ZKTeco ZKT2080003 Mobile Stand Interactive Screen Package Installation Guide

October 30, 2023
ZKTECO

ZKTeco ZKT2080003 Mobile Stand Interactive Screen Package Installation Guide
Mobile Stand Interactive Screen Package

  • To ensure correct and safe use, read carefully read this manual before installation.
  • It is recommended to equip this model with a 55 to 86 inch interactive whiteboard.
  • The maximum weight of the bearing can support up to 100 kg.

Packing list

A – Left support 1 piece
Left support
B – Right support 1 piece
Right support
C – Wall bracket 1 piece
Wall bracke
D – Tray 1pc
Tray
E – Wheels 4 pieces

F – Bar for hanging on the wall 2 pieces*

Cross recessed hex head screw| M8 × 25 mm| 14 pieces|
---|---|---|---
Spring cushion M12| ÿ20×ÿ13 mm| 4 pieces|
M6 screw*| M6 × 130 mm| 2 pieces|
Phillips Screwdriver (User Prepared)| | 1 PC|
Adjustable Wrench (User Prepared)| | 1 PC|

Note: “*” Indicates that due to differences in models, some models include this accessory, please refer to the current one.

Installation steps

Step 1
Set the wheel to the brake state and screw it into the brackets (as in Figure 1).
Wheel Installation

Step 2
Attach Wall Bracket to Left Bracket (as in Figure 2), 3 sets of mounting heights (1 & 4, 2 & 5, 3 & 6), optional on demand.
Attaching Wall Bracket

Step 3
Attach the right bracket to the other end of the bracket wall (as shown in Figure 3).
Attaching Right Bracket

Step 4
Installation of the tray between the two supports (as in Figure 4).
Tray Installation

step 5
Attach the wall hanging bar to the entire machine as required. necessary (as shown in Figure 5).
Attaching Wall Hanging

step 6
Hang the complete assembled machine on the wall bracket and lock the security screw of the Wall hanging bar (as in Figure 6).
Make sure the brakes are locked, this step requires at least 2 professionals to complete.
Hanging Complete

step 7
Please refer to the following image for the finished product.
Product Overview

OBSERVATIONS:
When the interactive whiteboard with its own hanging bar cannot be seamlessly combined effective with the tripod, you need to modify it together with the wall mount plate, as shown below. continuation.

  1. Attach the wall mount plate to the wall bracket
    Attaching Mount Plate

  2. Hang the interactive whiteboard on the wall mounting plate and lock the security bolt
    Locking Security Bolt
    QR Code

ZKTeco Industrial Park, No. 32, Industrial Road, Tangxia City, Dongguan, China.
Phone: +86 769 – 82109991
Fax: +86 755 – 89602394

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals