DVP), a separating
layer must be made with the MBPEF (polyethylene film).
System installation
Installation follows the MULTIBETON plan. Then follow the MULTIBETON
installation and technical guidelines. Planning and creating the MULTIBETON
underfloor heating/cooling must further comply with the relevant laws,
regulations, directives and standards. Additional instructions of
manufacturers for other trades and the recognised rules of technology and
proper trade workmanship must be observed.
MB Load distribution plate (MB-DVP)
The MB Load distribution plates (MB-DVP) are prefabricated. The installation
types A15 and A20 are possible. Load distribution plates are available in
various widths:
- strips 17 mm, 37 mm, 150 mm and 200 mm
- inner bows 150 mm and 200 mm
- outer bows 150 mm and 200 mm
Before laying the MB Load distribution plates (MB-DVP), it is essential to
plan the exact layout. A later correction is time-consuming. On request, the
installation can be explained and demonstrated on site by the responsible
technical advisor/specialist installer.
If several supply lines run through the room, radius plates are offered for
the corners of the room.
For the installation of MB Dry systems, it is important to know that MB Steel clip rails 12 (MB-CS12) are produced with a short (17 mm) and a long (34 mm) end.
The long end (34 mm) of the MB Steel clip rail 12 (MB-CS12) is used to start the installation of the MB Dry system on the coldest outer wall. The short end (17 mm) of the first MB Steel clip rail 12 (MB-CS12) is extended with the long end (34 mm) of the next MB Steel clip rail 12 (MB-CS12), butt to butt.
MB Ready Floor & MB Dry Floor
Assembly instructions (FEB-19/18 & TRB-17)
-
Laying the strips and outer bows
Experience has shown that the system installation of the MB Euro system pipe 12 (MB-ER12) starts at the coldest wall. Strips (37 mm) outer bows and MB Steel clip rails 12 (MBCS12) are laid along this installation.
Between the strip (37 mm) and the outer bow , 12 mm are kept free for the MB- Euro system pipe 12 (MB-ER12).
The outer bows are used firstly to maintain the distance.
-
Laying the inner bows and the system pipe The inner bows are laid according to the system layout. The outer bows are now also positioned according to the system design. The MB Euro System pipe 12 (MB-ER12) is laid.
Once again, check the quality of the gaps for the smallest possible distance between MB Load distribution plates (MB-DVP), MB Steel clip rails 12 (MB-CS12) and MB Euro System pipe 12 (MBER12) and readjust if necessary.
-
Laying the strips (150 mm and 200 mm) Now lay the strips (150 mm and 200 mm) for installation types A15 and A20 respectively. Please make sure that the tongue of the strips is placed under the pipe for better heat transfer and statics. Any gaps must be closed with cuttings of MB Load distribution plates (MB-DVP).
Proceed similarly with the other heating circuits as just described. Remaining gaps can be filled with the strips (17 mm or 37mm).
-
Laying the load distribution layer
A dry screed element is installed for the MB Dry Floor (TRB-17). Please read the system instructions from MULTIBETON or the manufacturer of the dry screed elements.
For the MB Ready Floor (FEB-19/18), the MB Steel tile is installed. As before with the MB Load distribution plates, start at the back left of the room and work to the right. Then the next row is laid.
The grooves of the MB Steel tiles are to be cut with the angle grinder in the corner where the installation is to begin and in the adjoining walls. This ensures that the MB Steel tiles are bonded all the way to the edge insulation strip.
-
Bonding the MB Steel tiles It has proven advantageous to first lay some whole MB Steel tiles with tongue on groove on the previously mentioned MB Steel tiles without groove (still with underside protection foil) before removing the underside protection foil of the adhesive surface. Any necessary cuts must be planned and carried out for the entire room before removing the underside protection foil. The MB Steel tiles cannot to be corrected after bonding.
-
Removing the protective film from the tabs
The protective film of the tabs is removed to align the next tileon the right or front side.
-
Further laying of the MB Steel tiles
Measurements are taken at the edges, cut to size and checked again and again (with protective foil). Only when the measurements are really certain are the protective foils removed and the MB Steel tiles firmly glued in place.
-
Walking on and heating up
At the end of installation, the MB-Steel tiles must be walked on at least once with the full weight of the body.
Before the top floor is laid, the MB Dry system is heated up for at least 3 hours.
MULTIBETON GmbH, Heuserweg 23, 53842 Troisdorf-Spich, Phone +49 2241
25200-0, Fax +49 2241 25200-99
E-Mail info@multibeton.com, Internet
www.multibeton.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>