NTI boilers are factory set to operate with Natural Gas. BEFORE OPERATING WITH PROPANE the boiler must be converted to Propane using this kit.
Use the procedures outlined in these instructions to fully complete the Natural Gas to LP conversion for models 085, 110, 150, and 199.

If the kit contents do not match those specified for your boiler model (see Table 1), DO NOT proceed with installing the LP Conversion Kit, and DO NOT operate the boiler – contact NTI for assistance.

Kit Contents:

  • Natural to LP Conversion Instructions nr. 1
  • LP Conversion Label nr. 1
  • LP-Mixer w. Diaphragm (Table 1) nr. 1
  • Gasket for gas pipe nr. 2

Table 1 – LP Mixer and Gas Diaphragm

Model| Polidoro code (MIXER data plate)| LP diaphragm Ø in (mm)
---|---|---
085 and 110| 350_0944_03| 6.4 mm
150| 350_0921_03
199| 350_0922_03| 6.9 mm

WARNING These instructions CANNOT be used to convert NTI appliance models not referenced in these instructions.
Contact NTI for the Natural Gas to LP conversion kit and instructions for other models.

Failure to apply these instructions properly may result in dangerous Carbon Monoxide levels, fire or explosion leading to property damage, personal injury or death.

ATTENTION: LIQUEFIED PETROLEUM (LP) PROPANE
Liquefied Petroleum (LP) propane gas is heavier than air; therefore, it is imperative that your boiler is not installed in a pit or similar location that will permit heavier than air gas to collect.

Local Codes may require appliances fueled with LP gas be provided with an approved means of removing unburned gases from the room. Check your local codes for this requirement.

WARNING


Breathing Hazard – Carbon Monoxide Gas

  • Do not operate heater if flood damaged.
  • Install vent system in accordance with local codes and manufacturers installation instructions.
  • Do not obstruct heater air intake or exhaust. Support all vent piping per manufacturers installation instructions.
  • Do not place chemical vapor emitting products near unit.
  • According to NFPA 720, carbon monoxide detectors should be installed outside each sleeping area.
  • Never operate the heater unless it is vented to the outdoors.
  • Analyze the entire vent system to make sure that condensate will not become trapped in a section of vent pipe and therefore reduce the open cross sectional area of the vent.

Breathing carbon monoxide can cause brain damage or death.
Always read and understand instruction manual.

Propane Conversion Procedure

Install LP-Mixer with LP-Diaphragm

  • a. Check that the code of the air / gas mixer and the diameter of the gas diaphragm are those indicated for the model of boiler to be converted – see Table 1.

  • b. Turn the 120VAC power supply OFF to the boiler.

  • c. Turn the gas supply OFF.

  • d. Remove the front cover from the unit.

  • e. Remove the silencer.

  • f. Unscrew the two nuts and remove the gas pipe.

  • g. Remove the three bolts securing the NG-mixer to the blower and remove the NG-Mixer.

NOTICE: 150 NG-mixers are equipped with an NG Diaphragm located on the mixer gas line inlet (see Figure 4 for general diaphragm location).
NOTICE: Save the NG-mixer (and NG Diaphragm for 150) in-case the boiler needs to be converted back to Natural Gas at a later date.

  • h. Secure the LP-Mixer (with LP Diaphragm) to the blower in the same position as the removed NG-Mixer, reusing the bolts from the previous step.
    NOTICE: Verify the O-ring seal between the mixer and blower is correctly positioned and in good condition before assembling.

  • i. Reassemble the gas pipe to the gas valve and mixer.
    ATTENTION!! Use the new rubber gaskets provided with the kit.

  • j. Install the silencer.

Perform preliminary adjustment on gas valve throttle screw 4.

  • a. 085 and 110: Adjust throttle screw 4 counter-clockwise 0.5 turns.
  • b. 150 and 199: Adjust throttle screw 4 counter-clockwise 2 turns.
  • c. Turn the gas supply on and test for gas leaks in all piping.
  • d. Perform gas line pressure test and combustion calibration in accordance with Parts 2 and 3.

NOTICE: 199 Model ONLY: When converted to LP, the 199 model must have the Max Power (parameter 24.1.1) adjusted from 87% to 89%, and the Min Power (parameter 24.1.3) adjusted from 4% to 6%.
Parameters are adjusted from Tech Menu – Complete Menu.

Gas valve and burner setup

WARNING Failure to perform the Gas Valve and Burner Setup correctly may result in incorrect operation, component failure, property damage, serious injury or death.

Operating Sequence

Prior to commencing the Gas Valve and Burner Setup, perform the following operating sequence check:

  • a. Turn the supply of gas to the boiler off.
  • b. Set the thermostat to the highest setting.
  • c. Ensure the combustion fan prepurges for a short time prior to activating the igniter.
  • d. Ensure the combustion fan postpurges for at least 5 seconds prior to reactivating the igniter.
  • e. Set the thermostat to the lowest setting and continue with the Gas Valve and Burner Setup procedure outlined below.

Gas Line pressure

The boiler gas valve is equipped with a Line Pressure Test Port; see screw 1, Figure 5.
Use the following procedure to measure the gas line pressure to the boiler to ensure it falls within the range given in Table 2:

  • a.

  • b. Loosen screw 1 (Torx 10 – Line Pressure Test Port). This port is directly connected to the gas line feeding the boiler. See screw 1, Figure 5.

  • c. Connect a gas pressure gauge to the line pressure test port using applicable tubing. Ensure both ends of the tubing make a tight connection.

  • d. Turn the gas supply to the boiler on and check for gas leaks.

  • e. Observe the line pressure under static conditions and compare it to Table 2.
    The pressure will be greatest under static conditions.

  • f. Observe the line pressure with the boiler running, while checking/ adjusting the CO2 at maximum and minimum gas flow rate (see Part. 3).
    Compare it to Table 2. The pressure will be lowest during the maximum flow of gas.

  • g. Adjust the gas line pressure to ensure the parameters in Table 2 are attained under all conditions.
    If possible, adjust the line pressure to the “Nominal/Desired” value listed in Table 2 while the unit is operating at the maximum power.
    Continue observing gas line pressure until completing of necessary Checking/ Adjusting of the CO2 (see Part 3), in case adjustments need to be made.

  • h. Complete pressure testing. Remove the tubing from the test port and then return the bleed screw of the Line Pressure Test Port to the closed position. Check for gas leaks.
    Table 2 – Line Pressure Parameters | Line Pressure (inches w.c.)
    ---|---
    Nominal| Min.| Max.
    Natural| 7| 3.5| 10.5
    Propane| 11| 8| 13

DANGER Failure to close the bleed screw of the Line Pressure Test Port will cause a severe leakage of gas, resulting in a fire or explosion causing property damage, serious injury or death.

NOTICE The line pressure is a function of the gas supply and is affected solely by field provided parameters such as line size and regulator settings. Under no circumstances can the boiler gas valve influence or be used to adjust the gas line pressure.

Checking/Adjusting the CO2 at Max and Min Power

WARNING Adjustments to the Gas valve may only be made by a qualified gas technician, while using a calibrated combustion analyzer capable of measuring CO2 and CO. Adjustments may only be performed if the gas line pressure is maintained above minimum levels throughout the duration of the test. See Table 3. Failure to follow these instructions may result in serious injury or death.

WARNING FAILURE TO PERFORM THE FLUE GAS ANALYSIS AND ADJUSTMENT AS DETAILED IN THIS SECTION MAY RESULT IN ERRATIC AND UNRELIABLE BURNER OPERATION, LEADING TO REDUCED EFFICIENCY, INCREASED FUEL CONSUMPTION, REDUCED COMPONENT LIFE, HEAT EXCHANGER COMBUSTION DEPOSITS, AND GENERAL UNSAFE OPERATION. FAILURE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR DEATH.

Preparing the measuring equipment

Remove the Combustion Test Port plug, as illustrated (Figure 6), and insert a calibrated combustion analyzer.

NOTICE Make sure the analyzer is set to the appropriate fuel.

WARNING It is required to use a calibrated combustion analyzer to verify final adjustment according to the combustion chart (Table 3).
Failure to do so could result in serious personal injury or death.

WARNING It is very important that the combustion system be set within the recommended CO2/ CO measurements listed in Table 3. Visually looking at the burner does not determine combustion quality. Failure to measure combustion with a calibrated combustion analyzer and set the throttle within the recommended CO2/CO measurements could result in property damage, severe personal injury, or death.

Checking/Adjusting the CO2 at Max Power

Set the thermostat at the highest possible setting to create a demand for heat.
Select Max Power from the Test Mode
– Burner Test screen, then wait for the Burner Power gauge to reach 100%.

Wait 1 minute for the boiler to stabilize before carrying out the combustion analyses. Read the CO2 value (%) and compare it with the values given in the table below:
Table 3 – CO2 Max – Min

Gas CO 2 (%) CO (ppm)
Max Power (100%) Min Power (10%)
NG 8.7 – 10.0 8.5 – 9.8
LP 9.7 – 11.0 9.5 – 10.8

ATTENTION:
The CO2 at Min Power must be set lower than the CO2 at Max Power by 0.2 – 1.0% (e.g. if, using LP, the CO2 at Max Power = 10.3%, the CO2 at Min Power must be between 9.5 – 10.1%).

ATTENTION!! Values must be obtained with the front cover installed.
If the CO2 reading differs from the values given in Table 3, adjust the gas valve following the instructions below.
Otherwise move directly to the next operation.

Adjusting the Gas Valve at Max Power

Adjust the gas valve by turning setting screw 4 clockwise to increase the CO2 level; counterclockwise to reduce the CO2 level (1 turn adjusts the CO2 level by approximately 0.3%). Wait 1 minute after each change in setting for the CO2 value to stabilize.
If the measured value corresponds to the value given in Table 3, Max Power adjustment is complete.
Otherwise, continue with the procedure.

ATTENTION!! Test Function will automatically deactivate after 30 minutes. Test Function can be turned off manually by pressing the RESET button.

Checking/Adjusting the CO2 at Min Power

Select Min Power from the Test Mode – Burner Test screen, then wait for the Burner Power gauge to reach 10%.

Wait 1 minute for the boiler to stabilize before carrying out the combustion analyses.

If the CO2 (%) reading at Min Power is not 0.2 – 1.0% lower than the CO2 (%) reading at Max Power, adjust the gas valve following the instructions below.
Otherwise move directly to the next operation.

Adjusting the Gas Valve at Min Power

Remove cap and adjust screw 2 by turning counter-clockwise to reduce the CO2 level; clockwise increase it.
Wait 1 minute after each adjustment for the CO2 value to stabilize.

WARNING! Min Power adjustment is very sensitive.
If the value measured corresponds to the value given in Table 3, Min Power adjustment is complete. Otherwise continue with the procedure.

Attention!!
If Screw 2 has been adjusted, it is necessary to repeat the ‘Adjusting the CO2 at Max Power’ procedure.

Ending Adjustment

  1. Exit Test Mode by pressing the ‘Press to Stop Test’ button (located in the lower left corner of the Burner Test screen).
  2. Turn down the thermostat and / or stop the DHW draw.
  3. Reinstall the Combustion Test Port plug (see Figure 6).
  4. Check for and repair any gas leaks.
  5. Reinstall the front cover.

WARNING Carbon Monoxide – Never leave the unit operating while producing Carbon Monoxide (CO) concentrations in excess of the values indicated in Table 3. Failure to follow this warning may result in serious injury or death.

WARNING

**Breathing Hazard – Carbon Monoxide Gas

**

  • Do not operate heater if flood damaged.
  • Install vent system in accordance with local codes and manufacturers installation instructions.
  • Do not obstruct heater air intake or exhaust. Support all vent piping per manufacturers installation instructions.
  • Do not place chemical vapor emitting products near unit.
  • According to NFPA 720, carbon monoxide detectors should be installed outside each sleeping area.
  • Never operate the hea1er unless it is vented to the outdoors.
  • Analyze the entire vent system to make sure that condensate will not become trapped in a section of vent pipe and therefore reduce the open cross sectional area of the vent.’

Breathing carbon monoxide can cause brain damage or death.
Always read and understand instruction manual.
Table 4 Gas Input at Min and Max Power

Model Min Power Max Power
Burner Power MBH Burner Power
TFTN085 10 % 8.5
TFTN110 11.0 110
TFTN150 15.0 150
TFTN199 19.9 199

1.  Canada: Altitudes between 2000-4500 ft, de-rate by 10%. Consult local authorities for de-rating for altitudes above 4500ft.

2.  USA: De-rate capacity by 4% for every 1000 ft above sea level, if altitude is above 2000 ft.

Update rating plate

As the certified installer of the Natural Gas to LP Conversion Kit, you must indicate on the boiler that it has been converted for use with Propane (LP) Gas:

  • a. Update Rating Plate Decal – Locate the rating plate decal on the side of the appliance. Using a regular ink pen, check the box next to “Field converted to Propane Gas” and fill in the date.
    Press hard enough to permanently mark the decal. See Figure 9.
    Figure 9 – Update the Rating Plate Decal

  • b. Conversion Decal – Fill out the required information on the Conversion Decal (included in this kit) and affix it to the boiler cabinet adjacent to the rating plate decal, in a location where it can be easily seen. See Figure 10.

Figure 10 – Conversion Decal

THIS CONTROL WAS CONVERTED FOR USE WITH PROPANE GAS

This appliance has been converted for use with Propane Gas, in accordance with the instructions provided with the Natural to Propane Conversion Kit by John Smith , which accepts responsibility that the conversion was performed properly.

Reference rating plate for Propane Input and Gas Pressure

Visit us online

NTI Boilers Inc.
30 Stonegate Drive Saint John,
NB E2H 0A4 Canada
Technical Assistance: 1-800-688-2575
Website: www.ntiboilers.com
Fax: 1-506-432-1135

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

NTI User Manuals

Related Manuals