ZKTeco EC16 Elevator Control Panel and Elevator Floor Expansion Board User Guide

June 11, 2024
ZKTECO

ZKTeco EC16 Elevator Control Panel and Elevator Floor Expansion Board User Guide
ZKTeco EC16 Elevator Control Panel and Elevator Floor Expansion
Board

Cautions

Please note the following cautions. Mis-operation may lead to personal injury or equipment failure:

  1. Do not operate with electricity. Do not energize until installation is complete. Make sure the wiring is correct before energizing.
  2. All peripheral devices must be grounded.
  3. It is recommended that all wiring be sleeved, either with PVC pipe or galvanized pipe.
  4. The exposed part of the wiring terminal should not exceed 0.16 inches (4mm) to prevent accidental contact caused by long bare wires, which may lead to short circuit and other faults.
  5. The main controller and expansion board of the elevator are installed on the top of the elevator car.
  6. It is preferable to install readers and buttons at the height of 55 inches to 59 inches (1.4m to 1.5m) above the ground or subject to customers usual practice for proper adjustment.
  7. Please use the matching power supply accessories provided by the equipment manufacturer to supply power to the elevator controller, or use the power supply consistent with the equipment power supply information.

Other Notes:

  1. RESET button: Long press 1 to 5 seconds for U disk upgrade; 5 to 10 seconds to  restart the controller; 10 seconds or more to restore the factory settings. When restoring the factory settings, only the network configuration of the device isrestored, other data is notrestored.
  2. Dual Ethernet interfaces: The default IP address 192.168.1.201 for the primary NIC and 192.168.2.202 for the expansion NIC.

LED Indicators

After connecting the main controller correctly, turn on the system power, the  LED indicatorsin normal condition is described asfollows.

  1. LED indicators on the Enclosure
    PWR indicator (red):
    Solid Red LED indicates normal energization.
    COMM indicator (yellow):
    Slowly flashing Yellow LED indicates data communication is in progress.
    RUN indicator (green):
    Slowly flashing Green LED indicates normal working status of the system.

  2. LED indicators on the Elevator master controller panel
    POWER indicator (red):
    Solid Red LED indicates normal energization.
    RUN indicator (green):
    Slowly flashing Green LED indicates normal working status of the system.
    COMM indicator (yellow):
    Slowly flashing Yellow LED indicates data communication is in progress.

System Equipment Composition

The elevator controller system is composed of the following equipments.
System Equipment Composition

EC16 Master Control Panel
9.16.5inch (230165mm)

DEX16 Expansion Board
5.26.5inch (132165mm)

No. Description No. Description
1 Floor Button Control Port 103 FIRE
2 Extend Port 104 Emergency Button
3 Wiegand 150 Manual Button
4 RS-485 160 Power Input
5 LED Indicator 107 Ethernet Interface (LAN1)
6 Elevator Door Closing Button 180 TCP/IP Reader Interface (LAN2)
7 Elevator Door Opening Button 190 U Disk Interface
8 Alarm Output 1200 Reset Button
9 Speaker 1201 Floor Button Control Port
10 Voice 1202 DIP Switch
101 LED Indicator Port 1203 RS-485 Input
102 Tamper Switch 1204 RS-485 Output

System Installation Diagram

System Installation Diagram

DEX16 Expansion Board Connection

Use the software setup after connecting the DEX16 module to the EC16 master controller.
DEX16 Expansion Board Connection

Notes:

  1. A maximum of seven DEX16 expansion boards can be connected to one EC16 controller.
  2. The total can be expanded to 128 layers at most.
  3. Before power is supplied, use the DIP switch to set the RS-485 addresses of the DEX16s, following the order in which each DEX16 is connected.
  4. The DIP switch needs to be set with the control board powered off and takes effect after restart. After setting, the DIP sw itch does not need to be set back to its original position.

Elevator Button Connection

Elevator Button Connection

Elevator button wiring
Elevator button wiring
Elevator Button 

Instruction:
Connect SignalCable 1 to theNO terminal ofthe correspondingfloor.After SignalCable 2 is disconnected, COM and NC terminals are connected to theCOM andNCterminals ofthe corresponding floor respectively

Wiring for swipe to select floor and direct floor selection
Wiring for swipe to select floor and direct floor
selection

Instruction: S1/S2 switches are two relays (S1 relay is normally closed and S2 relay is normally open) of the elevator control board respectively. S1 is disconnected after power on, and S1 is closed after swiping the layer selection card, then the elevator button can be lit by pressing; S2 is closed afterswiping the direct access card, then the elevator button will be lit automatically

Reader Connection

RS-485 readers and Wiegand readers need to be connected with the master elevator controller in order to make relevant settings through the ZKBio CVSecurity Software. The system sends the personnel information to the master controller through the software, and reader  thenuploads the data to the master controller for comparison and verification after collection. The following is the wiring diagram of various readers and elevator controller.
Reader Connection
Note:

  1. The readers can be connected to the elevator controller via Wiegand and RS 485.
  2. Open DEMO, select the serial port number, the default baud rate is 115200, click “Connect” and “Scan Address” and then put the card or QR code (paper, electronic , mobile phone) into the recognition range of the card reader, and read the card. The device automatically obtains and transmitsthe information carried by the card or QR code to the controller
  3. Each EC16 can connect a maximum of eight RS-485 readers and two Wiegand readers.

Connect to ZKBio CVSecurity

Add the elevator control device on the software

Login to the software and add the device by searching. The processis as follows:

  1. Click Elevator > Elevator Device > Device to enter the device setting interface.

  2. Click Search to open the Search interface in the software.

  3. Click Search to search the elevator controller. Aftersearching, a list of \controllers will be displayed.
    Connect to ZKBio CVSecurity

  4. Click Add after the controller in the operation bar to add the device.

  5. After setting the relevant parameters, click OK to finish adding the elevator controller.

  6. Click Close to close the Device Search Add interface

Register users and send to the elevator control device

  1. Click Personnel> Personnel> Person > New to register usersin the software.
  2. Add usersto elevator control level.
  3. Click Elevator > Device > Control > Synchronize All Data to Devices to synchronize all data to the controller, including new users. As shown in the figure below.
    Connect to ZKBio CVSecurity

Assign elevator control levels group

  1. Click Elevator > Elevator Control Rule > Elevator Levels to enter the setting\ interface.

  2. ClickNew to add a new elevator control level group.

  3. Enter the level name, time zones and setting area, then click OK to confirm and exit.
    Connect to ZKBio CVSecurity

  4. After adding successfully, check the levels group.

  5. Click Add Flooricon to add the selected floor to the levels group.

  6. The added floors will be displayed in the Floorlist on the right.
    Connect to ZKBio CVSecurity

Setting of Elevator Control Authority Allocation

Authority allocation is used to manage the elevator control authority of personnel. Only after the authority allocation can personnel normally verify the operation of entering and leaving the elevator Permission assignment supports three methods: setting access by levels, setting access by person, and setting access by department.

a. Set Access By Levels

  1. Click Elevator > Elevator Control Rule > Set Access By Levels to enter the setting interface.
  2. Check the levels group and click the Add Personnel icon in its bar to open the settings window.
  3. Select the person and then click to move it to the selected column on the right.
  4. Click OK to confirm and exit.
    Connect to ZKBio CVSecurity

b. Set Access By Person

  1. Click Elevator > Elevator Control Rule > Set Access By Person to enter the setting interface.
  2. Check the levels group and click the Add to Levels icon in its bar to open the settings window.
  3. Select the levels group and then click to move it to the selected column on the right.
  4. Click OK to confirm and exit
    Connect to ZKBio CVSecurity

c. Set Access By Department

  1. Click Elevator > Elevator Control Rule > SetAccess ByDepartmentto enter the setting interface.
  2. Check the department and click the Add to Default Levels icon in its bar to open the settings window
  3. Select the levels group and then click to move it to the selected column on the right.
  4. Click OK to confirm and exit.
    Connect to ZKBio CVSecurity

Add Expanding Board

Make sure to power off the device and connect the expansion board correctly, then set the RS485 address of the expansion board with the DIP switch and restart the device.

  1. Click Elevator > Elevator Device > Expanding Board to enter the setting interface.
  2. ClickNew to add a expanding board.
  3. Set the relevant parameters and then click OK to confirm and exit.
    Connect to ZKBio CVSecurity

ZKTeco Industrial Park, No. 32, Industrial Road, Tangxia Town, Dongguan, China.
Phone : +86 769 – 82109991
Fax : +86 755 – 89602394
Qr code
www.zkteco.com
Copyright©2023ZKTECOCO., LTD.All Rights Reserved.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals